ML20137S463
| ML20137S463 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/27/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137S467 | List: |
| References | |
| NUDOCS 8512060247 | |
| Download: ML20137S463 (2) | |
Text
DUKE Pownn Go>mm I'.O. BOX 33180 CIIAHLOTTE, N.C. 28242 IIAL II. TUCKER ELEPHOME m,.., n (704) 373~8538 IrtM. LEAR PRODENTION Novmeber 27, 1985 Mr. Harold R. Denton, Director
-Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Attention:
Mr.
B.
J.
Youngblood, Director PWR Project Directorate No. 4 Re:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
Enclosed are six copies of Revision 11 (Unit 1) and Revision 1 (Unit 2) to the Catawba Nuclear Station Pump and Valve Inservice Testing Program.
These should be incorporated into the existing Pump and Valve Inservice Testing Manual removing any earlier revision pages of the program.
Very truly yours, w
Hal B.
Tucker RWO: sib Enclosures cc:
(w/o enclosures)
Dr. J.
Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr.
P. K. VanDoorn NRC Resident Inspector Catawba Nuclear Station Jh b
0512060247 851127 ADOCK05000gg3 PDR P
. =..
a CATAWBA NUCLEAR STATION PUMP AND VALVE INSERVICE TESTING PROGRAM UNIT 1 - REVISION 11 i.
REMOVE INSERT Unit 1 Program (Complete)
Unit 1 Program (Complete,167 pages)
UNIT 2 - REVISION 1 REMOVE INSERT 1
Unit 2 Valve Inservice Testing Unit 2 Valve Inservice Testing Committments Printout (Pages 1-72)
Committments Printout (Pages 1-74)
Rev. O Rev. 1 Relief Request #C03 O
Page II-0-9a (1 page)
Title Page - Rev. O Title Page - Rev.1 (1 page)
(1 page)
Relief Request #Hil - Rev. O Relief Request #Hil - Rev.1 Page II-D-29 (1 page)
Page II-D-29 (1 page)
O c.