Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML020670005 + (Forward Copy of Energy Northwest 2001 Annual Financial Report)
- ML20212D350 + (Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006)
- ML20133K367 + (Forward Copy of Joint Resolution 9,which Was Introduced in California Senate on 580408 & San Francisco Chronicle)
- ML20129H462 + (Forward Copy of Latest as-built Drawings of NRC Operation Ctr Fifth Floor Computer Room.W/O Encl)
- ML20154S449 + (Forward Copy of Lv Gossick & Chairman Hendrie Testimony Before Senate Subcommittee on Nuclear Relations on 771013)
- ML20135F177 + (Forward Copy of Resolution of Comments on Preliminary Accident Sequence Precursor Analysis of Operational Event at McGuire Nuclear Station,Units 1 & 2)
- ML18102A305 + (Forward Corrected Copy of LER Re Potential Hydrogen Embrittlement on 4kV Breaker Parts)
- ML18102A306 + (Forward Corrected Copy of LER Re Potential Hydrogen Embrittlement on 4kV Breaker Parts)
- ML20206D723 + (Forward Current Lists,As of 870327,providing Util Understanding of SER Outstanding Issues.Specific Description of Issues Not Resolved to NRC Satisfaction,Requested)
- ML19317D679 + (Forward Dec 1972 Ser,Suppl 2.W/o Encl)
- RBG-19675, Forward Des (NUREG-1073) Table 4.1 Re Onsite Area Land Use,Per NRC Request.Table 4.1 Represents Acreages for One Unit Station + (Forward Des (NUREG-1073) Table 4.1 Re Onsite Area Land Use,Per NRC Request.Table 4.1 Represents Acreages for One Unit Station)
- ML16342B416 + (Forward Detailed Comments of NRC Consultants on Presentations Made by PG&E at 871104-06 Workshop on Soil Structure Interaction as Part of long-term Seismic Program)
- ML15194A309 + (Forward Documents Containing Safeguards Information-Modified Handling Information)
- ML20058G370 + (Forward Draft Minutes,Including Transcript of 901010-11 Meeting in Reno,Nv)
- LD-92-089, Forward Draft Rev of Pilot ITAAC for Sys 80+ Std Design,In Response to NRC 920521 Comments on 920430 Submittal.Revs Account for Comments Provided by NUMARC & Reflect Comments Obtained in NUMARC 920716 Meeting + (Forward Draft Rev of Pilot ITAAC for Sys 80+ Std Design,In Response to NRC 920521 Comments on 920430 Submittal.Revs Account for Comments Provided by NUMARC & Reflect Comments Obtained in NUMARC 920716 Meeting)
- ML13326A799 + (Forward Draft full-term OL DPR-13.License Condition, Incorporating Confirmatory Order Issued by NRC on 900102, Added to License.Anticipates That License Will Be Issued in Aug 1991)
- ML20077M650 + (Forward Effluent & Waste Disposal,Gaseous Effluents - Summation of All Releases,Semiannual Rept,1983, Rev 2 to Operating Procedure 1104-28I & Proposed Rev 3 to Operating Procedure 9100-ADM-4200.01)
- LIC-16-0091, Forward Emergency Plan Update + (Forward Emergency Plan Update)
- ML19220C131 + (Forward Existing Level D Schedule for SER Inputs from Individual Branches.Inputs Should Be Expedited)
- ML16250A433 + (Forward Final Report on Independent Confirmatory Survey Summary and Results for the Discharge Canal and Annex Building 6 at the Humboldt Bay Power Plant, Eureka, California)
- ML19247A586 + (Forward First Interim Deficiency Rept Re Diesel Generator Turbocharger Lubrication)
- ML19247A587 + (Forward First Interim Deficiency Rept Re Diesel Generator Turbocharger Lubrication)
- ML19326C965 + (Forward Fish Impingement Monitoring Results for Sept 1977. W/O Encl)
