Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21035A236 + (Final Accident Sequence Precursor Analysis - D.C. Cook Nuclear Plant, Unit 2, Manual Reactor Trip and Automatic Safety Injection Due to Failed Open Pressurizer Spray Valve (LER 316-2020-003) - Precursor)
- ML051580507 + (Final Accident Sequence Precursor Analysis of September 1, 2003, and May 21, 2004, Operational Events)
- ML20050R568 + (Final Accident Sequence Precursor Analysis-Brunswick Unit 1, Degraded Principal Barrier, Technical Specification Shutdown, and Automatic System Actuation (LER 325-2019-002)-Training/Reject)
- ML19050A510 + (Final Accident Sequence Precursor Analysis - Clinton Power Station, Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram (LER 461-2017-010) - Precursor)
- ML050420021 + (Final Accident Sequence Precursor Analysis of February 2002 Operational Condition)
- ML040820654 + (Final Accident Sequence Precursor Analysis of August 2001 Operational Condition)
- ML18038B063 + (Final Accident Sequence Precursor Analysis - Turkey Point Nuclear Generating Station (Unit 3), Loss of 3A 4kV Vital Bus Results in Reactor Trip, Safety System Actuations, and Loss of Safety Injection Function (LER 250-2017-001) - Precursor)
- ML060660379 + (Final Accident Sequence Precursor Analysis Report Regarding Electric Grid Event on August 14, 2003)
- ML18037B043 + (Final Accident Sequence Precursor Analysis Oconee Nuclear Station, Loss of Both Keowee Hydroelectric Units Due to Human Error(Ler 296-2017-001)- Reject))
- ML033650050 + (Final Accident Sequence Precursor Analysis of November 2001 Operational Condition)
- EPID:L-2019-PMP-0067 + (Final Accident Sequence Precursor Analysis - River Bend Station, Division '1' Standby Diesel Generator Speed Sensor Power Supply Failure (LER 458-2022-003) - Precursor)
- ML19046A034 + (Final Accident Sequence Precursor Analysis - River Bend Station, Potential Loss of Safety Function and Condition Prohibited by TS Due to EDG Lube Oil Chiller Leak Caused by Design Deficiency (LER-458-2018-006) - Reject)
- ML15107A154 + (Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power)
- ML19198A335 + (Final Accident Sequence Precursor Analysis-Grand Gulf, Reactor Manual Scram Due to Main Steam Bypass Stop and Control Valve Drifting Open (LER 416-2018-010-01)- Reject)
- ML032400216 + (Final Accident Sequence Precursor Analysis of August 2000 Operational Event)
- ML032960170 + (Final Accident Sequence Precursor Analysis of August 2000 Operational Event)
- ML032890162 + (Final Accident Sequence Precursor Analysis of December 2001 Operational Event)
- ML18130A649 + (Final Accident Sequence Precursor Analysis - Oyster Creek Nuclear Generating Station, Failure of Emergency Diesel Generator During Surveillance Testing Due to a Broken Electrical Connector (LER 219-2017-005) - Precursor)
- ML063200384 + (Final Accident Sequence Precursor Analysis of April 2003 Operational Event, LER 416/03-002 - Letter to Licensee W/Copy of Final ASP Analysis)
- ML18352B099 + (Final Accident Sequence Precursor Analysis - Peach Bottom Atomic Power Station (Unit 3), Reactor Core Isolation Cooling System Pressure Switch Failure Results in Condition Prohibited by Technical Specifications (LER 278-2018-001) - Precurso)
- ML041490077 + (Final Accident Sequence Precursor Analysis of February 2001 Operational Condition)
- ML21029A319 + (Final Accident Sequence Precursor Analysis - Quad Cities Nuclear Power Station, Unit 2, Electromatic Relief Valve 3D Failed to Actuate Due to Out-of-Specification Plunger (LER 265-2020-002) - Precursor)
- ML063180302 + (Final Accident Sequence Precursor Analysis)
- ML13045A124 + (Final Accident Sequence Precursor Analysis Results)
- ML052850263 + (Final Accident Sequence Precursor Analysis of 06/14/04 Operational Event)
- ML051430398 + (Final Accident Sequence Precursor Analysis of 2003 Operational Event)
- ML092860281 + (Final Accident Sequence Precursor Analysis of January 15, 2008 Event)
- ML22178A243 + (Final Accident Sequence Precursor Report on Emergency Diesel Generator Failure)
- ML26028A182 + (Final Action - Sequoyah Licensed Operator FFD EAI-RII-2026-0003)
- ML16183A044 + (Final Action Report/Improvement Plan, Exercise Date - May 17, 2016, Radiological Emergency Preparedness (REP) Program)
- ML19308B287 + (Final Addendum to Fes Re Operation of Facility)
- ML060880320 + (Final Administered Administrative Jpms for the D.C. Cook Initial Examination - February 2006)
- ML060880326 + (Final Administered Control Room Jpms for the D.C. Cook Initial Examination - February 2006)
- ML060880333 + (Final Administered In-Plant Jpms for the D.C. Cook Initial Examination - February 2006)
- ML060880342 + (Final Administered Scenarios for the D.C. Cook Initial Examination - February 2006)
- ML11159A039 + (Final After Action Report / Improvement Plan for the November 17, 2010, Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for the Quad Cities Station)
- ML13028A175 + (Final After Action Report Improvement Plan (Aar/Ip) for August 21, 2012, Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise & September 6, 2012, Medical Services (MS-1) Drill for Fermi 2 Nuclear)
- ML18045A136 + (Final After Action Report for Radiological Emergency Preparedness Exercise Conducted on August 8, 2017)
- ML17305A059 + (Final After Action Report for Radiological Emergency Preparedness Exercise of July 11, 2017)
- ML19058A235 + (Final After Action Report for the August 14, 2018, Oconee Nuclear Station Plume Exposure Pathway Exercise)
- ML18045A135 + (Final After Action Report for the August 8, 2017, McGuire Nuclear Station Full Participation Exercise)
- ML18045A099 + (Final After Action Report for the August 8, 2017, McGuire Nuclear Station Full Participation Exercise)
- ML18065A198 + (Final After Action Report for the Limerick Generating Station Radiological Emergency Preparedness Plume Exercise Held on November 14th, 2017)
- ML18304A338 + (Final After Action Report for the North Anna Power Station Radiological Emergency Preparedness Plume Exercise)
- ML16103A500 + (Final After Action Report, Exercise Date October 21, 2015, Radiological Emergency Preparedness Program)
- ML16042A417 + (Final After Action Report, Exercise Date September 22, 2015, Radiological Emergency Preparedness Program)
- ML17053A456 + (Final After Action Report, Exercise Date: November 16, 2016, Radiological Emergency Preparedness Program)
- ML17079A214 + (Final After Action Report, Radiological Emergency Preparedness Exercise, Exercise Date: December 13, 2016)
- ML16333A008 + (Final After Action Report, Radiological Emergency Preparedness Exercise, Exercise Date: May 11, 2016)
- ML17313A476 + (Final After Action Report, Radiological Emergency Preparedness Exercise)
- ML16363A280 + (Final After Action Report, Radiological Emergency Preparedness Exercise - Exercise Date: September 14, 2016)