Forwards Environ Qualification Insp Repts 50-245/88-14 & 50-336/88-20 on 880816-19.Potential Violations Noted. Enforcement Conference Will Be Held in Near Future to Discuss Ideal Model 74B Wirenut Deficiencies
ML20204E284
Person / Time
Site: Millstone  
Issue date: 10/14/1988
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20204E287 List:
References
NUDOCS 8810210331
Download: ML20204E284 (2)


See also: IR 05000245/1988014

Text

~

7

,

.

-

.

.

OCT 141988

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATIN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report Nos. 50-245/88-14 and 50-336/88-20

This refers to the environmental qualification (EQ) inspection conducted by

Mr. Leonard Cheung of this office on August 16-19, 1988 at your corporate

office at East Berlin, Connecticut, of activities authorized by NRC License

Nos. OPR-21 and DPR-65 and to the discussions of our findings held by

Mr. Cheuno with Mr. R. Harris and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the NRC Region !

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of review of environmental qualification records and

interviews with personnel.

This inspection identified several potential violations

These deficiencies

were previously identified by your staff. As discussed in our letter to you,

dated October 4,1988, we plan to hold an enforcement conference in the near

future to discuss the Millstone 2 Ideal Model 748 wirenut deficiencies and

several equipment deficiencies for the Millstone 1 Standby Gas Treatment

System.

These items include PE/PVC cables. GE EB-5 terminal blocks, Honeywell

Microswitches and 3M "Scotchlock" wirenuts. We will notify you of our

actions regarding all of the potential violations identified in this report in

the future.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Oricinal Cirnt i Byt

011rf or ! J. *

n:n

Thomas T. Martin, Director

Division of Reactor Safety

0FFICIAL RECORD COPY

CIR MILL 88-14/20 - 0001.0.0

10/05/88

\\

G810210331 091014

g.g

1(

DR

ADOCK 0500

3

t

.

OCT 141930

'

.

'

Northeast Nuclear Energy Company

2

Enclosure: NRL Region I Inspection Report Nos. 50-245/88-14 and 50-336/88-20

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

O. O. Nordquist, Directur of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

J. Shedlosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone 3

H. Boyle, LPM, NRR

R. Bores, DRSS

Cg

Cl2 bl

RI:DRS bI C

RI:DRS

RI:DRS

Cheung/mlb/pmb/rw

Anderson

Durr

10

/88

10/4/88

10/10/88

0FFICIAL RECORD COPY

CIR MILL 88-14/20 - 0001.1.0

10/03/88

- -

,

-

.-

-