NRC2006 SIM01 NUMBER NRC2006-SIM01 REVISION: 0 AND TITLE:
Perform Emergency Boration During ATWS (ALT)
TRAINING INITIAL LICENSED OPERATOR TIME: 8 Minutes PROGRAM : (ILT)
SCOPE OF New Issue REVISION:
DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 7
NRC2006-SIM01 REFERENCES
- 1. Task Number: EOP0870501
- 2. K/A Number: APE 024 A1.17 {3.9/3.9}
SYS 004 A2.14 {3.8/3.9}
- 3. Procedures:
02-OHP-4023-FR-S.1, Rev 10 Response to Nuclear Power Generation/ATWS EVALUATION SETTINGS1
- 1. Unit 2 Simulator HANDOUTS
- 1. Copy of 02-OHP 4023.FR-S.1 procedure ATTACHMENTS
- 1. NONE SIMULATOR SETUP2
- 2. Insert MALF RP03A and RP03B, Fail Reactor Trip Breakers CLOSED
- 3. Insert MALF RP10A and RP10B; Fail AUTO SI actuation
- 4. Manually trip the Main Turbine
- 5. Perform Steps 1 - 4 of 02 OHP 4023-FR-S.1 and place rod control in MANUAL
- 6. Insert Override - ZGI43BAP4S to SLOW (Maintains #4 BAP speed in SLOW)
- 7. Insert Override - ZGIRU20 to IN (Maintains continuos rod motion in MANUAL)
- 8. Insert Malf - 101BAP3 (Failure of the #3 BAP)
TASK OBJECTIVES/STANDARDS3
- 1. Operator has established Emergency Boration to the RCS.
1 Evaluation settings are listed in the preferred order.
2 Simulator setup can be stored in a temporary IC to expedite the evaluation process.
3 These standards should not exceed those used in ILT.
Page 2 of 7
NRC2006-SIM01 EVALUATOR INSTRUCTIONS
- 1. Ensure simulator setup is complete
- 2. Brief the operator (May be performed by giving out Task Briefing Sheet)
- 3. Announce start of the JPM
- 4. Perform evolution
- 5. At completion of evolution, announce This JPM is Complete.
- 6. Document evaluation performance.
TASK BRIEFING INITIAL CONDITIONS You are the Reactor Operator. The crew has entered 02-OHP 4023.FR-S.1, Response to Power Generation/ATWS, due to a failure of the reactor to automatically or manually trip. The Balance Of Plant Operator is monitoring Rod Insertion.
INITIATING CUE The Unit Supervisor directs you to initiate Emergency Boration to the RCS in accordance with Step 5 of 02-OHP 4023.FR-S.1.
Page 3 of 7
NRC2006-SIM01 Operator verifies ONE CCP is running Operator attempts to start BOTH BAPs in Fast Speed NOTE: #3 BAP will Not Start, #4 BAP Remains in SLOW Speed.
NOTE: AUTO SI did NOT actuate. Manual SI was NOT performed.
Operator implements RNO action with SI NOT Actuated CT: Operator Opens at least ONE CCP suction from RWST valve (See next Page)
{CT} Critical Step Page 4 of 7
NRC2006-SIM01 CT: Operator OPENs RWST isolation valves 2-IMO-910 and/or 2-IMO-911 CT: Operator CLOSEs CCP suction valves 2-QMO-451 and/or 2-QMO-452 CT: Operator raises charging flow by adjusting QRV-251 and/or QRV-200 to obtain at least 170 gpm charging flow.
Operator verifies normal letdown flow in progress. (Letdown Flow > 75 gpm)
Page 5 of 7
NRC2006-SIM01 Operator verifies PZR pressure is less than 2335 psig.
THIS JPM is COMPLETE:
CT: Critical Step Page 6 of 7
NRC2006-SIM01 TASK BRIEFING You are the Reactor Operator. The crew has entered 02-OHP 4023.FR-S.1, Response to Power Generation/ATWS, due to a failure of the reactor to automatically or manually trip. The Balance Of Plant Operator is monitoring Rod Insertion.
The Unit Supervisor directs you to initiate Emergency Boration to the RCS in accordance with Step 5 of 02-OHP 4023.FR-S.1.
