Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Complete Scenario Package for June 1983 Exercise of Plant". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20154H753  + (Forwards Complete Response to NRC Bulletin 88-005 & Suppls 1 & 2, Nonconforming Matl Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co at Williamstown,Nj)
  • ML20083D683  + (Forwards Complete Response to Noncompliance Identification Repts 006 & 007 Re Training of Const Personnel.Determination of Acceptability of Commitments to Resolve Noncompliance Requested)
  • ML20091H765  + (Forwards Complete Response to Nonconformance Identification Rept 22 Re Document Control & Update of Work Station Logs as Requested in Tracked Action Item 086)
  • ML20053E103  + (Forwards Complete Response to Notice of Violation & Proposed Imposition of Civil Penalties Re IE Insp Rept 50-358/81-13)
  • ML20086P908  + (Forwards Complete Response to Observation 035,Rept 22, Including:Ra Wells ,Bechtel Ltrs BCCC-8985 & BCCC-8955,util & Qar RA-00062.W/o Encl)
  • ML20003B692  + (Forwards Complete Response to Question 121.33 Re Reactor Vessel Support Mod,In Response to NRC 800919 Request.Also Documents Util 800820 Verbal Responses to Parts 1 & 2. Question & Response Will Be Incorporated in FSAR)
  • ML20238A369  + (Forwards Complete Response to Question 7 of NRC 861216 Request for Info Re Util Response to NUREG-0737,Item II.D.1, Relief & Safety Valve Test Requirements)
  • ML18026A507  + (Forwards Complete Response to SA Varga 800421 Request for Info on Category 1 Masonry Walls Employed by Plants Under CP & OL Review)
  • ML20092C205  + (Forwards Complete Response to Tracked Action Item 088 Re Module 120D in Auxiliary Bldg)
  • ML20084L354  + (Forwards Complete Response to Tracked Action Item 074 of Const Implementation Overview Nir 22,23,24,25,26 & 27 Re Document Control Program for Turbine Bldg Walkdown)
  • ML20080S852  + (Forwards Complete Response to Tracked Action Item 053.W/o Encl)
  • ML20080K105  + (Forwards Complete Response to Tracked Info Item 041 Re Transamerica Delaval,Inc Emergency Diesel Generators)
  • ML20084Q248  + (Forwards Complete Response to Tracked Info Item 075 Re ANSI N 45.2 Section 6,ASME III Nf 4121 1974 Edition,Asme Code Case 1651)
  • ML20084Q353  + (Forwards Complete Response to Tracked Info Item 072 Re NDE Procedure Inconsistent in Specifying Procedure,Page & Rev Number.Bechtel 840430 Encl Ltr Provides Adequate Response to Item)
  • ML20090K366  + (Forwards Complete Response to Tracked Info Item 059 Re Audit Repts & Past Findings/Unresolved Items)
  • ML20084Q233  + (Forwards Complete Response to Tracked Info Item 73 Re NDE Procedures)
  • ML20091R559  + (Forwards Complete Response to Tracked Recommendation Item 082 Re Audits of Applicable Criteria of 10CFR50,App B for Site Contractors)
  • ML20054E655  + (Forwards Complete Responses to NRC Questions Re Util 820226 General Design Criteria 17 Submittal.Mods Will Be Completed by Second Refueling Outage After 820901)
  • ML20078S075  + (Forwards Complete Responses to Safety Evaluation Questions Inadvertently Omitted from 830715 & 0902 & 08 Submittals.No Tests within Preoperational Test Schedule Intended to Be Delayed Beyond Fuel Loading)
  • ML20087J427  + (Forwards Complete Responses to Tracked Info Items 058,059 & Tracked Recommendation Item 060 Re Site Auditing)
  • ML20196E867  + (Forwards Complete Results of 980215 Insp of SG Tubes at Songs,Unit 2,per TS 5.7.2.c)
  • 2CAN088913, Forwards Complete Results of Steam Generator Tubing Inservice Insp Conducted During Period of 880216-22.All Eddy Current Insp Data Analyzed by Independent Group in Parallel W/Inservice Insp Contractor  + (Forwards Complete Results of Steam Generator Tubing Inservice Insp Conducted During Period of 880216-22.All Eddy Current Insp Data Analyzed by Independent Group in Parallel W/Inservice Insp Contractor)
  • ML20101G685  + (Forwards Complete Rev 1 Text of Human Factors Engineering Itaac/Dacs)
  • ML20196K209  + (Forwards Complete Review & Update of Emergency Plan for AGN-201M Reactor Located at Univ of Nm.Majority of Changes Will Bring Definitions of Workers in Line with Those of Radiation Safety Ofc & Radiation Control Committee)
  • ML20235V481  + (Forwards Complete Safety Evaluation on TMI Action Item II.F.2.First Page Inadvertently Omitted from 870910 Rept)
  • AECM-89-0154, Forwards Complete Scenario Package for Facility Emergency Preparedness Exercise on 890925.W/o Encl.States of Ms & La Will Participate  + (Forwards Complete Scenario Package for Facility Emergency Preparedness Exercise on 890925.W/o Encl.States of Ms & La Will Participate)
