IR 05000280/1992010

From kanterella
Jump to navigation Jump to search
Forward Initial SALP Repts 50-280/92-10 & 50-281/92-10 for Stated Period.Performance in Four Functional Areas Rated Superior & Other Areas Received Ratings of Good
ML18153D049
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/09/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152A033 List:
References
NUDOCS 9207020235
Download: ML18153D049 (4)


Text

r

'.

.,,

I -

\\

. \\'6:ec, -

',. *jf'.*

'.,\\

.

.,./

{

' *.

  • -* *>"**---*** *,** *-,*,,,_,...,. * I** ****---* **~-**

'.<,~/

.. \\~',' -..

Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 JUNO 9 1~~2.

Virginia Electric and Power Company ATTN: Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT: SURRY SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (INSPECTION REPORT NOS. 50-280/92-10 AND 50-281/92-10)

The NRC Systematic.Assessment of Licensee Performance (SALP) has been completed for your Surry facilit The facility was evaluated for the period March 31, 1991, through April 4, i99 The results of the evaluation are documented in the enclosed Initial SALP Repor This report wi_ll be discussed. at a public meeting to be held at the Surry facility on June 22, 19~2, at 1:00 *

Surry's performance was evaluated in the functional areas of Plant Operations, Radiological Controls, Emergency Prepared-ness, Maintenance/Surveillance, Security, Engineering/Technical Supporti and Safety Assessment/Quality Verificatio Performance in four of the functional areas was rated as superior and the other areas received ratings of goo Overall performance continued to improve as noted by the superior performance rating in operation Senior management support* of the station was evident in the form of facility upgrades including the construction of a new administration building and startup/operation of the rad waste facilit Station management.

continued *to emphasize the need for continuing excellence in the*

areas of radiological controls, security, and emergency

-

preparedness and the station staff responded with superior performanc Progress has been made in the maintenance/surveillance area with some *reduction in backlog Performance, although rated good, could be improved by focussing more attention on the detail Engineering/Technical Support provided good support to the station and there were instances of support that exceeded SALP level 2 such as operator training and response to emerging i'ssue However, additional management attention is needed to attain a consistently high level of performanc *

92o1o2A0D~~f 6i888~so PDR PDR *

I\\ I reol

..

...

-- - - ---~----------------------~

Virginia Electric & Power Company

JUNO 9 1~92*

The performance rating of safety assessment/quality verifications area was good with a staff recommendation of additional manage~

ment attention to recover the loss of an improving trend from the previous perio Any comments you have concerning this evaluation should be submitted to this office within 30 days foliowing the date of our meetin These comments will be considered in the development of the Final SALP Repor Your-comments and a summary of our meeting will be issued as an appendix to the Final SALP Repor Should you have any questions concerning this letter,* we will be

  • glad to discuss them with yo Enclosure:

Initial SALP Report - Surry cc w/encl:

E. w. Harrell

Sincerely, Original signed by Stewart D. Ebneter Regional Administrator Vice President - Nuclear Services Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 J; P. O'Hanlon Vice President - Nuclear Operations Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P. 0. Box 315

Surry, VA 23883 cc w/encl cont'd:

See page 3

-,,

'

.*

Virginia Electric & Power Company_

cc w/encl cont'd:

M. L_. Bowling, Jr., Manager Nuclear Licensing

Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060

  • Sherlock Holmes, Chairman Board.of Supervisors of Surry County Surry County Court~ouse Surr}', VA 23683 Dr. W

~ T. Lough Virginia State Corporation Commission_

Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Michael w. Maupin Hunton and Williams P. o. Box 1535 Richmond, VA 23212 c. M. G. Buttery, M.D., M. state-Health Commissioner Office of the Commissioner Virginia Department of Health P. o~ Box 2448 Richmond, VA 23218 Attorney General Supreme Court Buiiding 101 North 8th Street Richl!lond, VA 23219 INPO bee w/encl:

The Chairman K. c. Rogers, Commissioner J. R. Curtiss, *commissioner F. J. Remick, Commissioner J.M. Taylor, EDO H. L. Thompson, Jr., EDO J. F. Wechselberger, Regional Coordinator, EDO T. E; Murley, NRR S. Varga, NRR bee w/encl cont'd:

See page 4 JUNO 9 1992

  • Company bee w/encl cont'd:

L. Engle, :NRR H. Berkow, NRR B. Buckley, NRR

. _.. *. - *-*.:

F. Allenspach, SALP Coordinator, NRR Regional Administrators, RI, RIII RIV~ and RV K. Cl~rk, RII, PAO M. Sinkule, DRP, RII P. Fredrickson, DRP, RII NRC Resident Inspectors A. Ruff, DRP, RII *

-

TSS, RII DRS and DRSS Branch Chiefs, and Section Chiefs Docume_nt Control -Desk RII:DRP ARu~

ob/, /92 RII:DRSS

~~fr" BMallett

' I 5'/92 RII:DRP

~

MBr o,.2- /92

~

b / ;-/92 RII~

RI[t1?P

~Fredrickson ¥-MSinkule IP I ~/92 6 / ~/92

~~y 6 / ':>(92

-

- ~ P..b\\T~ 1,/s-/~2..,.

- ~

-*

-JUNO 9 ~~