Forwards Request for Addl Info Re Fire Protec Prog.Suppl 781114 NRC Request Resulting from Review of 780530 Facil Submittal on Administrative Controls
ML20062F925
Person / Time
Site: Crystal River 
Issue date: 11/21/1978
From: Reid R
Office of Nuclear Reactor Regulation
To: Stewart W
FLORIDA POWER CORP.
References
NUDOCS 7812210453
Download: ML20062F925 (5)


Text

. _ -

MC PDR f.

UNITED STATES 3"

NUCLEAR REGULATORY COMMISSION f

~

h WASHINGTDN. D. C. 20666

  • ..../

November 21, 1978

+4 Docket No. 50-302 M.. W. P. Stewart

[

Director, Power Production Florida Power Corporation P. O. Box 14042, Mail Stop C-4

~

St. Petersburg, Florida 33733

Dear Mr. Stewart:

By letter dated November 14, 1978 we requested additional information regarding the Crystal River Unit No. 3 fire protection program.

Enclosed, please find a supplement to that request resulting from our review of your May 30, 1978 submittal on adninistrative controls.

Again, you should be prepared to discuss these items at the forthcoming site visit and provide your written response within 30 days from receipt of this letter.

Sincerely, hs

/)

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Enclosure:

Request for Additional Information a

cc w/ enclosure: See next page

~

78122104D' I

Florida Power Corporation cc: Mr. S. A. Brandimore Vice President and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629 1

(

(

\\

e O

O w

~

REQUEST FOR ADDITIONAL _INFORMATION CRYS 1AL RIVER UNIT #3 P-5 Section 1.0 under Fire Brigade Training of the licensee's response to Attachment 2 of " Nuclear Plant Fire Protection Functional Respon-sibilities, Administrative Controls and Quality Assurance," states that the proposed frequency of classroom training will be once per year on a staggered, basis.

The proposed frequency for fire brigade classroom instruction Cannual) does not provide adequate training to assure personnel familiarization with the fire hazards, fire fighting equipment and tactics to be used in suppressing fires manually.

NRC Position Provisions should be made for regular planned meetings, held every 3 months, to repeat the classroom instruction program within a two year period.

72.

Confirm that the folLowing provisions of NRC's document " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance" are met or provide justification for any exceptions:

a.

Fire fighting procedures are documented and include strategies for fighting fires in all safety related areas and areas presenting

. ~.

.. ~ - _..

a hazard to safety related equipment.

b.

Documented fire fighting strategies include the subjects covered in subsection d(1) through d(10) of At'tachment 5 to the above document.

c.

Administrative procedures have been established to ensure a periodic inspection for accumulation of combustibles.

d.

Administrative procedures have been established to ensure t

/ i that all wood used in safety related areas is treated with a flame retardant.

e.

Administrative procedures have been established which ensure that open flame or combustion smoke for leak testing is pro-hibited.

f.

Administrative procedures require that the person (s) responsible for physically surveying the work area and issuing the hot work permit has received a basic industrial fire fighting and fire prevention course.

g.

Administrative procedures relative to proposed work activities require a review to identify potential transient fire loads which exceed the capacity of the installed fire suppression syste and that omrtable sure.resrion ecaidnent shall be broucht into the area.

.e<.

~

- ~

h.

The Quality Assurance provisions established for fire pro-tection wiLL fully implement the QA criteria of Appendix A

.to BTP 9.5-1.

\\