AUG 2 5 1987 Docket No. 50-261 DISTRIBUTION Docket File ACRS (10)
NRC & Local PDR Mr. E. E. Utley PD21 r/f Senior Executive Vice President S. Varga Power Supply and Engineering & Construction G. Lainas Carolina Power & Light Company E. Adensam P. 0. Box 1551 K.Eccieston Raleigh, North Carolina 27602 P. Anderson OGC-B
Dear Mr. Utley:
E. Jordan J. Partlow
SUBJECT:
REQUEST FOR IMPLEMENTATION STATUS - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission has developed a long-term program which will improve its documen tation on the status of power reactor licensees' implementation of approved regulatory initiatives, from inception through verified implementation at each nuclear reactor power plant.
To assist me in developing this information for H. B. Robinson Steam Electric Plant, Unit No. 2, please review the enclosed plant data list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed/implemented or are expected to be completed.
For each requirement that has been completed, enter the date the item was completed under the "Impl. Comp." column. For requirements that have not been completed/implemented, provide the projected date. I do not expect or want a major effort made to obtain precise dates.
Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented.
For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions/implementations in 1987, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by September 30, 1987. Any information you can provide earlier would be appreciated.
670902024 9 870B25 PDR ADOCK 05000261 P
Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:
Thomas A. Baxter, Esquire Mr. Dayne H. Brown, Chief Shaw, Pittman, Potts and Trowbridge Radiation Protection Branch 2300 N Street, N.W.
Division of Facility Services Washington, DC 20037 Department of human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff -
NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina P.O. Box 629 Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550 Mr. Avery Upchurch, Chairman Triangle J Council of Governments 100 Park Drive Post Office Box 12276 Research Triangle Park, NC 27709
-2 In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be documented.
This request is covered by OMB Clearance Number 3150-0011, which expires December 31, 1989.
Sincerely, Kenne/h T./Eccleston, Sr. Project Manager Project Directorate II-1 Division of Reactor Projects I/II
Enclosure:
As Stated cc w/enclosures: See next page LA.
PR PEPD21:DRPR PM:PD21:DRPR D: Q :DRPR PAO~e BMozafari/dsf K. Eccleston EA am 8/ q/87 84f/
87 8, Y/87 8'
87
-2 In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be documented.
This request is covered by OMB Clearance Number 3150-0011, which expires December 31, 1989.
Sincerely, Kenne h T.iEccleston, Sr. Project Manager Project Directorate II-1 Division of Reactor Projects I/II
Enclosure:
As Stated cc w/enclosures: See next page LAf'
- PR PE 21 DRPR PM:PD21:DRPR D:-2 :DRPR PAheqf BMo afari/dsf K. Eccleston EA am 8/ q/87 86P87 8.g/87 8 LX 87
PAGE 1091 R-1216320-SPC 08/17/87 SAFETY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION 05000261 PWR WEST 2300 MWT CAROLINA POWER-&-tIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP.
COMP. COMPLET PRIORITY PRIORITY PRIORITY. PRIORITY 50 REACTOR VESSEL LEVEL INSTRUMENTATION IN N/A N/A N/A N/A 67.3.3 A-17 IMPROVED ACCIDENT MONITORING 04/86C 04/87C 06/8U H
H 67.4.1 G-01 RCP TRIP 02/83C 07/87 M
75 (B-76)
B-76 ITEM 1.1 -
POST TRIP REVIEW; PROGRAM DES 11/83C 05/85C N
75 (B-77)
B-77 ITEM 2.1 -
EQUIPMENT CLASSIFICATION & VE 11/83C 01/87C 04/88 N
75 (8-78)
B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TE 11/83C 03/86C 03/86C N
75 (8-79) 8-79 ITEM 3.1.3 -
POST MAINTENANCE TESTING -
11/83C 11/85C 11/85C N
75 (B-80)
B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILI 11/83C 03/86C 03/86C H
75 (B-81)
B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT 11/83C 01/87C 05/87 N
75 (B-82)
B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT 11/83C 08/85C 08/85C M
75 (B-85)
B-85 SALEM ATWS 1.2 DATA CAPABILITY 11/84C 06/85C 06/85C N
75 (8-86)
B-86 SALEM ATWS 2.2 S-R COMPONENTS 11/84C 09/87 10/87 N
75 (8-87)
B-87 SALEM ATWS 3.2.1 & 3.2.2 S-R COMPONENTS 11/84C 03/86C 03/86C N
75 (8-88)
B-88 SALEM ATWS 3.2.3 T.S. S-R COMPONENTS 11/84C 11/85C 11/85C N
75 (8-89)
B-89 SALEM ATWS 4.2.3 & 4.2.4 LIFE COMPONENTS 11/84C 04/86C 11/86 N
75 (B-90)
B-90 SALEM ATWS 4.3 W AND B&W T.S.
