,y q
e c. ;,,. _.
X
'F 2
.Februaryf23, 1989 LDocket Nos. 50-313--
l
~
andL50-368~
g Mr. T. Gene Campbell LVice President, N6 clear Operations =
Arkansas Power &; Light:Companyi lP.O. Box 551:
Little Rock, Arkansas.72203'
Dear. Mr. Campbell:
' j E
SUBJECTS FIRE BARRIER PENETRATION SEAL TESTING, ARKANSAS NUCLEAR ONE,
-UNITS 1 AND 2 - REQUEST FOR ADDITIONAL'INFORMATION (TAC NOS. 61995'and 61996) 3-e 0n December.23,1988 you submitted to the. staff the results of testing you.had
- performed on the types of. fire barrier penetration. seals used tat Arkansas
. : Nuclear ~0ne.
In order for us to complete our review we need additional
.information as described in the enclosure. Please provide this information in
~
writing by March 24, 1989.
?lheLreporting and/or recordkeeping requirements contained in this letter
~
dffects fewer than ten respondents; therefore, OMB clearance:is not. required.
.under P.L.96-511..
S',ncerely.
/s/-
C.icraig Harbuck, Project Manager I
Project. Directorate --IV.
Division'of Reactor Projects - III, IV, 'I and'Special Projects
' Office' of Nuclear Reactor Regulation
/s/
Chester Poslusny, Jr., Project Manager Project Directorate - IV Division of Reactor Projects - III',-
-IV,'V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
pl See next page
( (
DIS 1RIBUTION:
IUiIctat;M Ie; NRC PDR-Local PDR PD4 Reading JCalvo LRubenstein PNoonan CHarbuck L
CPoslusny Edordan BGrimes Plant File 0GC ACRS(10)
.PD4/L @
.PD4/P PD4/PM PD4/D I PNoonafi.
CHarbuc
= CPoslusny:bj JCalvo
- 024Lh/89 02/A3/89.
02/if'89 02/2)/89 2
89031302'8 890223 POR ADOCK 05000313 E
- F PDC
i c.t
~
8[gaio
'o,j UNITED STATES n'
NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D. C. 20665
.g
- /
February 23, 1989 Docket Nos. 50-313 and'50-368-Mr. T. Gene Campbell Vice President, Nuclear Operations Arkansas Power 8 Light Company P.O. Box 551 i
Little Rock, Arkansas 72203 l
Dear Mr. Campbell:
SUBJECT:
FIRE BARRIER PENETRATION SEAL TESTING, ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (TAC N05. 61995.and 61996)
On December 21,1988 'you submitted to the staff the results of testing you had performed on the types of. fire barrier penetration seals used at Arkansas Nuclear One.
In order for us to complete our review we need additional information'as described in the enclosure. Please provide this information in writing by March 24, 1989.
The reporting and/or recordkeeping requirements contained in this letter affects~ fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
i Sincerely, h
C. Craig Harbuck, Project Manager Project Directorate - IV i
Divisich of Reactor Projects
- III, IV, V and Special Projects Office of Nuclear Peactor Regulation flwbt f
Chester Posluny, yJr., Project Manager Project Directorate - IV 1
['
Division of Reactor Projects - III,
[
IV, V'and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page i
p.
4 a
2.
L'
. Mr..T. Gene-Campbell.
Arkansas Nuclear.One Arkansas Power 8 Light Company Unit Nos. I ar.d 2 Cc' Mr. Pan R. Howard, Manager Mr. Charles B. Brinkman', Manager Lice ging Washington Nuclear Operations Arkansas Nuclear One Combustion Engineering, Inc.
P. O. Box 608-12300 Twinbrook Parkway, Suite 330 Russellville, Arkansas 72801 Rockville, Maryland-20852 Mr. James M. Levine, Executive Director Site Nuclear Operations Honorable William Abernathy
- Arkansas Nuclear One County Judge of Pope County P. O. Box 608 Pope County Courthouse Russellville, Arkansas 72801 Russellville,. Arkansas 72801 Nicholas S. Reynolds, Esq.
Bishop, Cook, Purcell
& Reynolds
- 1400 L Street, N.W.
Washington, D.C.
20005-3502 Regional Administrator, Region IV
' ').S. Nuclear Regulatory Commission Office of Executive Director for-Oper6tions.
,. 611 Ryan Plaza Drive, Suite 1000 Arlington,-Texas 76011 Senior Resident Inspector U.S. Nuclear Regulatory Commission
- 1 Nuclear Plant Road Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Environmental Health Protection
- Arkansas Department of Health 4815 West Markam Street Little Rock, Arkansas 72201
- Mr. Robert B.-Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 1
______....________________________o
ENCLOSURE-REQUEST FOR ADDITIONAL INFORMATION
-The following questions pertain to the submittal dated December 21, 1988.
1.
What test detail corresponds to plant detail 23 on drawing A-307? In addition, there does not appear to be any reference to specific design criteria on the plant detail such as maximum blackout size and conduit or pipe size.
l 2.
The test data shows that detail 19b failed the hose stream test. What requirements are established to prevent detail 19 from being used in a configuration where detail 19b is actually used to protect safe shutdown.
equipment?-
3.
What test detail corresponds to. plant detail 1 on drawing 2508? Previous drawings showed that test B&B 1001A was the basis for acceptability of this design. Why was this changed to the recent test on the latest drawing revision?
i
-