Page 7 of 7
NRC2006 SIM02 TITLE Raise SI Accumulator Level REVISION 0 PROGRAM Initial Licensed Operator (ILT) TIME 15 Minutes DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 13
TITLE: NRC2006-SIM02 REVISION: 0 Raise SI Accumulator Level REFERENCES 02-OHP-4021-008-004, Rev 15 Adjusting the Level of an Accumulator 02-OHP-4021-008-007, Rev 4 Operation of the Safety Injection Pumps 02-OHL-4030-SOM-041, Rev 11 Unit 2 Tours - U2 CR M1&2 SHIFT CHKS TASKS Task Number: 0080240101 Increase Accumulator level in MODES 1, 2, or 3 K/A Number: SYS 006 A1.13 Ability to predict and/or monitor changes in parameters associated with Accumulator pressure, level, or boron concentration.
K/A Value: RO - 3.5 SRO - 3.7 EVALUATION SETTINGS1 Unit 2 Simulator HANDOUTS Copy of Attachment 3 to 02-OHP 4021.008.004 Copy of 02-OHP 4021.008.007 Copy of 02-OHL-4030-SOM-041 ATTACHMENTS CAUTION TAG for the West RHR Pump SIMULATOR SETUP2
- 1. Initialize at any Power IC 980
- 2. Drain Accumulator No. 1 until ~935 ft³
- 3. Restore drain lineup to normal and FREEZE the simulator 1
Page 2 of 13
TITLE: NRC2006-SIM02 REVISION: 0 Raise SI Accumulator Level TASK OBJECTIVES/STANDARDS3 Accumulator No. 1 Low Level Alarm is CLEAR and water level has been restored to within Tech Spec Limits {927.5 ft³ to 965 ft³}
TASK BRIEFING You are an extra operator.
A low-level condition has been identified on the Unit 2 No. 1 Accumulator. It has been verified that NO personnel are in Containment.
The Unit Supervisor directs you to raise the No. 1 Accumulator level to 945 ft³ using the South SI pump, in accordance with Attachment 3 of 02-OHP 4021.008.004.
The Starting Team is standing by to start the South SI pump in accordance with 02-OHP-4021-008-007 and to assist with Local Operations.
Page 3 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level NOTE: Prerequisites has been verified as met.
Page 4 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level Operator checks the #21 Accumulator box.
Operator verifies RCS pressure is greater than 1700 psig.
Page 5 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level Operator verifies valve 2-ICM-265 is OPEN (NOTE: Accumulator pressure regulation should NOT be required.)
Operator should mark step 4.4 as N/A with initial and date.
CUE: (If asked) Accumulator pressure control is NOT required at this time.
Page 6 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level Operator reports to US that West RHR pump is INOPERABLE.
CUE: US acknowledges declaration that the West RHR pump is INOPERABLE.
CT: Operator places West RHR pump CS in LOCKOUT CUE: Independent verification has been performed satisfactory Operator places a Caution tag on the West RHR pump CS.
CUE: Use the prepared Caution Tag on the West RHR pump control switch.
CT: Operator OPENs valves: 2-IMO-314 and 2-IMO-324 CUE: Independent verification has been performed satisfactory Page 7 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level CUE: (If Asked) US acknowledge entry into LCO 3.5.2 Condition D CT: Operator CLOSEs valve: 2-IMO-270 OR 2-IMO-275 CUE: Independent verification has been performed satisfactory CUE: STA will enter time and date of Tech Spec entry.
Operator reports that South SI pump is INOPERABLE CUE: US acknowledges South SI pump is INOPERABLE.
Operator directs AEO to CLOSE valve 2-SI-111S.
CUE: AEO reports valve 2-SI-111S is CLOSED.
Operator directs AEO to OPEN valve 2-SI-112S CUE: AEO reports valve 2-SI-112S is OPEN.
NOTE: Provide a copy of 02-OHP 4021.008.007 to operator.
CUE: Local operator actions have been completed and verified.
Page 8 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level CT: Operator starts the South SI pump CUE: AEO has verified recirculation flow of 55 gpm within 5 seconds of start.
CUE: AEO reports that all local indications are SAT for pump operation.
{Vibration is lower than TDB 15.2 limits; lube oil pressure is > 10 psig}
CUE: AEO reports local temperatures are NORMAL and NO excessive hot spots exist.
Operator returns to procedure in effect for raising Accumulator Level at Step 4.7.
Page 9 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level Operator directs AEO to slowly OPEN valve 2-SI-111S.
CUE: AEO reports valve 2-SI-111S is OPEN.
