Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320A362 + (Forwards Environ Monitoring Results Section of Semiannual Operating Rept Per .W/O Encl)
- ML20034G819 + (Forwards Environ Monitoring Results for 1992 for Cimmaron Facility. Rev 6 to Procedure KM-NC-20-2 Deleted Analysis for Pu in Recognition of Decontamination of Former Pu Facility & Years of Negative Results)
- ML19261D929 + (Forwards Environ Monitoring in Lake Mi, for Jan 1970-Sept 1978)
- ML20082H683 + (Forwards Environ Noise Assessment Repts,In Accordance W/ Facility Environ Protection Plans,Section 4.2.4.1 & ASLB Order (LBP-83-11))
- ML19206B304 + (Forwards Environ Operating Rept 1978, Hydraulic Survey, June 1978, & Monitoring of Cooling Tower Operation Effects on Vegetation in Vicinity of TMI,1978)
- ML20003E433 + (Forwards Environ Operating Rept for 1980)
- ML20003E435 + (Forwards Environ Operating Rept for 1980.)
- B10186, Forwards Environ Operating Rept,Part A:Nonradiological Rept for 1980 + (Forwards Environ Operating Rept,Part A:Nonradiological Rept for 1980)
- IR 05000263/1976005 + (Forwards Environ Protection & Confirmatory Measurements Insp Rept 50-263/76-05 on 760315-17)
- ML20134P063 + (Forwards Environ Protection Plan (Nonradiological), Millstone Nuclear Power Station,Unit 3. Comments or Recommended Revs to Plan Requested)
- B11613, Forwards Environ Protection Plan (Nonradiological), Millstone Nuclear Power Station,Unit 3. Comments or Recommended Revs to Plan Requested + (Forwards Environ Protection Plan (Nonradiological), Millstone Nuclear Power Station,Unit 3. Comments or Recommended Revs to Plan Requested)
- ML20137X311 + (Forwards Environ Protection Plan (Nonradiological) & Draft Tech Specs,In Response to NRC 850913 Ltr.Justification for Deviations from STS Provided)
- ML20137X305 + (Forwards Environ Protection Plan (Nonradiological) & Draft Tech Specs,In Response to NRC .Justification for Deviations from STS Provided)
- ML20100G226 + (Forwards Environ Protection Plan (Nonradiological), Providing for Protection of Nonradiological Values During Operation)
- ML20213E649 + (Forwards Environ Protection Plan (Nonradiological).Plan Will Constitute App B to OL)
- ML20212C474 + (Forwards Environ Protection Plan (Nonradiological). Plan Acceptable W/Mods,Including Deletions of Ref to NPDES Permit)
- ML20117H832 + (Forwards Environ Protection Plan (Nonradiological). Plan Will Become App B of OL)
- W3P82-1229, Forwards Environ Protection Plan (Nonradiological) for Facility + (Forwards Environ Protection Plan (Nonradiological) for Facility)
- ML20206P612 + (Forwards Environ Protection Plan Environ Evaluation 86-2 in Response to Re Rl Anthony 860305 Petition on Alleged Licensee Violations of Certain OL Requirements. Questions Re 10CFR2.206 Petition Answered by)
- ML20151B606 + (Forwards Environ Protection Plan Issued on 870116 for Facility for Inclusion as App B to OL)
- ML17228A932 + (Forwards Environ Protection Plan Rept Providing Description of Reportable Release of Untreated Parking Lot Runoff to Mangrove Impoundment at Facility on 941116,including Description of Percolation Pond Sys Bypass)
- L-94-296, Forwards Environ Protection Plan Rept Providing Description of Reportable Release of Untreated Parking Lot Runoff to Mangrove Impoundment at Facility on 941116,including Description of Percolation Pond Sys Bypass + (Forwards Environ Protection Plan Rept Providing Description of Reportable Release of Untreated Parking Lot Runoff to Mangrove Impoundment at Facility on 941116,including Description of Percolation Pond Sys Bypass)
- W3P82-3175, Forwards Environ Protection Plan, App B to License CPPR-103 + (Forwards Environ Protection Plan, App B to License CPPR-103)
- ML20153F722 + (Forwards Environ Protection Plan,1987,Aerial Remote Sensing Vegetative Communities & Cooling Tower Effects on Area Fog Events. Summaries & Analyses of Results of Activities Required by Environ Protection Plan Also Encl)
- AECM-81-380, Forwards Environ Protection Plan,App B,To CPPR-118 & CPPR- 119 + (Forwards Environ Protection Plan,App B,To CPPR-118 & CPPR- 119)
- ML19338C838 + (Forwards Environ Protection Program Preoperational Monitoring Rept)
- ML19338C839 + (Forwards Environ Protection Program Preoperational Monitoring Rept.)
