ML20113C499
| ML20113C499 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/27/1996 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20113C504 | List: |
| References | |
| NUDOCS 9607010279 | |
| Download: ML20113C499 (2) | |
Text
,
S*
Southem Califomia Edison Company P. O. BOX 128 BAN CLEMENTE, CALIFORNIA 92674-0128 June 27, 1996
- n #^M"."n ne"o^u"*Lv rr..n.
Ji,"O"n'o, U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
l
Subject:
Docket Nos. 50-361 and 50-362 Probabilistic Risk Assessment Methodology Ame-t Application Nos. 160 and 144 Bar.
Control Program San Onofre Nuclear Generating Station Units 2 and 3
Reference:
Letter from D. E. Nunn to the Document Control Desk, dated May 9, 1996,
Subject:
Amendment Application Nos. 160 and 144, Barrier Control Program, San Onofre Nuclear Generating Station Units 2 and 3 Enclosed is the probabilistic risk assessment (PRA) methodology committed to in Amendment Application Nos. 160 and 144 (Reference). These amendment applications institute a new risk based Barrier Control Program.
This PRA methodology will be used to support the allowed outage times in the Licensee Controlled Specification implementing the Barrier Control Program.
1 If you would like additional information on this Technical Specification change request, please let me know.
Sincerely, ats9) 010039 1
Enclosure cc:
L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, Region IV K. E. Perkins,-dr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3
\\
H. Kocol, California State Department of Health Services
\\
\\
9607010279 960627 PDR ADOCK 05000361 p
__..m_
I EXCLOSURE