07/84C 09/87 11/86 N
75 (8-92) 8-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES 11/84C 03/86C 03/86C N
75 (B-93)
B-93 SALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIV 11/84C 12/87 00/00 N
A-2 D-10 ASYMMETRIC BLOWDOWN LOADS ON REACTOR PRI 03/79C 02/84C N/A M
N
'44'
PAGE 1092 R-1216320-SPC SAFETY ISSU ES MANAGEMENT SY STEM 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY A-24 B-60 QUALIFICATION OF CLASS IE SAFETY-RELATED 08/80C 03/85C 01/85C H
H A-26 B-04 REACTOR VESSEL PRESSURE TRANSIENT PROTEC 03/77C 09/79C 09/7C H
M A-36 (C-10)
C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL P 08/77C 05/84C 03/84C M
M A-36 (C-15)
C-15 CONTROL OF HEAVY LOADS -
PHASE II (FOLLO 05/83C 06/85C N/A 6-56 D-19 DIESEL GENERATOR RELIABILITY 09/84C 10/85C 10/85C H
N HF 1.1 SHIFT STAFFING 10/83 01/84C 10/85C H
I.A.1.1.1 SHIFT TECHNICAL.-ADVISOR -
ON DUTY C
11/80C 11/80C 01/81C I.A.1.1.3 F-01 SHIFT TECHNICAL ADVISOR -
TRAINED PER LL 10/80C 01/82C 08/81C 01/81C I.A.1.1.4 SHIFT TECHNICAL ADVISOR -
DESCRIBE LONG C
/81C
/81C N/A I.A.1.2 SHIFT SUPERVISOR RESPONSIBILITIES C 11/80C 11/80C 01/81C I.A.1.3.1 F-02 SHIFT MANNING -
LIMIT OVERTIME 04/81C 06/83C 06/86C 07/81C I.A.1.3.2 F-02 SHIFT MANNING - MIN SHIFT CREW 04/81C 06/83C 06/86C 09/82C I.A.1.4 LONG-TERM UPGRADE OF OPERATIONS PERSONNE 04/83 04/83 M
I.A.2.1.1 IMMEDIATE UPGRADING OF RO & SRO TRAINING C 11/80C 11/80C N/A I.A.2.1.2 IMMEDIATE UPGRADING OF RO & SRO TRAINING 11/80C 11/80C N/A I.A.2.1.3 IMMEDIATE UPGRADING OF RO & SRO TRAINING 11/80C 11/80C N/A I.A.2.1.4 F-03 IMMEDIATE UPGRADING OF RO & SRO TRAINING 04/81C 04/83C 04/83C 06/81C H
I.A.2.1.5 IMMEDIATE UPGRADING OF RO & SRO TRAINING 11/80C 11/80C N/A I.A.2.3 ADMINISTRATION OF TRAINING PROGRAMS 11/80C 11/80C N/A
PAGE 1093 R-1216320-SPC 08/17/87 SAFE TY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-t-tIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP.
COMPLET PRIORITY PRIORITY PRIORITY PRIORITY I.A.2.7 ACCREDITATION OF TRAINING INSTITUTIONS 03/85 12/86 03/85 03/87 M I.A.3.1.1 REVISE SCOPE & CRITERIA FOR LICENSING EX 11/80C 11/80C N/A I.A.3.1.2 REVISE SCOPE & CRITERIA FOR LICENSING EX 11/80C 11/80C N/A I.C.1.1 SHORT-TERM ACCIDENT & PROCEDURES REVIEW C
11/80C 11/80C 05/81C I.C.1.2.A F-04 SHORT-TERM ACCID. & PROCEDURES REV. -
IN 04/81C 06/83C 06/83C N/A H
I.C.1.2.B F-05 SHORT-TERM ACCID. & PROCEDURES REV. -
IN 10/80C 07/87 07/84C 05/81C H
I.C.1.3.A F-04 SHORT-TERM ACCID.. & PROCEDURES REV -
TRA 04/81C 06/83C 06/83C H
I.C.1.3.8 F-05 SHORT-TERM ACCID. & PROCEDURES REV. -
TR 10/80C 07/87 07/84C 05/81C H
I.C.2 SHIFT & RELIEF TURNOVER PROCEDURES C
11/80C 11/80C 01/81C I.C.3 SHIFT-SUPERVISOR RESPONSIBILITY C
11/80C 11/80C 03/81C I.C.4 CONTROL-ROOM ACCESS C
11/80C 11/80C 01/81C I.C.5 F-06 FEEDBACK OF OPERATING EXPERIENCE 11/81C 11/81C 11/81C 07/81C H
I.C.6 F-07 VERIFY CORRECT PERFORMANCE OF OPERATING 11/81C 11/81C 11/81C 05/81C I.D.2.1 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE - 04/83C 02/88 06/87 N/A I.D.2.2 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE - 04/83C 02/88 06/87 I.D.2.3 F-09 PLANT-SAFETY PARAMETER DISPLAY CONSOLE - 04/83C 02/88 06/87 II.B.1.1 REACTOR-COOLANT SYSTEM VENTS - DESIGN VE C
11/80C 11/80C N/A II.B.1.2 F-10 REACTOR-COOLANT SYSTEM VENTS -
INSTALL V 04/81C 09/83C 08/85C H
II.B.1.3 F-10 REACTOR-COOLANT SYSTEM VENTS -
PROCEDURE 04/81C 09/83C 08/85C H
PAGE 1094 R-1216320-SPC 08/17/87 SAFETY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP.
COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY II.B.2.1 PLANT SHIELDING -
REVIEW DESIGNS C 11/80C 11/80C N/A II.B.2.3 F-11 PLANT SHIELDING -
PLANT MODIFICATIONS (L 02/82C 04/83C 04/88C 02/82C H
II.B.2.4 PLANT SHIELDING - EQUIPMENT QUALIFICATIO C
N/A N/A 07/82C II.B.3.1 POSTACCIDENT SAMPLING -
INTERIM SYSTEM C
11/80C 11/80C 01/81C II.B.3.4 F-12 POSTACCIDENT SAMPLING -
PLANT MODIFICATI 04/81C 10/85C 08/85C C
H II.B.4.1 F-13 TRAINING FOR MITIGATING CORE DAMAGE -
DE 04/81C 04/83C 04/83C N/A H
II.B.4.2.A F-13 TRAINING FOR MITIGATING CORE DAMAGE -
IN 04/81C 04/83C 04/83C 07/81C H
II.B.4.2.B F-13 TRAINING FOR MITIGATING CORE DAMAGE -
CO 04/81C 04/83C 04/83C 10/81C H
II.D.1.1 RELIEF & SAFETY VALVE TEST REQUIREMENTS C
11/80C 11/80C N/A II.D.1.2.A RELIEF & SAFETY VALVE TEST REQUIREMENTS C
12/83C 12/83C N/A II.D.1.2.8 F-14 RELIEF & SAFETY VALVE TEST REQUIREMENTS 10/86C 04/87 10/85C N/A H
II.D.1.3 RELIEF & SAFETY VALVE TEST REQUIREMENTS C
12/83C 12/83C N/A II.D.3.1 VALVE POSITION INDICATION -
INSTALL DIRE C 11/80C 11/80C 08/81C II.E.1.1.1 F-15 AUXILIARY FEEDWATER SYSTEM EVALUATION -
04/81C 01/83C 01/83C H
II.E.1.1.2 F-15 AUXILIARY FEEDWATER SYSTEM EVALUATION -
04/81C 01/83C 01/83C 09/81C H
II.E.1.1.3 F-15 AUXILIARY FEEDWATER SYSTEM EVALUATIONS -
04/81C 01/83C 01/83C 02/82C H
II.E.1.2.1.A AUXILIARY FEEDWATER SYSTEM INITIATION &
C 11/80C 11/80C 01/81C II.E.1.2.1.B F-16 AUXILIARY FEEDWATER SYSTEM INITIATION & 04/81C 06/84C 11/86 02/82C H
II.E.1.2.2.A AUXILIARY FEEDWATER SYSTEM INITIATION &
C 11/80C 11/80C 08/81C
PAGE 1095 R-1216320-SPC 08/17/87 SAFETY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-t-tlGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY II.E.1.2.2.B AUXILIARY FEEDWATER SYSTEM INITIATION &
C N/A N/A N/A II.E.1.2.2.C F-17 AUXILIARY FEEDWATER SYSTEM INITIATION & 04/81C 06/84C 06/84C 08/81C H
II.E.3.1.1 EMERGENCY POWER FOR PRESSURIZER HEATERS C 11/80C 11/80C 01/81C II.E.4.1.1 DEDICATED HYDROGEN PENETRATIONS -
DESIGN C
11/80C 11/80C N/A II.E.4.1.3 F-18 DEDICATED HYDROGEN PENETRATION -
INSTALL 04/81C 12/81C 12/81C 09/81C H
II.E.4.2.1-4 CONTAIMENT ISOLATION DEPENDABILITY -
IMP C
11/80C 11/80C 08/81C II.E.4.2.5.A CONTAINMENT ISOtAT. DEPENDABILITY -
CNTM C
02/83C 02/83C N/A II.E.4.2.5.B CONTAINMENT ISOLATION DEPENDABILITY - CN C 02/83C 02/83C 08/81C II.E.4.2.6 F-19.CONTAINMENT ISOLATION DEPENDABILITY - CN 04/81C 02/83C 02/83C 06/81C H
II.E.4.2.7 F-19 CONTAINMENT ISOLATION DEPENDABILITY -
RA 04/81C 02/83C 02/83C 08/81C H
II.F.1.2.A F-20 ACCIDENT-MONITORING -
NOBLE GAS MONITOR 04/81C 05/82C 05/82C 02/83C H
II.F.1.2.B F-21 ACCIDENT-MONITORING -
IODINE/PARTICULATE 04/81C 05/82C 05/82C 02/83C H
II.F.1.2.C F-22 ACCIDENT-MONITORING - CONTAINMENT HIGH-R 04/81C 07/82C 07/82C 02/83C H
II.F.1.2.D F-23 ACCIDENT-MONITORING -
CONTAINMENT PRESSU 01/82C 08/85C 08/85C 02/82C H
II.F.1.2.E F-24 ACCIDENT-MONITORING -
CONTAINMENT WATER 01/82C 04/84C 08/85C 02/82C H
II.F.1.2.F F-25 ACCIDENT-MONITORING -
CONTAINMENT HYDROG 01/82C 08/85C 08/85C 02/82C H
II.F.2.1 INSTRUMENTATION FOR DETECT. OF INADEQUAT 11/80C 11/80C II.F.2.2 INSTRUMENTATION FOR DETECT. OF INADEQUAT C
N/A N/A 06/81C II.F.2.4 F-26 INSTRUMENTATION FOR DETECT. OF INADEQUAT 04/81C 01/88 10/87 H
