Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 323-5341 k
n
'e r $! dent AlabamaPower
~
o ce
~
the southern erectnc sntem September 17, 1979 Docket No. 50-348 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn:
Mr. Darrell G. Eisenhut
Dear Mr. Eisenhut:
RE: Fire Protection Schedule In response to your letter of August 17, 1979 to Mr. Alan R. Barton on this subject, Alabama Power Company submits the attached information.
If you have questions please advise.
Yours very truly, be b F. L. Clayton Jr.
FLCJr/TNE:bhj Attachment cc:
Mr. A. R. Barton Mr. J. T. Young Mr. H. O. Thrash Mr. W. G. Hairston Mr. Ozen Batum Mr. R. L. George Mr. T. N. Epps Mr. J. N. McLeod
?
7909210 3 Y/
~
ff?S272
,\\'.
(STATUS AS OF 9-13-79)
TABLE 4.2-2 IMPLEMEh"I'ATION DATES FOR PROPOSED MODIFICATIONS Item Date Unit _1, Unit 2 1.
Sprinkler (All systems) 12/1/79 Before fuel load Roon 234, Area 16 Complete N/A 2.
Yard Hydrants 11/1/79 N/A 3.
Portable Extinguishers Complete Before fuel load 4
Rose Stations 10/1/79 Before fuel load 5.
Sooke Detectors 9/1/80 9/1/80 6.
UL Rated Doors Complete Before fuel load 7.
Penetration Seals 9/1/S0 Before fral load 8.
Portahle Stoke Recoval Complete N/A 9.
Ters. Cabinet Water Complete Before fuel load Protection 10.
Damper Rework End of 2nd Before fuel load refueling outage 11.
Eight Hour Battery Packs Complete Before fuel load 12.
Hose Stations in CHIT Complete Before fuel load 13.
RCP Oil Collection End of 2nd Before fuel load refueling outage 14.
Fire Pu=p Barriers Complete N/A
- 15. DG Pot Transfor=er Complete Complete Circuit Six (6) months af ter 16.
Barriers 9/1/80 fuel load (Note 3) 17.
Inside Water Supply Cocplete Before fuel load 18.
ESP Switch End of 2nd Relocation refueling outage Before fuel load 9PS273
~
Iten Date Unit 1 Unit 2 19.
HSP Instru=ent Mods.
End of 2nd Before fuel load refueling outage 20.
Barriers in S. W.
Complete Co=plete Structure 21.
Fireproof Control Room Complete N/A Kit
- 22. Modify New Fuel End of 2nd N/A Storage Racks refueling outage 23.
Reroute B Train Aux.
Complete N/A Feed Pump Room Cooler (added subsequent to A=end=ent 4)
Note 1 All administrative coc=it=ents will be complete 90 days after 1st refueling outage.
Note 2 The 2nd refueling will be af ter 9/1/80.
Note 3 If installed prior to fuel load, the kaowool vill be damaged by g --
additional cable running.
3Y3274 l
..