- HL-1758, Forward Fitness for Duty Performance Data for Six Month Reporting Period,Jan - June 1991,as Required by 10CFR26.71(d) + (Forward Fitness for Duty Performance Data for Six Month Reporting Period,Jan - June 1991,as Required by 10CFR26.71(d))
- ML20092M969 + (Forward Fitness for Duty Program Performance Data for Six Month Period Jul-Dec 1991)
- ML18193A504 + (Forward GNF-A Organization Chart)
- ML19329E611 + (Forward IE Bulletin 75-08, PWR Pressure Instrumentation. Action Required)
- ML20050B768 + (Forward IE Insp Rept 50-206/82-05 on 820222-26 & Notice of Violation)
- ML19326B592 + (Forward IE Insp Rept 50-313/75-10 on 750812-14 & Notice of Violations)
- ML19326D185 + (Forward IE Insp Rept 50-329/77-03 on 770421 & 22.No Noncompliance Noted)
- ML19208D152 + (Forward IE Insp Rept 50-358/79-18 on 790709-12.No Noncompliance Noted)
- ML20049J834 + (Forward IE Insp Rept 50-361/82-08 on 820209-12.No Noncompliance Noted)
- ML19296A329 + (Forward IE Insp Rept 79-572/78-01 on 781219-20.No Noncompliance Noted)
- ML20141K618 + (Forward Info Re Intergranular Cracking at Plant)
- ML18100A329 + (Forward Info on Continued Progress on Plant Material Condition Improvement Project,Including Status of Various Projects Underway.Photograhps Also Encl)
- ML052200511 + (Forward Information to Support the Review of the Application for Renewed Operation License - Oyster Creek Generating Station)
- IR 05000280/1992010 + (Forward Initial SALP Repts 50-280/92-10 & 50-281/92-10 for Stated Period.Performance in Four Functional Areas Rated Superior & Other Areas Received Ratings of Good)
- ML20043B315 + (Forward Initial SALP Repts 50-327/90-09 & 50-328/90-09 for 890204-900305.Performance Evaluated in Functional Areas of Plant Operations,Security,Engineering/Technical Support & Safety Assessment/Quality Verification)
- NLS9000537, Forward Initial Simulator Certification Submittal, Per 10CFR55.45 + (Forward Initial Simulator Certification Submittal, Per 10CFR55.45)
- ML20057C316 + (Forward Insp Rept 50-302/93-21 on 930711-0814 & Notice of Violation.Violation of Concern Because Short Term Corrective Actions in Response to Previous Event & Violation Inadequate)
- ML20133P228 + (Forward Insp Rept 50-482/85-22 on 850423-25.No Violations or Deviations Noted)
- ML20133P232 + (Forward Insp Rept 50-482/85-22 on 850423-25.No Violations or Deviations Noted)
- ML20209C180 + (Forward J Schuyler Re Author Request for Investigation)
- 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip + (Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip)
- 05000295/LER-1979-051, Forward LER 79-051/03L-0 + (Forward LER 79-051/03L-0)
- ML19305E802 + (Forward LER 80-015/99X-0)
- 05000368/LER-1980-015, Forward LER 80-015/99X-0 + (Forward LER 80-015/99X-0)
- ML20077Q979 + (Forward LER Re Three Events That Received Enforcement Discretion.Events Dealt W/Problems Encountered During Mod 2A-A DG Speed Controller,Problems W/Unit 1 Vital Inverter 2-I & Oil Sys Problems on Unit 2 TDAFP)
- ML20076F821 + (Forward LERs 83-040/03L-0 & 83-028/03L-0)
- ML20127G730 + (Forward License DPR-22,w/appended TS & Fr Notice.Amend 2 to Indemnity Agreement B-42 Also Encl.W/O Indemnity Agreement)
- ML20127G734 + (Forward License DPR-22,w/appended TS & Fr Notice.Amend 2 to Indemnity Agreement B-42 Also Encl.W/O Indemnity Agreement)