Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245H851 + (Forwards Plant Biweekly Status Rept for 890129-0210)
- ML20235T968 + (Forwards Plant Biweekly Status Rept for 890211-24)
- ML20246N575 + (Forwards Plant Biweekly Status Rept for 890812-25)
- ML20195B928 + (Forwards Plant Biweekly Status Rept for Period 880521-0603)
- ML20245E656 + (Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing)
- ML20154F328 + (Forwards Plant Biweekly Status Rept for 880813-26.Rept Intended to Provide NRC & Public W/Overview of Plant Activities & NRC Insp Activities)
- ML20246E528 + (Forwards Plant Boraflex Surveillance Program Rept,For Info. W/Certificate of Svc)
- U-602438, Forwards Plant COLR for Reload 5/operating Cycle 6 + (Forwards Plant COLR for Reload 5/operating Cycle 6)
- ML20199B251 + (Forwards Plant Calculations That Addresses Peak Main Steamline Break Pressure of 46.33 Psig & Max Strain in Containment Liner Due to Surface Temp of 273 F)
- ML20136E569 + (Forwards Plant Calendar Update)
- ML20042G259 + (Forwards Plant Citizens Monitoring Network Rept Covering Period 900422-28.No Unusual Amounts Recorded During Reporting Period)
- NL-89-593, Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request + (Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request)
- ML18039A401 + (Forwards Plant Complete Set of TS & Bases Pages Which Includes Suppl Changes & Revs Made Subsequent to Original Submittal of TS-362,per NRC 980529 Request That Util Provides Certified TS Pages for Conversion to Improved TS)
- ML20237F205 + (Forwards Plant Configuration Mgt Program (CMP) Schedule & Status of Tasks.Summary of control-related Commitments Given.Cmp Schedule Delayed by Restart Due to 850609 Event. Programmatic Enhancements Anticipated by 880131)
- ML20237G572 + (Forwards Plant Cycle 3 Radial Peaking Factor Limit Rept,Per Tech Specs Section 6.9.1.9)
- ML14188B375 + (Forwards Plant Data List to Assist Development of Info for Implementation of Generic Issue Solutions at Facility.Nrc Developed long-term Program Which Will Improve Documentation on Status of Power Reactor Licensees)
- ML18151A055 + (Forwards Plant Data Lists for Addition of Omitted Significant Actions & Provision of Date That All Aspects of Each Identified Requirement Completed/Implemented as Part of Effort to Ensure Implementation of Generic Issue Solutions)
- ML20235E085 + (Forwards Plant Data Lists for Review & Inclusion of Omitted Significant Actions & Date That All Aspects of Each Identified Requirement Completed/Implemented.Response Requested by 870930)
- ML20237K771 + (Forwards Plant Data for Safety Issues Management Sys. Requests Info Re Addl Significant Issues,Nonapplicable Issues for Deletion & Date or Projected Date of Completion for Each Issue,By 870915)
- ML20237K429 + (Forwards Plant Data for Safety Issues Mgt Sys for Review. Util Requested to Inform NRC of Data That Should Be Deleted or Added & Provide Date Each Issue Completed/Implemented or Projected Date Issue Will Be Complete.Response by 870915)
- ML19325E238 + (Forwards Plant Decommissioning Funding Plan & Trust Agreement.Util Recommends That Listed Items Be Kept in Mind During Review & Method for Implementation of Plan Listed)
- ML20199D971 + (Forwards Plant Defueled TS Administrative Replacement Pp.On 990104 Staff Informed NRC That Pp Numbering for Table of Contents Was Incorrect.Subj Pp Requested to Be Replaced with Encl)
- ML20235D724 + (Forwards Plant Design Rept BSEP DR-7, Containment Design Rept, Submitted in Partial Fulfillment of Commitment Re ACRS Concern 3.0 Stated in Suppl 6 to Psar.Rept Provides Summary of Containment,Including Scaled Load Plots)
- ML20235D827 + (Forwards Plant Design Rept BSEP DR-8, Small Steam Line Break, in Response to 700825 Request for Reevaluation of Max Drywell Liner Temp That Could Result from Primary Sys Blowdown from Intermediate Operating Pressure)