  • 0CAN028701, Forwards Complete Scenario for 1987 Radiological Emergency Preparedness Exercise,Per 45-day pre-exercise Requirement. Pre-exercise Briefings for Observers/Controllers & post- Exercise Critiques for 870316-20 Also Encl  + (Forwards Complete Scenario for 1987 Radiological Emergency Preparedness Exercise,Per 45-day pre-exercise Requirement. Pre-exercise Briefings for Observers/Controllers & post- Exercise Critiques for 870316-20 Also Encl)
  • ML20098C962  + (Forwards Complete Security Plan.Plan Withheld (Ref 10CFR73.21).Destruction of All Previous Security Plans,Including Rev 9,requested)
  • ML20094H729  + (Forwards Complete Set of All Abstracts of Transcripts of Hearings Conducted on 811231-830630.W/listing of Entire Set of Abstracts)
  • ML19224D767  + (Forwards Complete Set of Calculations & Results of Reanalysis of Spent Fuel Shipping Cask Drop Accident W/Pool Water at 680-foot Level)
  • ML20217G825  + (Forwards Complete Set of Construction Documents for Phase II Construction for Shiprock Site as Requested During Meeting on 851022)
  • ML19330B014  + (Forwards Complete Set of Correspondence Re Hearing Aslab Request for Assistance in Obtaining Special Maps for TMI-1 Restart Hearing from Gs.Maps Being Developed Will Serve as Models for Establishing Base Map Requirements within NRC)
  • ML20128D531  + (Forwards Complete Set of Documents That Northeast Utils Provided to Co-operative Citizens Monitoring Network (Ccmn) in Response to Ccmn 921205 & 16 Discovery Requests,Per Me Marucci Request.W/O Encl.Related Correspondence)
  • ML20128H313  + (Forwards Complete Set of Draft Responses to Advanced BWR Ssar,Chapter 8 non-ITAAC Draft FSER Open Items,Including Open Item 8.3.5-1 Re Roadmap.Transmittal Replaces 930129 Transmittal & Incorporates Info Discussed in Telcons)
  • ML19210D729  + (Forwards Complete Set of Evaluations from Sept Planning Course Held in Allerton Park.Student Perspective Re Usefulness Different than Original Feedback)
  • ML20127P483  + (Forwards Complete Set of Gantt Charts Showing Progress in Performance Improvement Program Through 930115 on Each Open Program Element.Item Associated w/V-104 Tank Expansion Completed.Submission Consistent w/920401 Meeting Agreements)
  • ML20212B024  + (Forwards Complete Set of Matls Distributed During 970806 Meeting/Video Conference Between Doe,Nrc,State of Co & Hecla Mining Co,Held at DOE Grand Junction Ofc.Appreciation of Participation in Meeting,Expressed)
  • ML20115G138  + (Forwards Complete Set of Microfiche of LERs from Facility, Per Telcon.Replacement of Existing Fiche W/Encl Fiche Will Update Files.Notification of When Addl LER Microfiche to Be Sent Requested)
  • ML20207B164  + (Forwards Complete Set of Procedures That Have Been Signed & Implemented.Addl Changes May Be Made to New Program Procedures After Implementation)
  • ML17054D036  + (Forwards Complete Set of Responses to First Round Requests Re NEDO-21061,Mark II Containment Dynamic Forcing Functions Info Rept, Revision 3.Responses to Be Inserted Into App a)
  • ML20100H158  + (Forwards Complete Set of Review Issues Lists (Ril) Summarizing All Findings & Open Items Identified to Date. Disciplines Included & Corresponding Ril Revs Listed.Lists Will Be Reviewed on Weekly Basis & Reissued as Necessary)
  • ML20249B314  + (Forwards Complete Set of Revised TS Pages Which Improve Certain Sections of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM)
  • ML20199G670  + (Forwards Complete Set of Ssers in Mechanical/Piping Area. Comments from Qa/Qc Group Requested.W/O Encl)
  • ML20154K796  + (Forwards Complete Sets of Well Analyses for 1986 & 1987,per 880426 Request)
  • ML20133A091  + (Forwards Complete Statement of Terms of Contract Career Counseling Program Including Outcomes of Counseling & Financial Arrangements)
  • AECM-81-272, Forwards Complete Structural Checklist of Audit Conducted on 800317-21,per Structural Engineering Branch Request  + (Forwards Complete Structural Checklist of Audit Conducted on 800317-21,per Structural Engineering Branch Request)
  • ML20062K355  + (Forwards Complete Submittal List & Statement Re NUREG-0737 Per Discussion)
  • ML17228A882  + (Forwards Complete TER,EGG-DNSP-11487,per NRC Re Bulletin 90-01,suppl 1, Loss of Fill Oil in Transmitters Mfg by Rosemount. Original TER Was Missing Every Other Page)
  • ML20197G197  + (Forwards Complete Tech Specs for Facility License.W/O Encl)
  • ML20198L657  + (Forwards Complete Text of TSs for UTR-10 Reactor Facility Which Are Being Updated to Reflect Change in Facility Operating Status)