ML20206L412
| ML20206L412 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/21/1988 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20206L417 | List: |
| References | |
| NUDOCS 8811290563 | |
| Download: ML20206L412 (2) | |
See also: IR 05000277/1988038
Text
_ _ _
_ _ _ _ _ - _ _ _
_
.,
.3 ,...s.,
,.
,
,
,
N.'
- '
-.
.
,u .
>
t
,
!
.NOV 21 1938
'^
'
. Docket Nos.
50-277
50-278
[
Philudelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President-Nuclear
Correspondence Control Desk
-P. O. Box 7520
/
Philadelphia, Pennsylvania 19101
Gentlemen:
,
f
Subject:. Combined Inspection Report Mos. 50-277/88-38 and 50-278/88-38
Enclosed is the report of the Environmental Qualification inspection conducted
'by Mr. Leorard Cheung on September 26-30, 1988, at the Philadelphia Electric
l
Company Corporate Office in Philadelphia, Pennsylvania and the Peach Bottom
,
Atomic Power Station Units 2 and 3 in Delta, Pennsylvania of activities
.
'
authorized 11 NRC License No. OPR-44 and DPR-56, respectively. The team's
findings were discussed with members of your staff at the conclurion of the
i
inspection.
Areas examined during this inspection are described in the NRC Region I
f
Inspection Report which is enclosed with this letter. Within these areas, the
'
-
inspection consisted of selective examinations of procedures and representative
i
records, interviews with personnel, and observations by the inspector.
.
Dased on the results of this inspection, it appears that one area of your
,
l
activities was not conducted in full compliance with NRC requirements, as set
l
forth in the Notice of Violation, enclosed herewith as Appendix A.
This
'
!
violation has been categorized by severity lovel in accordance with the
"General Statement of Policy and Procedure for NRC Enforcement Actions,10 CFR
r
Part 2, Appendix C (Enforcement Policy 1987)." You are required to respond '.o
,
this letter and in preparing your response, you shculd follow the instructions
4
in Appendix A.
.
{
Your cooperation with us in this matter is appreciated.
Sincerely,
.
i
Ort e L.31 N >md EyI
l
Joaquo P. kn
!
l
i
Thomas T. Martin, Director
!
Division of Reactor Safe y
I
'
'
0FFICIAL RECORD COPY
CIR PB 88-38 - 0001.0.0
f
11/02/88
9811290563 G81121
ADOCK 05000277
\\ \\
Q
} { e,g {
<
-
-
..
.
.
.
.
.
NO 2 1 1938
.
.
.
Philadelphia Electric Company
'2
Enclosures:
1.
Appendix A, Notice of violation
2. .NRC Inspection Report No. 50-277/88-38 and 50-278/88-38
cc w/encis:
l
John S. Kemper, Sr. , Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
,
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom' Atomic Power Station
-
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. bradley, Esquire, Assistant General Counsel-(Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Si Jng, Nuclear Evaluations
'
W. M. Alden, Director, Licensing Section
Doris Poulse1, Secretary of Harford County Ccuncil
Public Document Roon
LR)
Local Public Docume : Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Conuonwealth of Pennsylvania
,
bec w/encls:
Region I Docket Room (with concurrences)
,
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
PA0 (2) SALP and All Inspection Reports
Robert J. Bores, DRSS
i
R. Martin, NRR
B. Clayton, EDO
i
I
h
d
SU In-
C 'l
/ 7ei rp.< >l ' ,,, ,,,
g
i
RI:0RS
RI:
S
R1:DRS
i
Cheung/gcb/rw Anderson
Marsh
10/!/88
07 / /88
/g/88
l'!/f
f
3
0FFICIAL RECORD COPY
CIR PB 88-38 - 0001.1.0
10/28/88
,
-
. - - - . - .---- -. - - . - -
-