ML20058G370

From kanterella
Jump to navigation Jump to search
Forward Draft Minutes,Including Transcript of 901010-11 Meeting in Reno,Nv
ML20058G370
Person / Time
Issue date: 11/01/1990
From: Hoyle J
NRC - LICENSING SUPPORT SYSTEM ADVISORY REVIEW PANEL (LSSAR
To: Cerny B
ENERGY, DEPT. OF
Shared Package
ML20058G373 List:
References
NACLSSAR, NUDOCS 9011130103
Download: ML20058G370 (5)


Text

_ - _ - - _..., - - -.

November 1, 1990 Ms. Barbara Cerny Office of Civilian Radioactive Waste Management U.S. Department of Energy Forrestal Building 1000 Independence Avenue Washingtori, D. 6 20585

Dear Ms. Cerny:

Enclosed for your information is a copy of the draft minutos, including the transcript, from the LSS Advisory Review Panel meeting held on October 10 and 11, 1990, in Reno, Nevada.

Also enclosed is a copy of my report to Mr. Lloyd Donnelly, the LSS Administrator, on the meeting.

Sincerely,

\\5\\

John C. Iloyle, Chairman LSS Advisory Review Panel

Enclosures:

As Stated DISTRIBUTION:

BRCJQ L3 j ee.t JHoyle MRood NN3

,)

<~

'k(

'/

+01113o103 co1101 c,

PDR ADVCM NACL: /R 4

p.

kb Jl 10/JI /90 11 t/90 A

DRAPT MINUTES LICENSING SUPPORT SYSTEM ADVISORY REVIEW PANEL MEETING October 10 and 11, 1990 The fourth meeting of the Licensing Support System Advisory Review Panel ( LSSARP) took place on October 10 and 11, 1990, in Reno, Nevada.

Mombors of the LSSARP present were John Hoyle, Chairman (NRC)

Barbara Corny (DOE)

Linda Deselle (DOE) - 10/10/90 only Jay Silborg (Nuclear Industry) - 10/10/90 only Chris Henkel (Nuclear Industry) - 10/10/90 only Malachy Murphy (State of Nevada)

Kirk Balcom (State of Nevada)

Dennis Bochtel (Clark County, Nevada)

Liza Vibert (Clark County, Nevada)

Lonard Smith (Lincoln County, Nevada)

Peter Cummings (City of Las Vegas, Nevada) - 10/10/90 only Elgie Holstein (Nye County, Nevada)

William Hooton (National Archivos and Records Administration) - 10/10/90 only Boyd Alexander (U.S. Patent and Trademarks Office)

Enclosed are:

Index to Mooting Transcript Moeting Transcript Meeting Agonda l

Eederal Reaister notice announcing meeting John Hoyle's letter to LSSARP members notifying them of meeting Attendance List The mooting was open and attended by members of the public.*

l This transcript has not been corrected or edited and it may contain l

inaccuracies.

1 John C. Hoyle, Chairman LSS Advisory Review Panel

  • Attendanco list is attached.

INDEX TO TRANSCRIPT OF LSS ADVISORY REVIEW PANEL OCTOBER 10 AND 11. 1990. MEETING Page Introduction of Members 4

Approval of Minutes of June 7, 1990, Meeting 7

LSS Implementation Schedule 9

SAIC Design Documentation 49 Capture System 54 Search and Image System 63 Communications System 92 Revised Topical Guidelines 140 Header Information 187 Abstracting of LSS' Documents 199 Handling of Technical Data 257 Planning for Future Activities 322 Discussion of Future. Meetings 343 t

i e

5 i

5

-n n

~~.


s

..,e v,

4 AGENDA LSS ADVISORY REVIEW PANEL HEETING OCTOBER 10-11, 1990 Etdnesday. October 10. 1990 8:30 Administrative Issues (J. Hoyle) 8:45 Status of LSS Development and Status of Repository Program (DOE) 9:45 Break 10:00 Science Applications International Corporation (SAIC) Design Documents (DOE /SAIC) 12:30 Lunch Break 2:00 Revisod Topical Guidelines (S. Treby, URC) 5:00 Adjourn ThursjAya_Qgtober 11. 1990 9:00 Continuation of June 7, 1990, Discussion of Header Working Group Recommendations (K. Balcom, Nevada)

- Copyee Requirements

- Abstracting

- Code for Technical Data /Non-Documents 12:00 Lunch Break 1:30 Handling of Technical Data (C. Acree and R.