PAGE 1096 R-1216320-SPC 08/17/87 SAFETY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY II.G.1.1 POWER SUPP. FOR PRESSURIZER RELIEFBLOCK C
11/80C 11/80C 03/81C 0
III.A.1.1 EMERGENCY PREPAREDNESS, SHORT TERM 11/80C 11/800 N/A III.A.1.2.1 UPGRADE EMERGENCY SUPPORT FACILITIES -
I C
11/80C 11/80C 01/81C III.A.2.1 F-67 UPGRADE PREPAREDNESS - UPGRADE EMERGENCY 04/81C 05/83C 05/83C H
III.A.2.2 F-68 UPGRADE PREPAREDNESS - METEROROLOGICAL D 04/81C 06/82C H
III.D.1.1.1 PRIMARY COOLANT OUTSIDE CONTAIMENT -
LEA C 11/80C 11/80C 01/81C III.D.3.3.1 INPLANT RAD. MONIT. -
PROVIDE MEANS TO D C
11/8OC 11/SOC 05/SiC III.D.3.3.2 F-69 INPLANT RADIATION MONIT. -
MODIFICATIONS 04/81C 02/82C 02/82C 02/82C III.D.3.4.1 F-70 CONTROL ROOM HABITABILITY -
REVIEW 04/81C 07/85C 08/85C N/A H
III.D.3.4.2 F-70 CONTROL ROOM HABITABILITY -
SCHEDULE MOD 04/81C 07/85C 08/85C H
II.K.1.3 IE BULLETINS -
79-06,79-06A, 79-06A REV C
C C
06/81C II.K.2.13 F-30 ORDERS ON B&W PLANTS -
THERMAL MECHANICA 12/81C 06/84C 06/84C N/A H
II.K.2.17 F-33 ORDERS ON B&W PLANTS - VOIDING IN RCS (C 01/82C 09/83C 01/84 N/A H
II.K.2.19 BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLO C
C N/A II.K.3.1.A F-36 FINAL RECOMMENDATIONS,B&O TASK FORCE - A 04/81C 09/83C 09/83C N/A H
II.K.3.1.B FINAL RECOMMENDATIONS,B&O TASK FORCE - A C
C C 04/82C II.K.3.10 F-41 FINAL RECOMMENDATIONS,B&O TASK FORCE -
P 04/81C 12/81C 12/81C 10/81C II.K.3.12.A FINAL RECOM.,B&O TASK FORCE - ANTICIP. T
/81C
/81C II.K.3.12.8 F-42 FINAL RECOM..B&O TASK FORCE - ANTICIPATO 04/81C 12/81C 12/81C 01/82C
PAGE 1097 R-1216320-SPC 08/17/87 SAFETY ISSU ES MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-atIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY II.K.3.17 F-47 FINAL RECOMMENDATIONSB&0 TASK FORCE - E 04/81C 08/83C 08/83C N/A H
II.K.3.2 F-37 FINAL RECOMMENDATIONS,B&O TASK FORCE - R 04/81C 09/83C 09/83C N/A H
II.K.3.25.A FINAL RECOMMENDATIONS,B&O TASK FORCE -
P C
C N/A II.K.3.25.B F-53 FINAL RECOMMENDATIONSB&O TASK FORCE -
P 11/SOC 10/82C 10/82C 04/82C II.K.3.3 F-38 FINAL RECOMMENDATIONS,B&O TASK FORCE - R 04/81C 10/82C 09/83C N/A H
II.K.3.30.A FINAL RECOMMENDATIONS.B&0 TASK FORCE - S C 07/85C 06/86C N/A II.K.3.30.B F-57 FINAL RECOMMENDATIONSB&O TASK FORCE - S 04/SIC 07/85C 06/86C N/A H
II.K.3.31 F-58 FINAL RECOMMENDATIONS,B&O TASK FORCE - C 04/82C 03/87C 02/87 N/A H
II.K.3.5.A F-39 FINAL RECOMMENDATIONS,B&0 TASK FORCE - A 04/81C 02/83C 10/85C N/A H
II.K.3.5.B F-39 FINAL RECOMMENDATIONSB&O TASK FORCE - A 04/81C 02/83C 10/85C 03/82C H
II.K.3.9 F-40 FINAL RECOMMENDATIONSB&O TASK FORCE -
P 04/81C 12/81C 12/81C 02/82C M11215 ROBINSON 2 -
INSERVICE TESTING -
PUMPS A 04/76C 12/85C H
H M13024 ROBINSON 2 -
ENVIRONMENTAL TECHNICAL SPE 03/80C 09/87 L
L M43828 ROBINSON 2 -
ALTERNATE SHUTDOWN SYSTEM 05/81C 12/83C H
H M48877 H. B. ROBINSON -
STEAM GENERATOR REPAIR 07/82C 02/84C H
H M49223 H. B. ROBINSON 2 -
REVIEW AFW PROTECTION 03/82C 08/85C L
L M49294 H.B. ROBINSON 2 -
LOSS OF FEEDWATER TRAN 12/82C 06/84C M
M M49438 H. B. ROBINSON #2 GENERIC LETTERS 82-17 01/83C 02/84C H
H M51339 H. B. ROBINSON 2 -
EXEMPTION TO APPENDIX 03/81C 10/84C H
H
PAGE 1098 R-1216320-SPC SAFETY I SSUE ES MANAGEME NT SY STEM 03/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP.
COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M51796 HB ROBINSON 2 -
REVISE TEC SPECS TO BE C 06/83C 04/84C L
L M51962 H.B. ROBINSON 2 -
CHANGE TECH SPECS -
DE 07/83C 04/85C t
L L
M51966 H.B. ROBINSON 2 -
REVISE ISI TEC SPECS T 07/83C 09/84C M51967 H.B. ROBINSON 2 -
REVISE ISI TEC SPEC TO 07/83C 05/84C L
L M52335 H.B. ROBINSON 2 - STEAM GENERATOR TUBE I 09/83C 06/84C M52440 H.B. ROBINSON 2 - SECOND 10 YR ISI PROGR 10/83C 01/85C H
H M52553 H.B. ROBINSON 2%- MISCL TECH SPECS 10/83C 03/84C M52615 H.B. ROBINSON-2 PTS FLUX REDUCTION PROGR 09/83C 11/84C M52616 H.B. ROBINSON 2 SAMPLING OF REACTOR VESS 10/83C 06/84C M52617 H.B. ROBINSON 2 HEATUP & COOLDOWN CURVE 10/83C 09/84C M
M M52632 H.B. ROBINSON 2 -
REVISE TEC SPEC SURVEI 10/83C 03/84C M52695 H. B. ROBINSON 2 - CYCLE 10 OPERATIONS 07/84C 11/84C M52696 H.B. ROBINSON 2 -
T/S ORGANIZATION CHANG 10/83C 10/84C L
L M52697 H. B. ROBINSON 2 - VENT T/S CHANGE CONTA 11/83C 07/86C M53229 H.B. ROBINSON 2 -
FLUX REDUCTION REPORT 09/83C 09/84C M53230 H.B. ROBINSON 2 -
HEARING PREPARATION RE 11/83C 02/84C M53326 H. B. ROBINSON DEDICATED SHUTDOWN SY 12/83C 06/85C M53336 H. B. ROBINSON 2 - APPENDIX J TEST PROGR 06/83C 08/87 M53481 H.B. ROBINSON 2 USE OF 10 SPARE SPACES F 01/84C 05/84C M
M
PAGE 1099 R-1216320-SPC SAFETY ISSU ES MANAGEMENT SYSTEM 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-a-tlGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP.
COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M53482 H.B. ROBINSON 2 AFW INITIATION T/S REVIS 01/84C 10/84C L
L M54192 ROBINSON -
SCALING FACTORS -
RADWASTE 02/84C 03/85C M54202 H. B. ROBINSON -
APPENDIX "R" 02/84C 08/84C M54411 ROBINSON 2-RCS VENTS TECHNICAL SPECIFIC 03/84C 01/85C M54484 H. B. ROBINSON -
2 WASTE DISPOSAL PROCED 03/84C 11/84C M54896 H.B. ROBINSON 2 - ABT FOR AFW INITIATION 05/84C 12/87 M54994 H.B. ROBINSON -
Z EXEMPTION FROM 10CFR50 04/84C 02/84C M55155 H.B. ROBINSON 2 - MECH DES REPORT XN-NF-10/84C 11/84C M55156 H.B. ROBINSON 2 - MECH. DES. REPORT XN-N 10/83C 07/87 M55303 H. B. ROBINSON 2 -
BACKFEEDING SR BUSSES 05/84C 01/85C M55323 H.B. ROBINSON PTS MATERIAL PROPERTIE 06/84C 03/85C M55440 H.B. ROBINSON EXEMPTION FROM 10CFR50 06/84C 07/87 M55441 H.B. ROBINSON EXEMPTION TO 10CFR APP 06/84C 09/86C M55630 H. B. ROBINSION 2 -
ANALYSIS XN-NF-82-20 07/84C 11/84C M55654 H. B. ROBINSON UNIT 2 - CONTROL ROD DRIV 08/84C 11/84C M55760 H.B. ROBINSON INTEGRATED LEAKAGE RAT 07/84C 10/86C M55769 H. B. ROBINSON UNIT 2 -
STATION BATTERIE 09/84C 05/85C M56019 H.B. ROBONSON UNIT 2 -
STEAM GENERATOR P 09/84C 05/85C M56037 ROBINSON 2 -
QA PROGRAM CLARIFICATION 10/84C 03/85C
PAGE 1100 R-1216320-SPC SAFE TY ISSU ES MANAGEME NT SY STEM 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M56621 H.B. ROBINSON 2 -
TECH SPECS ORGANIZATIO 12/84C 05/85C M56638 H.B. ROBINSON EXEMPTION FROM 10 CFR 07/84C 09/86C M56925 H. B. ROBINSON 2 - CONTAINMENT COOLING & 02/85C 03/85C M56992 H. B. ROBINSON 2 - DISPOSAL OF SLIGHTLY 03/85C 03/85C M56997 H. B. ROBINSON 2 - CYCLE 10 SENSITIVITY 01/85C 07/86C M56998 H. B. ROBINSON 2 -
CYCLE 10 SCOTRAX INFO 11/84C 07/86C M56999 H.B. ROBINSON 2.- MSLB & SCRAM SHUTDOWN 01/85C 07/86C M57053 HB ROBINSON 2 -
QA PROGRAMS FOR RADIOACT 10/84C 02/85C M57355 H. B. ROBINSON 2 - CYCLE 10 - FUEL MISLO 04/85C 01/86C M57356 H. B. ROBINSON 2 - CYCLE 10 RCS FLOW 08/85C 05/86C M57408 H. B. ROBINSON 2 - DEDICATED/ALTERNATE S 03/85C 01/87C M57738 H. B. ROBINSON 2 -
TECH. SPEC. REVISE SE 04/85C 08/85C M57938 H. B. ROBINSON - ENVIRONMENTAL APPRAISAL 02/85C 06/86C M59280 H. B. ROBINSON 2 - REVISED K(Z) CURVE FO 07/85C 12/85C M59925 H. B. ROBINSON 2 -
TECH. SPEC. FOR REVIS 09/85C 08/86C M59926 H. B. ROBINSON 2 -
TECH SPEC MISCELLANEO 09/85C 10/86C M59927 H. B. ROBINSON 2 -
TECH. SPEC. FOR SHIFT 08/85C 07/86C M59928 H. B. ROBINSON 2 - TECH. SPEC. CHANGES F 10/85C 07/86C M60106 H. B. ROBINSON 2 - ALTERNATE SHUTDOWN CA 06/85C 11/86C
PAGE 1101 R-1216320-SPC S A F E T Y I S S U E S M A N A G E M E N T S Y S T E M 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-&--tlGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M60107 H. B. ROBINSON 2 -
SALP REPORT 10/85C 11/85C M60301 H. B. ROBINSON 2 -
TECH. SPEC. DELETE RE 11/85C 03/86C M60653 ROBINSON -
PHYSICAL 01/86C 03/87 M60919 H. B. ROBINSON 2 -
PROCESS CONTROL PROGR 01/86C 05/86C M61151 H. B. ROBINSON 2 - RADIOLOGICAL EFFLUENT 11/85C 09/86C M61200 H. B. ROBINSON 2 - REPORTING REQUIREMENT 01/86C 10/86C M61653 H. B. ROBINSON 2.- ADDITIONAL IST RELIEF 05/86C 10/87 M61728 H. 8. ROBINSON 2 - STAFF QUALIFICATION A 04/86C 10/86C M61903 ROBINSON -
SEISMIC QUALIFICATION OF R.G. 06/86C M61935 H. B. ROBINSON 2 -
TECH. SPEC. REVISED K 07/86C 12/86C M62074 H. B. ROBINSON 2 - APPROVAL FOR USE OF C 04/86C 08/87 M62075 H. B. ROBINSON 2 -
RELIEF 814 ISI CODE R 04/86C 11/86C M62076 H. B. ROBINSON 2 -
RELIEF #12 ISI RESUBM 05/85C 11/86C M62163 H.B. ROBINSON 2 -
TECH. SPEC. DELETE ALL 08/86C 10/86C M62826 H. B. ROBINSON 2 -
TECH. SPEC. ERROR COR 08/86C 12/86C M62827 H. 8. ROBINSON 2 -
TECH. SPEC. SPECIFY D 09/86C 12/87C M62828 H. B. ROBINSON 2 -
TECH. SPEC. DUAL ROLE 09/86C 12/86C M63055 H.B. ROBINSON 2 -
TECH. SPEC. INCREASE F 10/86C 01/87C H
M63961 H. B. ROBINSON 2 -
IOCFR50 APR; SECT. II 01/86C 12/86C H
PAGE 1102 R-1216320-SPC SAFETY I SSUE S MANAGEMENT SYSTEM 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER & LIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP.
