Forwards Complete Response to Tracked Info Item 041 Re Transamerica Delaval,Inc Emergency Diesel Generators
ML20080K105
Person / Time
Site: Midland
Issue date: 02/07/1984
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7188, NUDOCS 8402150299
Download: ML20080K105 (3)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

CONSUMERS POWER COMPANY MIDiAND ENERGY CENTER 50-30R Transmittal No: CSC-7188 Date:

February 7, 1984 -

To: Stone &' Webster P O Box 1963 Midland, MI 48640

{ nail:CIPAL STAR

.[M I

1atK.Q L 4-Attached Is:

Partial Response To

{g j

}-11.-

[ Complete Response To

_\\

C L_i_

__I For Your Information

[

. _.L.L1E -

L Other

==

Description:==

Tracked Information Item No. 041.

M/ Signature:

t

\\JCKeppler, NRC Region'III w/a cc JJHarrison, NRC Region III w/a RJCook, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC r/a NIReichel, MEC w/a DDJohnson, MEC w/a FEB 10 1984 8402150299 840207 PDR ADDCK 05000329 I

j gf ) )

S PDR

o Sheet 1 of 2

" """ * ** l" ' * * * '"T " U M B ER-STONE & WEBSTER 9p

(

CONSTRUCTION IMPLEMENTATION l 0 TRACKED ACTION ITEM O TR ACKED INFORMATION ITEM N/BldNB NFCZEAR Fl4NTJ.O. NO.: /450S O TRACKED RECOMMENDATION ITEM REFERENCE (S) N lxLwr of h&P 8, M, Mrlai M-O UNTRACKEDITEM 8852, Enerspncy Diesel Cserator, Transmerica Delaval, Inc.,

, O HOLD POINT NOTIFICA. TION hoe fnt Mrrntim nF TmtaMatim CONDITION DETAILS The referenced letter indkates that BPCo is preparing for resumption of installation work on the emergency diesel generators.

BPCo Material Requisition 7220-M-18 (Q) requires that the emergency diesel generators be furnished in accordance with several listed BPCo specifications and drawings.

~'

Additionally, this work may be affected by current activities relative to the evaluation of Phase III activities on FCRs/FCNs, vendor drawings and FSKs.

Therefore, please provide C10 with CPCo plans and schedules for assuring that prior to relea' sing the dissel generator installation work, the above issues are resolved.

You are also requested to address..your plans for covering other activities relevant toJ this work such as training / qualification of personnel, material control, installation craar x NO control, etc.

S uo.n (Please see Sheet 2)

ATTACHMENTS

(

i D ATE RESPONSE REO'D.

INITIATOR /DATE INITIATIO APPROVED /DATE

//W

/ ~S - 2*/

fhj

/~ f-8 c/

/

RESPONSE

The referenced letter (BCCC-8852) is a request to resume installation of oNLY thh non-ASME Contract 7220-M-18AC is a commodities forming part of the Emergency 31esel Generators.

d purchase order.

CPCo Serial 26332, R. Wells to JARutgers, 11/2/83

,Bechtel Ann Arbor generate,

However, released all Bechtel Ann Arbor generated purchase orders from the Stop Work.

based on a review of method of transmittal of TDI documents to the field it has been decided

'to withold rc~sumption of this work until the Stop Work orders are rescinded.

(TDI)

The non-ASME work will be performed in accordance with Transamerica Delaval Inc.

drawings and procedures, under the technical direction of a TDI technical specifications, Field Representative and in accordance with the TDI Quality Assurance Manual, including the TDI will determine which activities require QC inspection; Midland Site-Specific Addenda.

The TDI Quality MPQAD will review and approve this determination and overview inspection.

Control Representative will provide first line in'spection in accordance with TDI Midland

  • ^

graag Site Procedures.

YES wo. n no (Please see sheet 2)

ATTACHMENTS EST. CORRECTIVE ACTION RESPO'NDE T TITLE DATE

/ ]ue C"r kr

'h4f COMPLETION DATE

/

a RESPONSE AbCEPTED DATE RESPONSE VERIFIED / CLOSED DATE

It".m Number 041

  • ~

~

Sheet 2 of 2 CONDITION DETAILS'(continued)

[

After review 'of the requested information, CIO will determine whether in-process evaluation of CPCo actions wil1 be conducted or a Hold: Point will be establish 6d '

at the completion of CPCo action fo; CIO to assess the readiness to procedd.

~

^

RESPONSE (continued).

's Quality-related activities such as training / qualification of personnel are provided

for in thd TDI Quality Assurance-Manual', sspplemente'd by the Midland Site Specific'

' procedures.

5.

~

- Material control -at the site is,.provided-by Bech;e1 in accordanc.e.with the-FIG-9.000, 9.100'and 9.200.

Insta11aEion of[non-ASME commodit-ies is performed under'the direct a.upervision and QC inspec' tion of'TDI F'ielti Rep'res en't ative s.

Bechtel provides only the cra f t labor to perform the work,j compliance -to Field Procedure FPGe7.300 ensures the'se controls ird properly implemen_ted.-

=

~~

~

.s g

om 4 a

Sh 6

e G