ML20204D563

From kanterella
Jump to navigation Jump to search
Forwards Rev 11 to AP-250, Radiation Monitor Actuation, Rev 10 to AP-513, Toxic Gas & Rev 22 to AR-603, Tgf O Annunciator Response
ML20204D563
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/10/1999
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204D567 List:
References
NUDOCS 9903240242
Download: ML20204D563 (1)


Text

m

_ Ament Transmittal #: 112367 Date: 3/10/99 r-To:

NRC (CC DESK)

MAC: N/A Holder #: 1242 Destination:

Descriptica:

Copy Totals Document:

Revision:

ll iC# Comment:

INF CTL MST AP0250 11 1

0 0

?

AP051?.

10 1

0 0

AR0603 22 1

0 0

E 6

L Instructions to the Addressee: Please verify the document (s) receivea agrees with the above information. Notify Document Control if changes are required to addressee information, or mark the transmittal and return as indicated below.

E Engineering rnanagers are required by NEP-121 to determine if now, revised, or temporary changes to procedures affectjob functions of their personnel Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Tiaining Coordinator.

Opershons departrnent must attach old document (s) or portions of document (s) superseded by the above to this transmittal The signature indicates ahnowledgment of receipt of the above document (s) rM that 6cuments have been updated. Retum signed and dated transmittel to Document Control withih 15 working days of transmittal det to mral code:

r oI c4009 SA2A eg Florida Power' Corporation g-j

\\

Document Control, SA2A L

Crystal River Energy Complex

,;,\\

18780 W. Power Line st.

Crystal River, FL 34428 6708

=

Signature of Addressee:.

Date:

9903240C42 990310 I~

PDR ADOCK 0500(rJ02 r

F PDR L

...