Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19294B702 + (Forwards Fire Protection Review of Items 3.2.2 & 3.2.3 Re Adequacy of Detector Installation & Fire Pump Flow Tests, Respectively)
- ML19262C226 + (Forwards Fire Protection Review of Safety Evaluation Items 3.1.12 & 3.2.5.Util Verification of Fire Detector Location Adequate.Util Personnel Qualified to Locate Detectors)
- ML17339A969 + (Forwards Fire Protection Review of Util Design Details,Nrc Positions Re Fire Protection Program & Status Table Re Resolution of Incomplete Items.Response within 20 Days Requested)
- ML19260D906 + (Forwards Fire Protection Review,As Input to Design Review, & Supplemental Items)
- ML17341B249 + (Forwards Fire Protection Review,Vols I & II)
- ML19294B188 + (Forwards Fire Protection Review.Item 3.1.1 Re Fire Detection Sys Is Satisfactory & Should Be Accepted by Nrc.Item 3.1.5 Re Water Suppression Sys Is Generally Acceptable,But Some Points Require NRC Review)
- ML19297C974 + (Forwards Fire Protection Review.Proposed Mods Re Items 3.1.19,3.2.4 & 3.2.8 Acceptable)
- ML18044A621 + (Forwards Fire Protection SER Suppl.Addl Info Submitted by Util on 780915 & 29 Resolving Incomplete Items Identified in 780901 Ser.Info Providing Design Criteria for Mods 3.1.1, 3.1.5,3.1.10 & 3.1.15 Overdue.Fire Protection Status Encl)
- ML20054K873 + (Forwards Fire Protection Safe Shutdown Analysis Compliance w/10CFR50,App R Section Iii.G & Substantive Basis for Exemption Requests)
- GO2-83-243, Forwards Fire Protection Safe Shutdown Analysis Per 821207 Telcon Discussion.Analysis Utilizes Automatic Depressurization Sys & RHR Loop B Not RCIC & Loop B to Achieve Shutdown.Specific FSAR Revs Being Prepared + (Forwards Fire Protection Safe Shutdown Analysis Per 821207 Telcon Discussion.Analysis Utilizes Automatic Depressurization Sys & RHR Loop B Not RCIC & Loop B to Achieve Shutdown.Specific FSAR Revs Being Prepared)
- ML19209D106 + (Forwards Fire Protection Safe Shutdown Analysis,Suppl I. Addresses Availability of Suppression Pool Cooling Mode of RHR Sys in Event of Fire)
- ML19274E454 + (Forwards Fire Protection Safe Shutdown Analysis)
- ML19290E591 + (Forwards Fire Protection Safe Shutdown Analysis,Suppl 2, Cold Shutdown)
- ML20054K894 + (Forwards Fire Protection Safe Shutdown Capability Assessment & Proposed Mods,Vols I,Ii & III)
- ML20054K494 + (Forwards Fire Protection Safe Shutdown Rept,Per 810320 Commitment,Amended 820218.Rept Responds to Safe Shutdown Capability Criteria Presented in 10CFR50,App R,Section III.G.2 & Generic Ltr 81-12)
- ML20136E072 + (Forwards Fire Protection Safety Evaluation Supporting Program W/Improvements to Be Made Prior to Fuel Loading)
- ML19249D349 + (Forwards Fire Protection Safety Evaluation in Response to Requesting Extension of Schedule for Completing Fire Protection Mods to Svc Water Pump & Valve Room at Reactor Site)
- ML19296D598 + (Forwards Fire Protection Safety Evaluation Suppl.List Reflecting Current Status of Safety Evaluation Items Encl)
- ML19351F841 + (Forwards Fire Protection Safety Evaluation Suppl,For Proposed Mods Re Revised 10CFR50.48 & New App R.Item 3.1.29 Acceptable.Item 3.1.15 Not Acceptable & Remains Open Item)
- IR 05000387/1992033 + (Forwards Fire Protection Safety Insp Repts 50-387/92-33 & 50-388/92-23 on 920824-1009.Violations Noted Re Inadequate Implementation of Fire Protection Program QA Requirement & Failure to Perform Insps of Kaewoll Fire Barrier Cable)
- ML19208B754 + (Forwards Fire Protection Schedule of Implementation Dates for Proposed Mods Per 790817 Request)
- ML19269D428 + (Forwards Fire Protection Status Rept Covering Portions of Review for Which Power Sys Branch Has Review Responsibility)
- ML19322B703 + (Forwards Fire Protection Sys Rept Containing Fire Hazards Analysis Results in Response to NRC 770511 & 0928 Ltrs. Submits Schedule for Implementation of Mods.W/O Encl)
- ML20044G341 + (Forwards Fire Protection Team Insp Rept 50-458/93-09 on 930329-0422.Violation Re Failure to Complete Associated Circuits Analysis Under Consideration for Escalated Enforcement Action)
- ML17278A706 + (Forwards Fire Protection Team Insp Rept 50-397/86-05 on 860303-24.Noncompliance Noted.Enforcement Actions Will Be Subj of Separate Correspondence)
- W3P82-3752, Forwards Fire Protection Training Program & Fire Protection Program + (Forwards Fire Protection Training Program & Fire Protection Program)
