e Mf Northem States Power Company 414 Nicollet Mall Minneapoks. Minnesota 55401 Telephone (612) 330 5500 June 30, 1982 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANr Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Fire Protection Safe Shutdown Analysis and Compliance with Section III.C of 10 CFR Part 50, Appendix R, Including Requests for Reli_e_f_
f Attached you will find 40 copies of a report prepared for Northern States Power Company by Engineering, Planning and Management (EPM) entitled " Fire Protection Safe Shutdown Analysis Compliance with 10 CFR 50, Appendix R,Section III.G and Substantive Basis for Exemption Requests." This report supersedes our previous submittals on this 1: sue.
The purpose of this letter is to submit for NRC evaluation a revised Fire Protection Safe Shutdown Analysis for our Prairie Island Nuclear Generating Plant. Included in this report are:
- 1. Description of Necessary Functions and Equipment Required for Placing the Reactors in a Safe Shutdown Condition
- 2. Analysis Comparing the Existing. Safe Shutdown Equipment to the Requirements of Appendix R,Section III.G.2
- 3. Proposed Modifications Necessary for Complying with the Requirements of Appendix R,Section III.G.2
- 4. Requests for Exemption from Certain Requirements of Appendix R,Section III.C.2, where substantial, addit.ional fire pro-tection is not gained or where strict compliance does not necessarily result in improved protection of public health and safety An estimated 7,000 man-hours and $350,000 has been expended in compiling information for this submittal to date.
In view of the long history and the magnitude of effort involved, verification of the analysis process is still continuing to ensure the accuracy of the information set forth in this document. Any corrections or new information which changes the validity of the conclusions drawn by this analysis will be reported in a timely manner.
DU 8207060240 820630 0
PDR ADOCK 05000282
[
g PDR p
b
/
o NORTHERN GTATEL POWER COMPANY Director of NRR June 30, 1982 Page 2 Modifications requiring a plant outage are c'urrently scheduled to be completed within the schedule extension granted by your May 4, 1982 letter (first refueling outage beginning 180 days or more af ter June 1, 1982). However due to our change in approach to protection of cable trays and conduit at the Prairie Island Nuclear Generating Plant, the turn around time for assessing and conducting these modifications will go beyond the extension date granted for these non-outage items. Accord-ingly, we are requesting an extension of the previously granted schedular exemption as follows:
- 1. That the implementation date in paragraph (c)(2) for installation of modifications required by Appendix R,Section III.G.2, that do not require prior NRC approval or plant shutdown, be extended from nine months af ter June 1,1982, to January 1,1984.
Please contact us if you have any questions related t,o this submittal or if we can furnish additional information related to this issue.
M David Musolf sh Acting Head-Nuclear Support Services DMM/KNC/bd Secretary of the Commission (original & 2 copies) cc:
Regional Director, Region III Resident Inspector NRR Project Manager, NRC G Charnoff Attachments
. r %,
e e
UNITED. STATES NUCLEAR REGULATOR Y COMMISSIOM NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATI NG PLANI Docket No. 50-282 50-306
{
LETTER DATED JUNE REQUEST FOR RELIEF FROM REQU 30, 1982
\\
\\
IX R, SECTION III.G.2 June 30, 1982 Northern States Power Compa
(
\\
hereby submit ny, a Minnesota 10 CFR 50, Section 50.48(c)(2) a request for relief from the rcorporation, by this letter dat d s
This submittal contains no and Appendix R,Section III G 2 e
equirments of restricted or other defense information.
NORTHZRN STATES POWER COMPANY By
/s/ L M Musolf D M Musolf Acting Head-Nuclear Support S ervices On this 30th and being first duly swornfor said County, personally day of June 1982 acknowledged that he isappeared D M Musolf, Acting He before document on behalf of North me thereof.and that to the b ern States Power Companyauthorizeda -Nuclear Support Services made in it are true to and that it is not interposed fest of his knowledge, inform ti a
contents or delay.on and belief, the statements
/s/ Betty J. Dean Betty J. Dean Notary Public-Minnesota Ramsey County My Commission Expires Dec 16, 1987
. f %,
e e
UNITED, STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 50-306 LETTER DATED JUNE 30, 1982 REQUEST FOR RELIEF FROM REQUIREMENTS OF 10 CFR PART 50, SECTION 50.48(c)(2) AND APPENDIX R, SECTION III.G.2 Northern States Power Company, a Minnesota corporation, by this letter dated June 30, 1982 hereby submits a request for relief from the requirments of 10 CFR 50, Section 50.48(c)(2) and Appendix R,Section III.G.2.
This submittal contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY By
/s/ D M Musolf D M Musolf Acting Head-Nuclear Support Services On this 30th day of June 1982 before me a notary public in and for said County, personally appeared D M Musolf, Acting Head-Nuclear Support Services, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof.and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.