Operator directs AEO to CLOSE valve 2-SI-112S CUE: AEO reports valve 2-SI-112S is CLOSED.
CT: Operator directs AEO to OPEN valve 2-IRV-60.
(NOTE: When the Aux Tour AEO is directed to OPEN 2-IRV-60, then BOOTH Operator must enter MRF SIR01 to OPEN)
CUE: AEO reports 2-IRV-60 is OPEN CUE: STA will enter time and date of Tech Spec entry.
CUE: US directs you to fill the No. 1 Accumulator to 945 ft³ CT: Operator OPENS valve: 2-IRV-111 Page 10 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level CT: Operator should CLOSE valve: 2-IRV-111
{Accumulator No. 1 has reached 945 ft³ [+ 5]
Page 11 of 13
TITLE NRC2006 SIM02 REVISION 0 Raise SI Accumulator Level CUE: Independent verification has been performed satisfactory Operator directs the AEO to CLOSE valve 2-IRV-60 (NOTE: When the Aux Tour AEO is directed to CLOSE 2-IRV-60, then BOOTH Operator must enter MRF SIR01 to CLOSE)
CUE: AEO reports valve 2-IRV-60 is CLOSED and Independent verification has been performed satisfactory CUE: STA will enter the time and date for exiting Tech Spec.
THIS JPM IS COMPLETE.
Page 12 of 13
TASK BRIEFING You are an extra operator.
A low-level condition has been identified on the Unit 2 No. 1 Accumulator. It has been verified that NO personnel are in Containment.
The Unit Supervisor directs you to raise the No. 1 Accumulator level to 945 ft³ using the South SI pump, in accordance with Attachment 3 of 02-OHP 4021.008.004.
The Starting Team is standing by to start the South SI pump in accordance with 02-OHP-4021-008-007 and to assist with Local Operations.
NRC2006-SIM02.doc Page 13 of 13
NRC2006-Sim03 TITLE Maximize Containment Cooling REVISION 0 PROGRAM Initial Licensed Operator (ILT) TIME 12 Minutes SCOPE OF REVISION: New Issue DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 3 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling References 02-OHP-4021-028-001, Rev. 10 Containment Ventilation Tasks Task: 0280560101 Operate Lower Containment Ventilation 0280570101 Operate Upper Containment Ventilation K/A CROSS
REFERENCE:
022 A4.01 Ability to manually operate and/or monitor in the control room CCS fans.
K/A IMPORTANCE: RO 3.6 SRO 3.6 Evaluation Setting Simulator Handouts Task Briefing Copy of 02-OHP-4021-028-001 Attachments None Simulator Setup
- 1. Initialize the Simulator to full power IC 982 (IC28)
- 2. Verify Containment Ventilation Alignment as follows:
Upper vent fans Lower vent fans (A) Lower vent fans (B)
- 2-HV-CUV OFF
- 2-HV-CLV-1A - ON
- 2-HV-CLV-1B - ON
- 2-HV-CUV ON
- 2-HV-CLV-2A - OFF
- 2-HV-CLV-2B - OFF
- 2-HV-CUV ON
- 2-HV-CLV-3A - ON
- 2-HV-CLV-3B - ON
- 2-HV-CUV ON
- 2-HV-CLV-4A - ON
- 2-HV-CLV-4B - ON
- 3. Close 2-WCR-920/922 NESW to HV-CUV-1
- 4. Close 2-WCR-904/906 NESW to HV-CLV-2A Page 2 of 3 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling Task Objectives/Standards Aligns NESW and Starts all 8 Lower Containment Ventilation Fans and all 4 Upper Containment Ventilation Fans IAW 02-OHP-4021-028-001, Containment Ventilation, while observing all applicable precautions and limitations and procedural steps.
Task Briefing Your are the Extra RO. Unit 2 is in MODE 3.
The Unit Supervisor directs you to maximize Containment Cooling by aligning ALL required NESW supply/return valves and starting ALL idle Upper and Lower Containment Ventilation Fans in accordance with 02-OHP-4021-028-001, Containment Ventilation All procedural precautions and limitations have been verified as met. A Pre-Job Brief has been performed.
Page 3 of 3 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling NOTE: Provide candidate a working copy of 02-OHP-4021-028-001, Containment Ventilation.
CUE: If asked, all procedural precautions and limitations have been verified as met. A Pre-Job Brief has been performed.
