Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A777 + (Forwards Rev 108 to EPIP Index,Rev 23 to EPIP 1.2, Notification & Rev 7,App 1 to EPIP Forms)
- HL-1899, Forwards Rev 10A to FSAR & Rev 7A to Fire Hazards Analysis & Fire Protection Program + (Forwards Rev 10A to FSAR & Rev 7A to Fire Hazards Analysis & Fire Protection Program)
- U-601852, Forwards Rev 10A to Physical Security Plan in Response to NRC .Rev Withheld (Ref 10CFR73.21(C)(2)) + (Forwards Rev 10A to Physical Security Plan in Response to NRC .Rev Withheld (Ref 10CFR73.21(C)(2)))
- BECO-93-070, Forwards Rev 10A to Pilgrim Nuclear Power Station COLR, Cycle 10 + (Forwards Rev 10A to Pilgrim Nuclear Power Station COLR, Cycle 10)
- ML20056E179 + (Forwards Rev 10A to Security Training & Qualification Plan, Per 10CFR50.54(p).Change Responds to Areas of NRC Concern Re Rev 10.Only Revised Pages Submitted.Pages Withheld,Per 10CFR73.21)
- ML20081K458 + (Forwards Rev 10A to Security Training & Qualification Plan. Encl Withheld)
- HL-2073, Forwards Rev 10B to Ei Hatch Nuclear Plant FSAR & Rev 7B to Plant Fire Hazards Analysis Rept + (Forwards Rev 10B to Ei Hatch Nuclear Plant FSAR & Rev 7B to Plant Fire Hazards Analysis Rept)
- U-601859, Forwards Rev 10B to Physical Security Plan for Plant.Rev Withheld (Ref 10CFR73.21(c)(2)) + (Forwards Rev 10B to Physical Security Plan for Plant.Rev Withheld (Ref 10CFR73.21(c)(2)))
- ML20056E186 + (Forwards Rev 10a to Security Training & Qualification Plan, Per 10CFR50.54(p).Change Responds to Areas of NRC Concern of Rev 10.Only Revised Pages Submitted.Pages Withheld,Per 10CFR73.21)
- ML20128G770 + (Forwards Rev 11 & Detailed Synopsis to Physical Security Plan.Rev & Synopsis Withheld (Ref 10CFR73.21))
- NSD-NRC-98-5612, Forwards Rev 11 of AP600 PRA Rept Which Has Been Revised to Incorporate Commitments W Made in Responses to RAIs & FSER Open Items.Staff Is Requested to Provide NRC Status for Open Items + (Forwards Rev 11 of AP600 PRA Rept Which Has Been Revised to Incorporate Commitments W Made in Responses to RAIs & FSER Open Items.Staff Is Requested to Provide NRC Status for Open Items)
- ML20082G304 + (Forwards Rev 11 of Cooper Nuclear Station QA Program & Summary of Changes)
- GO2-91-177, Forwards Rev 11 of Emergency Preparedness Plan,Reflecting Changes to Section 11.6.1,Page 11-7,Section 4.4.2.1,Page 4-26,Section 4.4.2.5,Page 4-32,Item F,Section 14.4.1,Page 14-3 & Section 6,Table A.2 + (Forwards Rev 11 of Emergency Preparedness Plan,Reflecting Changes to Section 11.6.1,Page 11-7,Section 4.4.2.1,Page 4-26,Section 4.4.2.5,Page 4-32,Item F,Section 14.4.1,Page 14-3 & Section 6,Table A.2)
- ML20212E197 + (Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions)
- ML20091Q231 + (Forwards Rev 11 of Inservice Testing Program for Pumps & Valves)
- L-97-311, Forwards Rev 11 of Physical Security Plan & Summary of Changes,Per 10CFR50.54(p).Plan Withheld,Per 10CFR2.790(a)(3) + (Forwards Rev 11 of Physical Security Plan & Summary of Changes,Per 10CFR50.54(p).Plan Withheld,Per 10CFR2.790(a)(3))
- ML20057E893 + (Forwards Rev 11 of Psp,Section 11,Page 11-1.Rev Allows Authorized Individuals Granted Unescorted Access to Security Area to Leave Badges in Controlled Access Area W/O Wearing Badges During Normal Working Hours.Encl Withheld)
- ML20195J845 + (Forwards Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan, as Change Previously Made Without Appropriate Notification to NRC)
- ML20137B529 + (Forwards Rev 11 to 6610-PLN-4200.01, Odcm. Rev 11 of ODCM Contains Change Bars Identifying Substantive Changes Made to ODCM During 1995)
- ML20137B534 + (Forwards Rev 11 to 6610-PLN-4200.01, Odcm. Rev 11 of ODCM Contains Change Bars Identifying Substantive Changes Made to ODCM During 1995)
- ML20204D563 + (Forwards Rev 11 to AP-250, Radiation Monitor Actuation, Rev 10 to AP-513, Toxic Gas & Rev 22 to AR-603, Tgf O Annunciator Response)
- ML20091E759 + (Forwards Rev 11 to Analysis of Hydrogen Control Measures at McGuire Nuclear Station, for Insertion in Section 7.0 of Vol 3.Response to NRC 840508 Questions Provided)
- ML20046B244 + (Forwards Rev 11 to Beaver Valley Power Station,Unit 1 Updated FSAR, Including Changes Identified in Annual Rept of Facility Changes,Tests & Experiments,Per 10CFR50.59 & Change of QA Category from Category 1 to Category 2)
- ML20210P776 + (Forwards Rev 11 to CNEI-0400-24, Catawba Unit 1 Cycle 10 Colr. New Monitoring Factors Have Been Implemented to Reflect New K(Bu) Curve)
- ML20058F332 + (Forwards Rev 11 to CPC-2A, QA Program Description for Operational Nuclear Power Plants)
- TXX-9507, Forwards Rev 11 to CPSES Fire Protection Rept + (Forwards Rev 11 to CPSES Fire Protection Rept)
- ML20078H783 + (Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet)
- TXX-9720, Forwards Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval + (Forwards Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval)
- ULNRC-03752, Forwards Rev 11 to Callaway Cycle 9 COLR, Providing Updated Modified Rod Insertion Limits for Cycle 9.Rept Submitted Per TS 6.9.1.9 + (Forwards Rev 11 to Callaway Cycle 9 COLR, Providing Updated Modified Rod Insertion Limits for Cycle 9.Rept Submitted Per TS 6.9.1.9)
- ML20137S467 + (Forwards Rev 11 to Catawba Unit 1 Pump & Valve Inservice Testing Program, & Rev 1 to Catawba Unit 2 Pump & Valve Inservice Program.)
