Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Re Financial Qualifications". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20024G406  + (Forwards Request for Addl Info Re Facility Suppression Pool Temp Transients)
  • ML19262C199  + (Forwards Request for Addl Info Re Facility Safeguards Contingency Plan.Comments Withheld (Ref 10CFR2.790).Requests Response within 30 Days)
  • ML20210T512  + (Forwards Request for Addl Info Re Facility Safety Monitoring Sys Verification & Validation (V&V).Expected Date of V&V Completion Also Requested)
  • ML18054B365  + (Forwards Request for Addl Info Re Facility Second 10-yr Interval Inservice Insp Program,For Completion of Review & Evaluation)
  • ML19260D734  + (Forwards Request for Addl Info Re Facility Contingency Plan. Request Withheld (Ref 10CFR2.970))
  • ML20039H091  + (Forwards Request for Addl Info Re Facility for Use in Acceptance Review.Data Re Mass & Energy Release to Containment Resulting from LOCA Needed)
  • ML17212A340  + (Forwards Request for Addl Info Re Facility Fsar.Response Should Be Submitted by 810710)
  • ML19256G379  + (Forwards Request for Addl Info Re Facility Cycle 2 Reload Amend to Complete Review of 791102 Submittal)
  • ML20237C236  + (Forwards Request for Addl Info Re Facility Modified Control Room Habitability Sys,Per 871109 Onsite Review.Sys Operability During All Modes of Operation Will Be Verified)
  • ML20004E182  + (Forwards Request for Addl Info Re Facility Compliance W/ Current Operational Requirements.Response Should Be Submitted within 30 Days)
  • ML18153A131  + (Forwards Request for Addl Info Re Facility Third 10-yr Interval Inservice Insp Program Plan Request for Relief)
  • ML19339A764  + (Forwards Request for Addl Info Re Facility Meteorological Program.Info Requested within 90 Days.Ack Util Commitment to Provide Radiological Dose Analyses by 760806)
  • ML20055E531  + (Forwards Request for Addl Info Re Facility Control Assembly Action Program,Per 900607 Control Element Assembly Failure at Maine Yankee.Confirmation of NRC Understanding That Util Intends to Implement C-E Plan Also Requested)
  • ML19257B811  + (Forwards Request for Addl Info Re Factors Which Affect Tailings Mgt Scheme of Proposed San Miguel Project.Questions to Be Answered within 2-3 Wks)
  • ML20202D017  + (Forwards Request for Addl Info Re Fast Neutron Fluence, Including Data for Weld SA-1526,per 10CFR50.61.Response Requested within 30 to 60 Days from Ltr Receipt)
  • ML20141F298  + (Forwards Request for Addl Info Re Fast Neutron Fluence Used in Derivation of PTS Ref Temp.Encl Describes Specifics of Info Needed.Info Requested within 45 Days of Ltr Receipt)
  • ML20211N879  + (Forwards Request for Addl Info Re Feedline Break Events & Peak Reactor Coolant Sys Pressure,Per Listed Requests to Modify Tech Spec Limiting Condition for Operation 3.1.1.4 & Issues Per Unit 2 Cycle 8 Reload License Submittals)
  • ML18051B024  + (Forwards Request for Addl Info Re Fes & Final Addendum in Preparation for Conversion of Provisional Ol.Response Requested within 30 Days of Ltr Receipt)
  • ML19339A133  + (Forwards Request for Addl Info Re Fiesta Code Contained in CEN-133 Re Cycle 5 Reload)
  • ML19319D573  + (Forwards Request for Addl Info Re Figures 14-60,61,62,63,64 & 65 of FSAR for Inclusion in Question List for Util)
  • ML19326A805  + (Forwards Request for Addl Info Re Financial Qualifications of Util & Participants to Operate,Shutdown & Maintain Facility Safely)
  • ML19259A788  + (Forwards Request for Addl Info Re Financial Status & Analyses of Containment Temp Response to Postulated Main Steam Line Breaks)
  • ML20040B086  + (Forwards Request for Addl Info Re Financial Qualifications to Operate Facility,To Complete Review of FSAR & Prepare Ser.Info Requested within 30 Days)
  • ML17209B093  + (Forwards Request for Addl Info Re Financial Info Necessary for Operation & Maint of Plant.Response Requested by 810717)
  • ML20033A322  + (Forwards Request for Addl Info Re Financial Qualifications to Complete Evaluation of FSAR)
