Text

-

Southern Nucle:r Operding Company Post Office Eox 1295 '

F Barrnlegh:m, Alab ma 35201 Telephone (205) 868-5131 Southern Nudear Operating Company oeve morey Vice President Farley Project November 18, 1996 the southern electnc System Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission

}

ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Revised Technical Specifications Bases for DNB Parameters - RCS Total Flow Rate Surveillance Ladies and Gentlemen:

)

i Attached are copics of revised Bases page B 3/4 2-5 for Farky Nuclear Plant Unit I and Unit 2 i

Technical Specifications. The changes to Bases 3/4.2.5, DNB Parameters, were made under the authority of 10 CFR 50.59 and have been reviewed and approved by the Plant Operations Resiew Committee. The changes allow the use of either the precision calorimetric-based flow measurement method or an alternate method using the cold leg elbow taps to satisfy the requirements of the eighteen month RCS total flow surveillance. No FNP Technical Specifications Limiting Conditions for Operation or Surveillance Requirements changes are required. The Unit 1 Bases change will be incorporated during the Cycle 15 refueling in 1997 in conjunction with the changes included in Amendment 121. The Unit 2 Bases change will be incorporated during the l

current Cycle 12 refueling in conjunction with Amendment i13 changes.

l i

If you have any questions, please advise.

Respectfully submitted, f

i f hT9%

l Dave Morey l

[

MGE:maf resflow3. doc l

Attachments j

cc:. Mr. S. D. Ebneter l

f d

Mr. T M. Ross Mr. J.1. Zimmerman U

/

9611270148 961118 PDR ADOCK 05000348 P

PDR l

9 ATTACHMENTS i

i

?

FNP Unit 1 Technical Specifications Changed Page List i

FNP Unit 1 Technical Specifications Typed Page FNP Unit 2 Technical Specifications Changed Page List FNP Unit 2 Technical Specifications Typed Page L

t i

I i

{

l l

I l

E I

'I i

-