COMPLET PRIORITY PRIORITY PRIORITY PRIORITY M64199 H. B. ROBINSON 2-HEAT-UP & COOLDOWN CUR 12/86C 05/87 H
M64474 H.B. ROBINSON 2 -
TECH. SPEC. FOR REACTO 01/87C H
M64900 H.B. ROBINSON 2 -
TECH. SPEC. -
ORGANIZA 03/87C H
M64936 H.B. ROBINSON 2 -
TMI 0737 II.D.1 BACKFI 03/87C 04/87C H
M65006 H.B.
ROBINSON 2 -
ONE-TIME TECH. SPEC. C 03/87C H
M65137 HBR-2:
EXEMPTION REQUEST FROM IOCFR50 A 04/87C 05/87C H
MPA-A-01 A-01 10 CFR 50.55 A(G) -
ISI 08/77C 08/83C 03/93C H
H N
MPA-A-02 A-02 APPENDIX I - ALARA 07/78C 10/84C 03/86C H
L N
MPA-A-03 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLAN 04/78C 02/79C 02/79C N
MPA-A-04 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 08/75C 12/81C 03/82C M
M N
MPA-A-09 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEI 05/77C 05/80C N/A L
L N
MPA-A-10 A-10 CONTINGENCY PLANNING 03/79C 10/80C 10/80C H
H N
MPA-A-11 A-11 GUARD TRAINING PLANS 08/79C 08/81C 08/81C H
H N
MPA-A-12 A-12 VITAL AREA ANALYSIS 02/78C 04/82C N/A H
H N
MPA-A-15 A-15 QUALITY ASSURANCE REQUEST REGARDING DIES 01/80C 11/81C N/A L
L L
L MPA-A-18 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 ( 03/84C 03/85C 03/85C H
N MPA-A-20 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 06/84C 02/87 H
MPA-A-21 A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK 10/85C 02/86C N
MPA-B-01 B-01 DIESEL GENERATOR LOCKOUT 03/77C 01/81C N/A L
M L
PAGE 1103 R-1216320-SPC S
A E
108/17/87 SAFETY ISSU ES MANAGEMENT SY STEM 0/78 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-a-tXGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP.
COMP. COMPLET PRIORITY PRIORITY PRIORITY. PRIORITY MPA-B-02 B-02 FIRE PROTECTION 01/77C 02/78C 02/78C H
H N
MPA-B-03 B-03 PWR MODERATOR DILUTION 09/77C 02/79C N/
L M
L MPA-B-07 B-07 STEAM GENERATOR FEEDWATER FLOW INSTABILI 09/77C 07/80C 08/80C M
M M
MPA-B-12 B-12 STEAM GENERATOR TUBE INSPECTION 12/76C 09/78C 09/78C N
MPA-B-14 B-14 CEA GUIDE TUBE WEAR 12/77C 05/81C N/A L
L N
MPA-B-16 B-16 EMERGENCY PLANNING AND REVISIONS 08/78C 09/80C 09/80C H
H N
MPA-B-17 B-17 TECH SPEC SURVE*ILLANCE FOR HYDRAULIC SNU 08/78C 03/82C 03/82C L
L N
MPA-B-20 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIOR 12/78C 08/80C 01/82C L
L N
MPA-B-21 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS 0 12/78C 02/82C N/A L
L N
MPA-B-22 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR 08/78C 03/84C 03/84C M
M N
MPA-B-23 B-23 DEGRADED GRID VOLTAGE 08/76C 09/80C 09/80C M
M M
MPA-B-24 B-24 VENTING AND PURGING CONTAINMENTS WHILE A 12/78C 03/80C 03/80C H
M H
MPA-B-26 8-26 INADVERTANT SAFETY INJECTION DURING COOL 12/78C 09/79C 08/79C M
M N
MPA-B-32 B-32 BLOCKED SI SIGNAL DURING COOLDOWN 04/78C 06/80C 06/80C M
M N
MPA-8-39 B-39 PWR PRESSURE -
TEMPERATURE LIMIT TECH SP 08/78C 11/80C 11/80C H
H N
MPA-B-41 B-41 FIRE PROTECTION -
FINAL TECH SPECS (INCL 03/81C 11/83C 03/86C H
H H
MPA-B-42 B-42 TMI FOLLOW UP - ALL PLANTS 05/79C 01/81C 03/81C H
H N
MPA-B-43 B-43 PWR FEEDWATER LINE CRACKS 10/80C 05/82C 12/79C M
M N
MPA-B-44 B-44 LESSONS LEARNED IMPLEMENTATION 09/79C 04/80C 12/79C H
H N
PAGE 10 R-1216320-SPC 1104 SAFE TY ISSU ES MANAGEMENT SY STEM 08/17/87 PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 -MWT CAROLINA POWER & LIGHT SC 2
09/7C 04/07 APPLICABLE ISSUES IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER APPLICABLE---ISSUES-INIT.