- ML20137S463 + (Forwards Rev 11 to Catawba Unit 1 Pump & Valve Inservice Testing Program, & Rev 1 to Catawba Unit 2 Pump & Valve Inservice Program)
- ML20129C193 + (Forwards Rev 11 to Certificate of Compliance 9111 for Models CNS 6-80-2 & CNS 6-80-2A)
- ML20129C196 + (Forwards Rev 11 to Certificate of Compliance 9111 for Models CNS 6-80-2 & CNS 6-80-2A)
- ML20012D655 + (Forwards Rev 11 to Certificate of Compliance 5980 for Model GE-600,per 900227 Applicaton.Approval Constitutes Authority to Use Package for Shipment of Radioactive Matl & for Package to Be Shipped in Accordance w/49CFR173.471)
- ML20140C910 + (Forwards Rev 11 to Certificate of Compliance 5026 for Model CNS 14-190)
- ML20140C914 + (Forwards Rev 11 to Certificate of Compliance 5026 for Model CNS 14-190)
- ML20141G397 + (Forwards Rev 11 to Certificate of Compliance 5942 for Model 700)
- ML20141G401 + (Forwards Rev 11 to Certificate of Compliance 5942 for Model 700)
- ML19324A980 + (Forwards Rev 11 to Certificate of Compliance 6003 for Model M-130)
- ML20055D052 + (Forwards Rev 11 to Certificate of Compliance 6144 for Model B-2)
- ML20127E378 + (Forwards Rev 11 to Certificate of Compliance 9094,for Model CNS 14-195-H Package)
- ML20127E382 + (Forwards Rev 11 to Certificate of Compliance 9094,for Model CNS 14-195-H Package)
- ML20245C787 + (Forwards Rev 11 to Certificate of Compliance 9022 for Model CE-250-2 Shipping Package)
- ML20154C782 + (Forwards Rev 11 to Certificate of Compliance 5908 for Model DOT-6M Type B)
- ML20202G343 + (Forwards Rev 11 to Chapter 57 of BVPS Emergency Preparedness Plan, Vol 1,per 10CFR50.4.Submittal Includes Info Re Implmentation of Severe Accident Management Guidelines.Changes Do Not Decrease Effectiveness of Plan)
- ML18052B400 + (Forwards Rev 11 to EM-09-02, Inservice Testing of Plant Valves, & Rev 11 to EM-09-04, Inservice Testing of Selected Safety-Related Pumps)
- ML18052B401 + (Forwards Rev 11 to EM-09-02, Inservice Testing of Plant Valves, & Rev 11 to EM-09-04, Inservice Testing of Selected Safety-Related Pumps.)
- ML20035D270 + (Forwards Rev 11 to EPP 01-2.1 & Rev 35 to WCGS RERP)
- HL-1865, Forwards Rev 11 to Ei Hatch Nuclear Plant Units 1 & 2 Emergency Plan. Amend Clarifies Terminology & Editorial Corrections to Emergency Classification Tables & Updates Population Figures in Agreement W/State of Ga Plan + (Forwards Rev 11 to Ei Hatch Nuclear Plant Units 1 & 2 Emergency Plan. Amend Clarifies Terminology & Editorial Corrections to Emergency Classification Tables & Updates Population Figures in Agreement W/State of Ga Plan)
- 0CAN109011, Forwards Rev 11 to Emergency Plan + (Forwards Rev 11 to Emergency Plan)
- ML20154B990 + (Forwards Rev 11 to Emergency Plan & Revised Emergency Implementing Procedures,Including Rev 40 to FNP-0-EIP-008 & Rev 13 to FNP-0-EIP-026,per Administrative Procedure FNP-0-AP-4)