- ML20065A861 + (Forwards Fire Protection of Cable Spreading Room, Evaluating Quantity of Transient Combustibles Necessary to Cause Ignition of Most Limiting Cable.Info Suppls 810306 Exemption Request)
- JPN-93-036, Forwards Fire Protection post-startup Items Status Rept, Providing Revised Schedule & Status for Plant Fire Protection post-startup Items + (Forwards Fire Protection post-startup Items Status Rept, Providing Revised Schedule & Status for Plant Fire Protection post-startup Items)
- ML20039A155 + (Forwards Fire Qualification Test of Protective Envelope Sys)
- ML19338G618 + (Forwards Fire Qualification Test on Retrofit Penetration Seals, in Response to NRC 800906 Ltr Requesting Addl Info Required by Fire Protection Safety Evaluation)
- ML19338G617 + (Forwards Fire Qualification Test on Retrofit Penetration Seals, in Response to NRC Requesting Addl Info Required by Fire Protection Safety Evaluation)
- ML19331E161 + (Forwards Fire Stop Penetration Test on Fire Protection Sys, Final Rept Re Slab 2)
- ML19331E162 + (Forwards Fire Stop Penetration Test on Fire Protection Sys, Final Rept Re Slab 2)
- ML19319E255 + (Forwards Fire Stop Tests Rept.W/O Encl)
- ML20148A392 + (Forwards Fire Svc Water Piping Drawing for TMI-1.Drawing Available in Central Files Only)
- ML19249D574 + (Forwards Firearms Qualification Records of Three United Nuclear Corp Security Guards, Inadvertently Omitted from Investigation Rept 70-082/79-22)
- ML20092P605 + (Forwards First & Second Interim Repts of Bechtel Independent Design Review Re May & June 1983 Integrated Design Insp. Related Correspondence)
- ML20198B927 + (Forwards First 10-yr ISI Program Relief Requests NR-26, Limited Volumetric Exam of RCS Weld Due to Whip Restraint Obstruction & NR-27 & NR-28,volumetric Exam of RPV Circumferential Shell Weld)
- ML20058G571 + (Forwards First 10-yr Interval ISI Program Relief Request B-14 to Include Request for Relief from Hydrostatic Testing Requirements for Similar Repair Work Performed on Unit 3 SG 3ME089 FW Piping,In Response to NRC RAI Re)
- ML20023C060 + (Forwards First 11 Radiological Assessment Repts for Detected Areas of Residual Radioactive Matls in Edgemont,Sd.Addl Repts Will Be Submitted as Available.W/O Encls)
- ML18152A810 + (Forwards First 1988 Semiannual Rev to Emergency Response Plan.Changes Do Not Decrease Effectiveness of Plan & Plan Continues to Meet Stds of 10CFR50.47(b))
- B14511, Forwards First 4-yr Simulator Certification Rept,Containing Performance Results to Support Submittal,Per 10CFR55.45(b) Which Requires Licensees to Rept Uncorrected Performance Test Failures + (Forwards First 4-yr Simulator Certification Rept,Containing Performance Results to Support Submittal,Per 10CFR55.45(b) Which Requires Licensees to Rept Uncorrected Performance Test Failures)
- ML20213F801 + (Forwards First Amended Complaint for Damages Re Transfer of R Parks Offsite Due to Comments Concerning Polar Crane Load Test Procedure.Related Correspondence)
- ML20012D478 + (Forwards First Annual ECCS Evaluation Model Revs Rept,Per 881017 Rev to 10CFR50.46.Rept Identifies Several Mods to Large & Small Break LOCA Evaluation Models Used at Facility & Provides Estimated Effects of Changes on ECCS Analyses)
- ML20199A330 + (Forwards First Annual Rept to Congress on Gaseous Diffusion Plants Which Discusses Status of Health,Safety & Environmental Conditions at Plants Located Near Paducah,Ky & Portsmouth,Oh for Period 970303-0930 for Info.W/O Encls)
- ML20205E433 + (Forwards First Biennial Rept of Financial Assurance for Decommissioning for Cns,Per 10CFR50.75(f)(1))
- ML20002A681 + (Forwards First Biweekly Rept as Requested in IE Insp Repts 50-373/80-40 & 50-374/80-26)
- ML20214W619 + (Forwards First Biweekly TMI-1 Status Rept for 861114-28)
- ML20091B382 + (Forwards First Biweekly Update to Schedule for Fuel Loading. Loading Continues to Be Scheduled for Late Sept 1984.Related Correspondence)
- ML20134E730 + (Forwards First Critique of Comanche Peak Response Team (Cprt) Plan.Cprt Plan Considered Inadequate.Design or issue-specific Action Plans Not Addressed.Related Correspondence)
- ML20155F897 + (Forwards First Cut of Certified Index of Record to Be Submitted to Court of Appeals on 871110.Listed Documents Requested)