COM P.
COMP.
COMPLET PRIORITY PRIORITY PRIORITY PRIORITY MPA-B-45 B-45 WASH 1400 EVENT V. "PRIMARY COOLANT SYST 02/80C 04/81C 04/81C H
H H
MPA-B-46 B-46 ANALYSIS OF TURBINE DISC CRACKS 12/79C 08/81C 09/81q M
M N
MPA-B-47 B-47 ECCS; CLAD SWELLING AND RUPTURE 11/79C 09/80C 11/796 M
M N
MPA-B-48 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTIO 03/80C 05/84C 01/85C M
M M
MPA-B-52 B-52 REVIEW OF SAFETY ASPECT OF INADVERTENT S 06/79C 11/80C 11/79C M
M N
MPA-B-54 B-54 LESSONS CATEGORY A TECH SPEC 12/80C 08/81C 08/81C H
N MPA-B-57 B-57 DHR CAPABILITY.'
06/80C 03/82C 03/82C M
M N
MPA-B-59 8-59 MASONRY WALL DESIGN 05/80C 09/83C N/A H
H M
MPA-B-61 B-61 LOSS OF NON CLASS IE I&C POWER 11/79C 07/82C N/A M
M M
MPA-B-62 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 03/80C 06/81C 10/85C L
H L
MPA-B-63 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKO 05/81C 12/81C 09/81C M
H MPA-B-66 B-66 NATURAL CIRCULATION COOLDOWN 05/81C 09/83C 11/81C M
H M
MPA-B-67 8-67 THERMAL SHOCK 08/81C 09/82C N/A H
H N
MPA-B-69 8-69 IEB 80-4 MAINSTEAM LINE BREAK WITH CONTI 10/81C 01/83C N/A M
M M
MPA-B-70 B-70 FATIGUE TRANSIENT LIMIT TS 07/81C 05/82C N/A L
L N
MPA-B-72 8-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82 03/83C 09/85C 09/85C N
MPA-B-73 8-73 PLANS FOR PREVENTING EXCEEDING PTS SCREE 02/83C 12/83C N/A H
H N
MPA-B-83 8-83 TECH SPECIFICATIONS COVERED BY GENERIC L 03/84C 08/85C 08/85C H
N MPA-C-01 C-01 PWR SECONDARY WATER CHEMISTRY MONITORING 08/76C 12/SOC 12/SOC M
M N
PAGE 1105 R-1216320-SPC 08/17/87 SAFETY ISSU E S MANAGEMENT SY STEM PLANT DATA NSSS THERMAL OL OL PLANT DOCKET TYPE SUPPLIER CAPACITY LICENSEE STATE REGION ISSUE EXPIRATION ROBINSON 2 05000261 PWR WEST 2300 MWT CAROLINA POWER-t-tIGHT SC 2
09/70C 04/07 IMPO.
IMPO.
IMPL.
VERIFY ISSUE MPA VER DOCKET VERIFY APPLICABLE ISSUES INIT.
COMP. COMP. COMPLET PRIORITY PRIORITY PRIORITY PRIORITY MPA-C-03 C-03 QUALIFICATIONS OF RADIATION PROTECTION M 03/77C 04/79C 04/79C N
MPA-C-06 C-06 PUMP SUPPORT-LAMELLAR TEARING 03/78C 01/70C M
M N
MPA-C-14 C-14 AUXILIARY FEEDWATER SEISMIC QUALIFICATIO 02/81C 02/85C N/A H
M H
MPA-C-16 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIO 06/85C 01/85C N/A N
MPA-D-11 D-11 FISSION GAS RELEASE 11/76C 02/80C N/A N
MPA-D-15 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL S 09/79C 01/84C 11/84C L
L N
MPA-D-17 D-17 DEFINITION OF OPERABLE 10/80C 01/70C 03/82C M
M N
MPA-F-08 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REV 04/83C 05/85C 05/87 MPA-F-63 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 04/81C 03/87 H
MPA-F-64 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 04/81C 10/87 H
MPA-F-65 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 04/81C 09/87 06/87 H
MPA-F-66 F-66 III.A.1.2 NUCLEAR DATA LINK 04/81C 07/82C 07/86C H
MPA-F-71 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FO 10/84C 04/88 10/87 NMSS-2 ACCESS AUTHORIZATION 02/87 12/87 04/88
/89 H
NMSS-3 MISC AMEND CONCERN PHYSICAL PROTECTION 0 07/86 10/86
/87
/87 H
NMSS-4 SEARCHES OF INDIVIDUALS AT POWER REACTOR 07/86 10/86
/87
/87 H
NMSS-5 REPORTING REQUIREMENTS FOR SAFEGUARDS EV
/86
/86
/87
/87 H
NMSS-7 REQUIREMENTS FOR CRIMINAL HISTORY CHECKS
/87
/87
/88
/88 H
NRR-3 SEVERE ACCIDENT POLICY IMPLEMENTATION ON 09/87
/89
/89 H