Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards PSAR". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • PLA-4131, Forwards PP&L Annual Rept 1993 & Allegheny Electric Cooperative,Inc Annual Rept 1993  + (Forwards PP&L Annual Rept 1993 & Allegheny Electric Cooperative,Inc Annual Rept 1993)
  • ML17164A635  + (Forwards PP&L Technical Rept NE-92-01, Technical Basis for PP&L Approach to ATWS Procedural Guidance)
  • ML19270H654  + (Forwards PPI-TR-7701, U-Form Radwaste Solidification Sys, Revision 1)
  • ML20197H575  + (Forwards PPNR-2197, Millstone Unit 2 Independent Corrective Action Verification Program, Final Rept,Vol 1)
  • ML20237A225  + (Forwards PR-98-85, NRC Amends Licensing,Insp & Annual Fees)
  • ML20237A183  + (Forwards PR-98-85, NRC Amends Licensing,Insp & Annual Fees)
  • B12522, Forwards PRA Evaluation for Installation of Backup Protection Devices.Requests That NRC Provide Written Statement of Concurrence Re Util Conclusion That Installation of Backup Protection Devices Not Necessary  + (Forwards PRA Evaluation for Installation of Backup Protection Devices.Requests That NRC Provide Written Statement of Concurrence Re Util Conclusion That Installation of Backup Protection Devices Not Necessary)
  • ML20024C286  + (Forwards PRA Evaluations for SEP Topics III-2, Wind & Tornado Loadings, & III-4.A, Tornado Missiles, Per 830601 Commitments.Cost/Benefit Analysis on Proposed Mod to Install Portable Pumps Performed)
  • ML20090M523  + (Forwards PRA Individual Plan Exam Summary Rept,In Response to Generic Ltr 88-20, Individual Plant Exam for Severe Accident Vulnerabilities. Rept Organized,Per NUREG-1335, Individual Plant Exam Submittal Guidance)
  • ML20099A287  + (Forwards PRA Input to ITAAC Section 19.8 Re Tier 1 Treatment of Design Features Identified as Important by PRA)
  • ML20101K533  + (Forwards PRA Input to Itaac,Item PRA-2 Re Common Cause Failure & Item 19.X Re Tier 1 Treatment of Design Features Identified as Important by PRA)
  • ML20154C557  + (Forwards PRA Insp Repts 50-373/88-16 & 50-374/88-15 on 880627-0722 & Notice of Violation.Addl Concern Re Unreliability of Air Compressors at Station Noted,Per 880831 Problems W/Unit 2 Drywell Pneumatic Sys Leading to Shutdown)
  • ML20113C499  + (Forwards PRA Methodology Committed to in Amend Applications 160 & 144.Amends Institute New Risk Based Barrier Control Program.Calculations Also Encl)
  • ML20129D373  + (Forwards PRA Rept Concerning June 1996 SW Tunnel Foreign Matl Intrusion Event & Final Rept on Behavior of Foam Sealant Iowa Institute for Hydraulic Research)
  • ML20129D379  + (Forwards PRA Rept Concerning June 1996 SW Tunnel Foreign Matl Intrusion Event & Final Rept on Behavior of Foam Sealant Iowa Institute for Hydraulic Research)
  • ML20127B005  + (Forwards PRA Review of BWR Water Level Measurement Sys Provided in BWR Owners Group Repts SLI-8218 & SLI-8221. PRA Results Not Generically Applicable to All BWR Plants)
  • ML20078B881  + (Forwards PRA Study Supporting Request for Rev to Tech Specs. PRA Study Performed to Quantify Effect on Containment Isolation Failure Probability If More than One Set of Purge Lines Open During Modes 1-4)
  • ML20153D602  + (Forwards PRA Summary Rept,Providing Addl Info to Support Conclusion That Plant Not Outlier Re Severe Accident Characteristics When Compared to Plants of Similar Type & Vintage)
  • ML20029C592  + (Forwards PRA for Changes to TS 3.7.4 Proposed in Naesc LAR 93-02 Re Svc Water Sys/Ultimate Heat Sink Operability Requirements)
  • ML20094G142  + (Forwards PRA of Offsite Releases Initiated by Toxic Chemical Release, Per NUREG-0737,Item III.D.3.4. Transportation of Offsite Chemicals in Vicinity of Facility Will Not Pose Undue Risk to Control Room Operator)
  • ML20072S883  + (Forwards PRA-2/3-94-012, PRA Evaluation of Population Dose Risk... & PRA-2/3-94-013, PRA Evaluation of Risk Impact of Proposed One-Time Exemption from Requirements of 10CFR50, in Support of 940817 Application for Amends)
  • ML20150C339  + (Forwards PRA-Based Operational Safety Insp Repts 50-324/88-11 & 50-325/88-11 on 880229-0304 & 0314-18.Lack of Clearly Stated Program to Ensure Availability of Keys to Secured Areas When Card Readers Disabled Identified)