Johnson, Center for Nuclear Waste Regulatory Analyses) 3:30 Break 3:45 Status of Compliance Evaluation Program and Status of Priority Document Production Schedule (F. X.

Cameron) 4:45 Future Agenda (J. Hoyle) 5:00 Adjourn

u)

,r e...,,...

"a W rederal Regist:r / W1. 55 No. '182 / Wednesd:y. September 19. 1990 / Notice's 38617,

................r..

l W

4 1

Dated at Rodville.hter>1and this 17th day 3 45 Statos of Coinphance helua. been made in the agenda for the l l:

iion preram and Status of October 1(00 ACRS and ACNW full g

of September uso..,, s,.. #

Prionty Document pmduttion Committee meetmgs can be obtained by t

For the Nuclear Regulatory Commisslor6 Schedule (NRC/lSSAL 6 prepaid telephone call to the Office of lierbert N.Berkow ' $.a e :.W.

the Lsecutive Dsrector of the i

..c.

I

.h.0l***

Grector. trvien Dorectomtr il-2. Daision ef Committers (telephone: 301/492-4000

' l:

Reoctor t'rnects-1/11. Offect o/ Nuclear

.i

,..:m,...

I*CO#d*EI 0' 3CUI492*IE00'L'30 a.m.I

a,:.

De meeti Ndl be open to the Acoctor Replation...,

Barbara jo WWe)betwm int Doc. gN:xic Died $46-pat t 45 aml public. Interested persons may make and 415 p m., Eastern Time.

t sumo cops tsweias
@ :. h,,.

oral presentations to the Panel or file written statements. Requests for oral ACRS Committes Meetings 4

.t ns

  • d' Adrencedpres'surlied water'recetors.

!h

' Licensing Support System Advisory'

~ {c[ a I

a f ar n Se{tember 20,1t00. Bethesda, MD. %eS p,9n

. Review Panet Meeting,.g 4 advance as practicable so that 1

  • 'JNotice is he'reby'g'hWpUsuant to the ; appropriate arrangements can be made for the % estinghouse RESAR SP-90

,tj,

' Federal Advisbry Committee Act of r % 10 allow the necessary time'd.uring the design.

October 6.1972 (Pob. L 14-403, Bo Stat, meeting for oral statements..

Advancedpressurised water tractors.

-l ; i 77(L776). that the Licensing Support

.. Por further information regarding this September 21.1090. Bethesda, MD. The rnatter, contact Marilee Rood. Office of

,M System Advisory Review Panel,J the ISS Administrator. U.S. Nuclear Subcommittee will meet with AAD

' October 10 and 11,1toch The rnceting ' '

Regula tory Commission. Washington, CombusUon Engineering. Inc., to discuss P

' (t.SSARP)will hold a meeting on : r will cons ene at 8.30 a.m. on October 10, DC 20553; telephorte 301-492-4003, design feedback for System 80 Plus from operational esperience at CE plants,in j

1100,in the Zephyr Room of the Quality D ted'ai Rochville. Ma,3 and. this 14th day particular Palo \\ erde,.,

1 of September 1m n...

y l'm,3h00 South Virginia Street, Reno, Nevada.The Nuc. lear Regulatory a...

For the Nuclear Eegulsiory'CoNmis'alon.

T/ont license renewol. October 2, 4

1990 Bethesda,MD.The Subcommittee l

'loba C.llo3 a,' m % L4 9 t'.

, will review the draft Regulatory Culde I

' Commission (NRC) established the $

1 f

LSSARP to provide advice and M )

  • AdrisoryCommIttchtdejernentOfice; on Standard Fornet and Content for recornmendations to the Nuclear -

lrR Doc. 9M2001 Illed 6-11L 07,8 45 am).

License Renewal Application and the Regulatory Commission and to the

' ""3 '* "9. c 4.. -, -,

draf t Standard Review Plan for the

-t :..