- BECO-89-085, Forwards Plant Discharge Monitoring Rept for Apr-June 1989 + (Forwards Plant Discharge Monitoring Rept for Apr-June 1989)
- ML20140E536 + (Forwards Plant EA Worksheet)
- ML20073Q534 + (Forwards Plant EOF EPIP Manual.Manual Should Be Stored Next to Implementing Procedure Manual (Operation Manual F3) for Easy Accessibility in Case of Emergency.W/O Encl)
- ML20080L986 + (Forwards Plant Effluent & Waste Disposal semi-annual Rept for Jul-Dec 1994 & off-site Radiation Dose Assessment for 940101-1231)
- ML19339A668 + (Forwards Plant Electrical Drawings,Per .Drawings Withheld (Ref 10CFR2.790))
- ML20052F570 + (Forwards Plant Emergency Brochure,Revised Per Commitments Made Before ASLB & in Response to Criticisms.Two Aperture Cards Available in PDR)
- ML20079B723 + (Forwards Plant Emergency Plan Exercise Scenario Conducted on 941206)
- ML20138E014 + (Forwards Plant Emergency Preparedness Exercise Insp Rept 50-289/97-02 on 970305-07.No Violations Noted)
- ML20138E016 + (Forwards Plant Emergency Preparedness Exercise Insp Rept 50-289/97-02 on 970305-07.No Violations Noted)
- ML20135E389 + (Forwards Plant Emergency Preparedness Lessons Learned Task Force Rept)
- ML20086G668 + (Forwards Plant Emergency Preparedness Scenario.W/O Encl)
- ML20064C115 + (Forwards Plant Engineering Plan Re Performance Improvement, Per 940107 Telephone Conversation)
- ML20138R930 + (Forwards Plant Equipment Qualification Package Status as of 851112,per 851106 Telcon.Withdraws 850927 Request for Extension to Schedule for Final Environ Qualification of Electrical Cables.Compliance w/10CFR50.49 Discussed)
- ML20154E854 + (Forwards Plant Evacuation Time Estimate & Traffic Mgt Plan. No State Comments Until Review W/Local Officials Completed. FEMA Comments Requested)
- JAFP-92-0436, Forwards Plant Evaluation of Results of NRC Observed Licensed Operator Requalificaton Exams Conducted During Wks of 920510 & 17.Concludes That Program Meets All Criteria Specified in NUREG-1021,ES-601 for Satisfactory Program + (Forwards Plant Evaluation of Results of NRC Observed Licensed Operator Requalificaton Exams Conducted During Wks of 920510 & 17.Concludes That Program Meets All Criteria Specified in NUREG-1021,ES-601 for Satisfactory Program)
- ML20097J397 + (Forwards Plant FFD Program semi-annual Performance Rept for Period 950701-1231)
- ML20024D470 + (Forwards Plant Fes,In Response to .W/O Encl)
- ML20067A874 + (Forwards Plant Fitness for Duty Program (NOP-021) Procedure, in Response to 910125 Request.W/O Encl)
- ML20196C820 + (Forwards Plant Heatup & Hot Shutdown Testing Schedule & Power Ascension Schedule for Review,Per 880120 Request. Periodic Updates Shall Be Provided If Changes to Schedules Occur)
- ML20215N976 + (Forwards Plant History Re Bypassed & Inoperable Status Indications (Bisi) Sys.Evaluation Performed Per 10CFR50.59, Concluded That Removal of Status Monitoring Sys Poses No Impact to Safety)
- ML20138C957 + (Forwards Plant Human Reliability Analysis Notebook for Apr 1993,per Request)
- RC-96-0217, Forwards Plant Human Reliability Analysis Notebook for Apr 1993,per Request + (Forwards Plant Human Reliability Analysis Notebook for Apr 1993,per Request)
- ML18011A946 + (Forwards Plant IPEEE Final Rept in Response to GL 88-20, Suppl 4)
- HNP-95-061, Forwards Plant IPEEE Final Rept in Response to GL 88-20, Suppl 4 + (Forwards Plant IPEEE Final Rept in Response to GL 88-20, Suppl 4)
- ML20080F668 + (Forwards Plant ISI Exam Summary Rept for 1994 Refueling Outage)
- 0CAN039501, Forwards Plant Industrial Security Plan,Rev 32. Plan Withheld (Ref 10CFR73.21) + (Forwards Plant Industrial Security Plan,Rev 32. Plan Withheld (Ref 10CFR73.21))
- ML16342C109 + (Forwards Plant Issues Matrix That Was Inadvertently Omitted from PPR for Plant Facility.Encl 1 to PPR Requested to Be Replaced)