ML18102A305
| ML18102A305 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/13/1996 |
| From: | Garchow D Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18102A306 | List: |
| References | |
| LR-N96237, NUDOCS 9608200195 | |
| Download: ML18102A305 (2) | |
Text
PS~G*
- Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit AUG 13 1996 LR-N96237
- u. s. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
LER 272/96-014-00 SALEM GENERATING STATION -
UNIT 1 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 CORRECTED COPY This Licensee Event Report entitled "Pot~ntial Hydrogen.Embrittlement on 4KV Breaker Parts" is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50.73 (a) ( 2) ( i) (B).
Attachment SORC Mtg.96-106 DVH/tcp C
Distribution LER File 3.7 9608200195 960813 PDR ADOCK 05000272 S
PDR l11e paver is in )t1ur hanJs.
Sincerely, (1y r. J()m-~
David F. ~archow General Manager -
Salem Operations
- V1/
/', *\\7*
95*2168 REV. 6 '94
Document Control Desk LR-N96237 Attachment A The following represents the commitments that Public Service Electric & Gas (PSE&G) made to the Nuclear Regulatory Commission (NRC) relative to this LER (272/96-014-00 ).
The commitments are as follows:
- 1. Removed all NLI refurbished breakers, except 2B4D, from vital loads.
Breaker 2B4D will be removed when its loads are ~vailable to be transferred to another bus.
- 3. The circuit breakers will be removed for replacement and refurbishment.
This will be completed for each breaker prior to that breaker being required to be operable.
- 4. Further corrective actions will be taken as a result of the root cause evaluation currently being conducted.
Significant corrective actions that affect the discussion in this LER, if any, will be reported in a supplement to
.this LER.