Department of Energy (DOE) on topics, Review of License Renewal

J l '#q

. issues, and activities related to the

.,,o%,.

e 4

design, development, and operation of Advisory Committee o'n Reacto, -

app!! cations. + c,".. r foint severe occidents, extreme

'M i

ry en electronic infonnation management '. Safeguards (ACRS)and Advisory v externo/phenomeno, ond probabilistic -

Committes on Nuclear Waste (ACNW);

4Q

< system known as the IJernsing Support' " Proposed Meetinge ~"?,oi 'cisA assessenent. October 3.1990, - - '

  • .4

. System (LSS). This system is beinS Bethesda, MD.The Subcommittee will

.^C*'"^

s* -

[

designed to contain Information relevant ~

W. d'e. to prcvide advance In or r continue their review of NUREG-1150,
  • to the Commission's firture licensing ' N..,:

, information regardmg propose public

" Severe Accident Risks: An Assesament d

  • / proceeding for a geologic repository for-: t. mretings of the ACRS Subcommittees

' for Five U.S. Nuclear Power Plants"in >

t the disposal of high level'radioacth e and meetings of the ACRS full

~ the areas of seismic and fire analysis.

L waste (l(LW). ti D e e e 4 *. I e. " 2

, h,,,6

  • * * %e scenda for the two day meeting ie ', Committee, and of the ACNW, the

' TVA plant licensink and restart.

  • following preliminary schedule is October 31,1990,iluntsville. A1.The ee follows: 1 i ' i la ei**: m a ns Feny Unu ' E """'d

. published to reflect the current situation, "1#*

11

h I

. i i

. Agenda,LSS Advisory Review Panel taking into account additional meetings restan

, Meeting, October 10 11,1990 which havebeen scheduled and O'#"8 b d'*# # E^'"O**""

,i

.t*

it!.e.

.t',.

meetings which have been postponed or N 5 ember 6,1990. Dethesda, MD.The cancelled since the last list of proposed Subcommittee will discuss the status of

[I i

Wednesday. October 10, Ipn Discussion of Administrative meetings published August ?.2,1990(55

. & NRC staEs p ram on interfaci systems loss of cgo ant, accidents l

IL30 Cha tt-FR 34359).Those meetings which are

., i,,.1g., Matters, (Committee

.,p Status of Dol's LSS Develop. ' defmitely scheduled have had, or willhave, an individual notice p foin/ containment systems and man). ' : C. ' A' *: ".-

(ISLOCA).

  • a

.i si

, e 45, inent Activity ei.d Schedule, the rederal Register approximately 15 structuralencineering. November 7.

c

.. and Status of LM Repost.

c'.ays (or more) prio.r to the' meeting. It is 1100, Bethesda, MD. ne Subcom,mittees

,+

h]

Doc mentauon' espected that sessions of ACRS full will discuss containment design criteria

'LSS e gn to,

Committee and ACNW meetings for future plants.

hg

,,,..,.>I-intemitional Corporatton).

. designed by an'esterisk (*)'will be 'open

/0 int odroncedpressurized water (DOE / Science

  • Apphcations g

t,

,9 Revised Topical Guidelines for or whole or in part to the public. ACRS reactors ond odranced boilies water 2

Determinir. What Informa-full Commitice and ACNW meetings tractors. Date 1 e be determined,

p{a

'. tion Coes ISS begin at 8.30 a:m. and ACRS i..

(October), Delh isda, MD. The (NRC)/ : ; 4 ;into, the ' Subcommittee meetings usually begin at Subcommittees will discuss the licensing i

C.J

, ;,,j

, Continuat,lon of lune,7,1990.

the agenda will be discuised during 110+ and CE JiDWR designs. ;,i '

f 8.30 a.m. The time when items listed on review basis (bcum'ents for CE System

    • +

0 Thursday. Oc tober 11.170-tl 9

3 - >

q,'

. Vticussion of Recommended ACRS full Commitee and ACNW

. Joint coni afers in nuc/corpowe'r "

JX ph. rnectings and when ACRS.,.'.

/

liade Craph ISS Recorsle (NRC).. Subcornmittee meetings will,slatt will be, plant o f'

j

\\'r*

equ e r,

I';*

published prior lo each meeting.

determin.d (October / November),

llandhog of Technical Date 6n

'130';'i the ISS INRC/ Center for Nu., Information as to whether a meeting has

' ' n 7 )' ' f. ~ ' clear. Weste!. Feplatory been firmly scheduled, cancelled, of Dethesh,!.{D. The Subcommittees will N

rescheduled, or whether changes hag e discuss the use of computers and solid-M

, Analyses). *. !,.

i' s

4 3;

?'

,