  • ML20039H201  + (Forwards Request for Addl Info Re Financial Qualifications)
  • ML20211K095  + (Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days)
  • ML20235W887  + (Forwards Request for Addl Info Re Fire Barrier Penetration Seal Testing.Info Requested by 890324)
  • ML20210S685  + (Forwards Request for Addl Info Re Fire Barrier Rating Fire Protection Sys & Diesel Day Tanks to Assist in Review of PSAR Amend 28)
  • ML20045E761  + (Forwards Request for Addl Info Re Fire Barriers Mfg by Thermal Ceramics,Inc.Response Should Be Submitted within 30 Days of Ltr Date)
  • ML15264A438  + (Forwards Request for Addl Info Re Fire Loads,Fire Protection Features & Piping Penetrations,For 861111 Request for Exemptions from Technical Requirements of 10CFR50,App R, Sections Iii.G & Iii.J)
  • ML20059F092  + (Forwards Request for Addl Info Re Fire Protection Modeling in Probability Safety Assessment.Answers to Questions Will Form Basis for 900919 Meeting in Rockville,Md)
  • ML20079F439  + (Forwards Request for Addl Info Re Fire Protection Program Needed to Complete Review.Info Needed by 821102)
  • ML17278A850  + (Forwards Request for Addl Info Re Fire Protection Program, Based on Review of Documents Resulting from Mar 1986 Fire Protection Audit)
  • ML20126H538  + (Forwards Request for Addl Info Re Fire Protection for FSAR Review.Table Should Be Provided Listing Instrumentation & Vital Support Sys Equipment to Achieve & Maintain Hot &/Or Cold Shutdown.Response Requested by 810515)
  • ML19207B819  + (Forwards Request for Addl Info Re Fire Protection Sys, Instrument & Control Sys,Matls Engineering & Radiological Control Sys & Matls Engineering & Radiological Assessment, Based on 790402-05 Site Visit)
  • ML18017B939  + (Forwards Request for Addl Info Re Fire Protection & Reactor Fuels.Responses Should Be Provided by 820802 in Form of Amend to FSAR)
  • ML20207A935  + (Forwards Request for Addl Info Re Fire Protection Program Revs.Requests Response by 860721)
  • ML19317D245  + (Forwards Request for Addl Info Re Fire Protection Program Discussed at 771001 Meeting.Nrc Positions Encl)
  • ML19269D906  + (Forwards Request for Addl Info Re Fire Protection to Complete Safety Evaluation)
  • ML19329B064  + (Forwards Request for Addl Info Re Fire Protection Review of Personnel QA Program by 780923)
  • ML20008D969  + (Forwards Request for Addl Info Re Fire Protection Training Program & Definition of Area of Secondary Attention)
  • ML18085B110  + (Forwards Request for Addl Info Re Fire Protection.Response Should Be Submitted within 90 Days.Request Does Not Change Acceptability of Fire Protection Program for Full Power Operation)
  • ML19296A336  + (Forwards Request for Addl Info Re Fire Protection.Staff Requirements for Min Safe Shutdown & Fire Protection Sys Encl)
  • ML20052F976  + (Forwards Request for Addl Info Re Fire Protection Rule Requirements.Complete Response Required within 6 Months of Receipt of Ltr.Rewording of Generic Ltr 81-12 Request for Addl Info Encl)
  • ML19350A219  + (Forwards Request for Addl Info Re Fire Protection Design. Addl Info Should Be Incorporated Into Fsar.Requests Response within 6 Wks)
  • ML20062F925  + (Forwards Request for Addl Info Re Fire Protec Prog.Suppl 781114 NRC Request Resulting from Review of 780530 Facil Submittal on Administrative Controls)
  • ML20235L826  + (Forwards Request for Addl Info Re Fire Protection of Safe Shutdown Capability,In Response to Util 860916,0206,0430, 0610 & 13 Exemption Requests.Response to Be Submitted within 90 Days)
  • ML14192A053  + (Forwards Request for Addl Info Re Fire Protection Program. Licensee Has Yet to Meet All Administrative Control Requirements Outlined in NRC .Fire Brigade Drills Must Be Performed in Plant to Promote Teamwork)
  • ML20148P980  + (Forwards Request for Addl Info Re Fire Protec at Subj Facil. Several NRC Staff Positions Are Encl Re Concern on This Subj)
  • ML19345H637  + (Forwards Request for Addl Info Re Fire Protection to Complete Evaluation of Fsar.Responses to Be Submitted by 810615)