ML20046B244

From kanterella
Jump to navigation Jump to search
Forwards Rev 11 to Beaver Valley Power Station,Unit 1 Updated FSAR, Including Changes Identified in Annual Rept of Facility Changes,Tests & Experiments,Per 10CFR50.59 & Change of QA Category from Category 1 to Category 2
ML20046B244
Person / Time
Site: Beaver Valley
Issue date: 07/23/1993
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046B245 List:
References
NUDOCS 9308030392
Download: ML20046B244 (3)


Text

pp w

10 CFR 50.71(c)

Beaver Valley Power Station SNppingport, PA 15077-0004 JOHN D. SIEBER (412) 393-5255 Senior Wce President and Fax (412) 643-8069 cNef Nuclear Officer July 23, 1993 Nuclear Power Dfvision U.

S. Nuclear Regulatory Commission E

Attn:

Document Control Desk Washington, DC 20555 r

Subject:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Revision 11, January 1993 This letter forwards a

signed original and ten (10) copies of Revision 11 replacement pages for the Beaver Valley Power Station, Unit No.

1 Updated Final Safety Analysis Report (FSAR).

The submittal reflects changes to the facility and procedures as described in the FSAR that were comnleted during the annual reporting period ending January 22, 1993.

To the best of our judgement and belief, this revision accurately presents changes made since the previous submittal necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

This revision includes:

Changes identified in the annual " Report of Facility Changes Tests and Experiments" which is being submitted under the provisions of 10 CFR 50.59.

A change to the Quality Assurance Category (from Category 1 to Category 2) of temperature indicators TI-RW-110A & B.

These temperature indicators provide local indication for primary component cooling water heat exchangers.

A change to move the list of Quality Assurance Category 1

systems, structures and components from the Quality Assurance Manual to the YSAR.

The change will make the list more accessible since the FSAR is referred to as a key source for design and licensing information.

.s s

4 g

030000 pC ascuuc ununor y0 g

mma il 9308030392 930723

,p PDR ADOCK 05000334 K

i PDR I

BSever Valloy Power Station, Unit No. 1 Docket'No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Revision 11, January 1993 Paga 2 A

change to delete the requirement for periodic part-stroke testing of each main steam isolation valve in accordance with Technical Specification Amendment No. 162.

Editorial changes intended to correct or clarify the text and figures of the FSAR.

"f you have any questions concerning the attached, please contact Mr. Nelson R. Tonet at (412) 393-5210.

Sincerely,

,h J.

D.

Sieber Attachments cc:

Mr.

L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. G.

E.

Edison, Project Manager Mr. M.

L. Bowling (VEPCO) 1

AFFIDAVIT r

COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER

)

i

Subject:

Beaver Valley Power Station, Unit No. 1 BV-1 Docket No. 50-334, License No. DPR-66 4

Updated Final Safety Analysis Report l

t Before me, the undersigned notary public, in and for the County and.

Commonwealth aforesaid, this day personally appeared Joh4 D.

Sieber, to me known, who being duly sworn according to law, deposes and says that he is Senior Vice President and Chief Nuclear Officer of the Nuclear Power
Division, Duquesne Light Company, he is duly t

authori7ed to execute and file the foregoing submittal on behalf of said

Company, and the statements set forth in the submittal are true i

and correct to the best of his knowledge, information and belief.

i

/

John D.

Sieber i

r Subscribed and sworn to before me

[(!dayo

/-

-/ /

on thic b

f) fl>

4 H./

Notary Public

NW Sg Shena M. Fattore Matay PR Srgrgat Boro. hr %7 M NNoiEces Soot.26,1tG4

/

M'"'W Vvmyvwa tuavanan a u,m J