- ML13322A980 + (Forwards Environ Qualification Document Package for Bunker Ramo (Amphenol) Electrical Penetrations Installed at Unit 1, Per .Encls Withheld)
- ML20072L346 + (Forwards Environ Qualification Documentation Rept, 90-day Response Required by NRC SER for Environ Qualification of safety-related Electrical Equipment)
- ML17156A741 + (Forwards Environ Qualification Enforcement Conference Repts 50-387/86-25 & 50-388/86-28 on 880630)
- ML18093B236 + (Forwards Environ Qualification Enforcement Conference Repts 50-272/86-23 & 50-311/86-23 on 880929)
- ML20206C995 + (Forwards Environ Qualification Enforcement Conference Rept 50-219/85-39 on 881020)
- ML20155A568 + (Forwards Environ Qualification Enforcement Conference Rept 50-289/86-06 on 880824 Re Emergency Fan Cooling Cable)
- ML20154F408 + (Forwards Environ Qualification Enforcement Conference Rept on 880812 Re Insp Repts 50-334/88-21 & 50-334/86-12)
- ML19325E340 + (Forwards Environ Qualification Enhancement Program Addressing Listed Areas,Including Staffing,Procedures & Training)
- 3F1089-18, Forwards Environ Qualification Enhancement Program Addressing Listed Areas,Including Staffing,Procedures & Training + (Forwards Environ Qualification Enhancement Program Addressing Listed Areas,Including Staffing,Procedures & Training)
- ML20027D617 + (Forwards Environ Qualification Evaluation of Cable Splices Inside Containment for OPPD for Use in Ft Calhoun Nuclear Generating Station,Unit 1. Cable Splices Will Operate as Required During & After Accident)
- ML20027D618 + (Forwards Environ Qualification Evaluation of Cable Splices Inside Containment for OPPD for Use in Ft Calhoun Nuclear Generating Station,Unit 1. Cable Splices Will Operate as Required During & After Accident)
- ML20206L412 + (Forwards Environ Qualification Insp Repts 50-277/88-38 & 50-278/88-38 on 880926-30 & Notice of Violation)
- ML20204E284 + (Forwards Environ Qualification Insp Repts 50-245/88-14 & 50-336/88-20 on 880816-19.Potential Violations Noted. Enforcement Conference Will Be Held in Near Future to Discuss Ideal Model 74B Wirenut Deficiencies)
- ML19347E782 + (Forwards Environ Qualification Insp Rept 99900100/81-01 on 810122-23.No Noncompliance Noted)
- ML19332D185 + (Forwards Environ Qualification Insp Repts 50-445/89-60 & 50-446/89-60 on 890807-11 & Notice of Violation.Open Item Identified Re Incorporation of Vendor Maint Requirements & Recommendations Into Plant Maint Requirements)
- PLA-1084, Forwards Environ Qualification Justification for Interim Operation of Class IE Equipment Per NUREG-0588.Tech Specs Meet Qualifications Contained in Generic Ltr 82-09 + (Forwards Environ Qualification Justification for Interim Operation of Class IE Equipment Per NUREG-0588.Tech Specs Meet Qualifications Contained in Generic Ltr 82-09)
- ML19352A850 + (Forwards Environ Qualification Program for Class IE Electrical Equipment for Shoreham Nuclear Power Station - Unit 1, in Response to NUREG-0588)
- ML19352A851 + (Forwards Environ Qualification Program for Class IE Electrical Equipment for Shoreham Nuclear Power Station - Unit 1, in Response to NUREG-0588)
- L-81-499, Forwards Environ Qualification Rept & Guidebook for safety-related Electrical Equipment.Fsar Will Be Revised to Reflect Submittal.Meeting W/Equipment Qualification Branch Expected Prior to Site Audit Scheduled in Early 1982 + (Forwards Environ Qualification Rept & Guidebook for safety-related Electrical Equipment.Fsar Will Be Revised to Reflect Submittal.Meeting W/Equipment Qualification Branch Expected Prior to Site Audit Scheduled in Early 1982)
- ML17266A529 + (Forwards Environ Qualification Rept & Guidebook for safety-related Electrical Equipment.Fsar Will Be Revised to Reflect Submittal.Meeting W/Equipment Qualification Branch Expected Prior to Site Audit Scheduled in Early 1982)
- ML17297B886 + (Forwards Environ Qualification Rept Per Requirements of NUREG-0588, in Response to Request for Info Per NUREG-0857, Ser,Section 3.11.Rept Supports 830314 Qualification Program Audit)
- ML17297B887 + (Forwards Environ Qualification Rept Per Requirements of NUREG-0588, in Response to Request for Info Per NUREG-0857, Ser,Section 3.11.Rept Supports 830314 Qualification Program Audit)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept)
- B11400, Forwards Environ Qualification Rept for safety-related Mechanical Equipment,Per 840731 SER (NUREG-1031) Open Item 7.Rept Outlines Evaluation Methodology & Summarizes Evaluation Results + (Forwards Environ Qualification Rept for safety-related Mechanical Equipment,Per 840731 SER (NUREG-1031) Open Item 7.Rept Outlines Evaluation Methodology & Summarizes Evaluation Results)