ML17278A706

From kanterella
Jump to navigation Jump to search
Forwards Fire Protection Team Insp Rept 50-397/86-05 on 860303-24.Noncompliance Noted.Enforcement Actions Will Be Subj of Separate Correspondence
ML17278A706
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/04/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A707 List:
References
NUDOCS 8604210270
Download: ML17278A706 (4)


See also: IR 05000397/1986005

Text

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen

Manager, Regulatory Programs

Gentlemen:

Subject:

NRC Inspection at WNP-2

This refers to the Appendix R fire protection team inspection

conducted

by

Messrs.

P. M.Quails, P. Phelan of this office, and Messrs.

J. Higgins and

R. Hodo'r of Brookhaven National Laboratory on March 3-24,

1986, of activities

authorized by NRC License

No. NPF-21

and to the discussion of our findings

held by the inspection~team with members of your staff at the conclusion of

the inspection.

C

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors

and consultants.

Based

on the results of the inspection, it appears

that certain of your

activities were not in full compliance with NRC requirements.

Enforcement

action by the

NRC relating to the apparent violations of regulatory

'requirements

are discussed

in the attached

report will be the subject of

separate

correspondence.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

8604210270

860404

lJ

PDR

ADOCK 050003'77I

9

PDR

0

I

a

I

I

t

ll

Cg

y 4,

0

r

I'f

.J

Washington Public Power Supply System

-2-

APR 04 1986

Should you have any questions

concerning this inspection

we will be glad to

discuss

them with you.

Enclosure:

Inspection Report No. 50-397/86-05

cc w/enclosures:

C. M. Powers,

WNP2

P. I,. Powell,

WNP2

R. B. Glasscock,

WPPSS

J.

D. Martin, WPPSS

G. E. Doupe, Esq.,

WPPSS

W.

G.

Conn, Burns 8 Roe, Inc.

State of WA

N. S. Reynolds, Esq.,

bcc w/enclosure:

RSB/Document Control Desk

(RIDS)

G. Cook,

RV

B. Faulkenberry,

RV

J. Martin, RV

Resident Inspector

Project Inspec'tor

bcc w/o enclosure

2:

IFMB

Sincerely,y~/

D. F. Kirsch, 4EE~ Director

Division of Reactor Safety and

Projects

Region V

PPhelan/dot

'7'/2/86

3

Pgualls

TYoung

P o nson

AJoh son

R ate

DKirsch

P'wq

4/p/86

4/P/86

4/g/86

4/A/86

4/z /86

4/ g /86

e

C

N g

0

El

l'

J

V

A

,I