  • ML20129G372  + (Forwards PRM-30-61,requesting That NRC Amend Regulations Governing Monitoring & Maint Programs for Decommissioning Process at Facilities of Special Nuclear Matls Licensees)
  • ML20127K706  + (Forwards PRM-34-4 Requesting NRC Amend Regulations Governing Radiographic Operations to Require Two Person Team Perform Industrial Radiographic Operations at Temporary Job Sites & Fr Notice of Issuance)
  • ML20035H018  + (Forwards PRM-50-58 Filed by Vepco,Requesting NRC Amend Production Regulations to Change Emergency Planning Exercises from Annually to Biennially)
  • ML19282D208  + (Forwards PRM-71-6,& 40 Public Comments Received,For Consideration in Conjuction with Rulemaking Proceedings. W/O Encl)
  • ML19319C315  + (Forwards PSAR & Notice Re Util Application for CP & Facility License Authorizing PWR Const & Operation)
  • ML20198G458  + (Forwards PSAR Amend 21,including Revs to Section 2.5 & App 2P Summarizing Info Submitted Re Soil Density Investigations of Recompacted Backfill & to Table 5.2-1 Listing Codes & Classifications Used for RCS Components)
  • ML19289F528  + (Forwards PSAR Amend 22 Re Qa,In Response to NRC .Affidavit Encl)
  • ML19289F529  + (Forwards PSAR Amend 22 Re Qa,In Response to NRC 790430 Ltr.Affidavit Encl)
  • ML19308C294  + (Forwards PSAR Excerpts Re Operator Actions for Various Accidents)
  • ML20054L980  + (Forwards PSAR Ref Qcs 760.140-1,ASME Publication PVP-63, Procedure to Evaluate Structural Adequacy of Piping Sys in Creep Range, in Response to NRC Question CS 760-140 Submitted 820630)
  • ML19253B957  + (Forwards PSAR Vols 1,2 & 3.Requests Survey by 670815 Re Proposed Site Seismological Characteristics.W/O Encl)
  • ML19220D050  + (Forwards PSAR Vols 1-4,containing All Previous Info Re Oyster Creek Station & New Info Re site-related Changes. Requests Review & Comments.W/O Encl)
  • ML19220A619  + (Forwards PSAR Volumes 1-4 Re New Site Review & Comments. W/O Encl)
  • ML19319A806  + (Forwards PSAR for Facility.W/O Encl)
  • ML19248C509  + (Forwards PSAR for Subj Constr Permit Appl,Including Preliminary Design Approval 2(CESSAR) & Preliminary Design Approval 6(SWESSAR-P1))
  • ML20062N339  + (Forwards PSC First Annual Update of Fort St Vrain Decommissioning Fire Protection Plan, Sections 1-4)
  • ML19318A919  + (Forwards PSC of MD Order 64338,closing Case 6603,PEPCO Application for Certificate of Public Convenience & Necessity for Const of Two Nuclear Power Plants,Due to Util 800602 Withdrawal of Application)
  • ML19246A560  + (Forwards PSC of Nh 790621 Preliminary Prospectus Re Two Million Shares of Common Stock.Submittal Supplements Info Forwarded 790622)
  • ML20077J384  + (Forwards PSC of Nh,Seabrook Station,Environ Qualification of Electrical Equipment Important to Safety, in Response to SER Outstanding Issue 6 & 830505 Request for Addl Info)
  • ML20031E135  + (Forwards PSC of Nm 770208 Findings of Fact & 770328 Order,To Be Appended to Util 811002 Response to State of Nm Motion for Leave to Participate as Interested State)
  • ML20052C694  + (Forwards PSC of Ny 820410 Opinion 82-7 Allowing Plant Const to Continue)
  • ML20137L056  + (Forwards PSCC-1-EIP-24, Test Procedure for Qualification of Fort St Vrain Electrical Isolation Sys... & Rev 0 to EIP-24, Test Procedure for Performance & Isolation Testing..., Per NRC Request for SPDS Review)
  • ML20137L062  + (Forwards PSCC-1-EIP-24, Test Procedure for Qualification of Fort St Vrain Electrical Isolation Sys... & Rev 0 to EIP-24, Test Procedure for Performance & Isolation Testing..., Per NRC Request for SPDS Review)
  • ML20209H962  + (Forwards PSE-SE-Z-017, Elimination of OD-11 Process Computer Test from Power Ascension Testing-Test 11, & PSE-SE-Z-024, Deletion of Transversing In-Core Probe Uncertainty,Test 16)
  • ML18107A184  + (Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl)
  • ML18107A186  + (Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl)
  • ML20064J028  + (Forwards PSEGs Notice of W/Drawal of Appl in Proceeding Re Subj Facil.Also Encl Is Amend 33 to PSAR)
  • ML20154E674  + (Forwards PUR-1 Tech Specs Incorporating Changes Discussed in Recent Telcon & Grammatical & Typo Corrections)