CT: Opens 2-WCR-920/922 CT: Places Switch in the Fan 1 and 4 Position Verifies Switch in the Fan 2 and 3 Position This Step is N/A per direction Page 1 of 5 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling CUE: IF requested, the AEO at the CAS Panel reports:
- Cooler controls in AUTO and maintaining temperature
- Heater controls in AUTO and maintaining temperature This Step is N/A Page 2 of 5 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling This Step is N/A This Step is N/A Page 3 of 5 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling Verifies Switch in the Fan 1A & 3A Position Verifies Switch in the Fan 1B & 3B Position CT: Places Switch in the Fan 2A & 4A Position CT: Places Switch in the Fan 2B & 4B Position Page 4 of 5 Revision 0
COURSE NUMBER NRC2006-Sim03 REVISION: 0 AND TITLE:
Maximize Containment Cooling CT: Opens 2-WCR-904/906 Operator reports completion of Containment Cooling lineup This Step is N/A THIS JPM IS COMPLETE Page 5 of 5 Revision 0
NRC2006-Sim03 Task Briefing Your are the Extra RO. Unit 2 is in MODE 3.
The Unit Supervisor directs you to maximize Containment Cooling by aligning ALL required NESW supply/return valves and starting ALL idle Upper and Lower Containment Ventilation Fans in accordance with 02-OHP-4021-028-001, Containment Ventilation All procedural precautions and limitations have been verified as met. A Pre-Job Brief has been performed.
NRC2006-SIM03.doc Page 1 of 1 Revision 0
NRC2006 SIM04 TITLE Re-energize RCP Bus from Reserve Feed REVISION 0 PROGRAM Initial Licensed Operator (ILT) TIME 20 Minutes SCOPE OF REVISION: New Issue DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 3
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed REFERENCES 02-OHP-4023-SUP-002, Rev. 6 Restoration of Reserve Power to 4KV Buses Tasks Task: EOP0390501 Restore Offsite Power to all AC buses using SUP 002.
K/A CROSS
REFERENCE:
062 A4.07 K/A IMPORTANCE: RO 3.1 SRO 3.1 Evaluation Setting Simulator Handouts Task Briefing Copy of 02-OHP-4023-SUP-002, Attachment A SIMULATOR SETUP Reset to Shutdown IC982 (IC28)
Simulator Setup:
- Perform a manual reactor trip then insert Malfunction:
ED03A & ED03B to de-energized the 2A, 2B, 2C, and 2D buses.
- Perform actions of E-0 and ES-0.1 through Step 8.
- Delete Malfunctions ED03A & ED03B
- Reset TR201AB and TR201CD 86 Relays
- MRF EDR034 to TRIP then to RESET to restore Lighting
- MRF EDR047 to TRIP then to RESET to restore Transformer Oil & Fan Cooling
- MRF EDR048 to TRIP then to RESET to restore Transformer Oil & Fan Cooling
- Perform SUP002 Att. B to restore power to 2C and 2D buses.
Page 2 of 3
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Task Objectives/Standards Re-energize RCP buses 2A & 2B from Reserve Feed in accordance with Attachment A of 02-OHP-4023-SUP-002, Restoration of Reserve Power to 4KV Buses Task Briefing You are the Extra RO The unit is recovering from a loss of Offsite Power with RCP Buses 2A and 2B still de-energized.
The Unit Supervisor directs you to re-energize RCP buses 2A & 2B from Reserve Feed in accordance with Attachment A of 02-OHP-4023-SUP-002, Restoration of Reserve Power to 4KV Buses The Shift Manager has received word from Fort Wayne that the Reserve Transformers TR4 and TR5 are energized and available.
Page 3 of 3
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed
{CT: Critical Task}
Operator Verifies 34.5 KV Bus #1 is energized Operator Verifies Panel 219 Drop 93 is NOT lit CT: Operator Verifies 2A5 & 2B5 breakers are OPEN with GREEN targets.
Operator verifies UNIT 1 breakers 1A5 & 1B5 are OPEN with a GREEN target.
CUE: Unit 1 has verified 1A5 & 1B5, Reserve Feed Supply to Buses 1A and 1B are OPEN with a GREEN Target.
CUE: Ft. Wayne Operations Center has given approval to close CB 12AB.
Operator verifies UNIT 1 breaker 12AB is CLOSED with a RED target.
CUE: Unit 1 has placed breaker 12AB in CLOSE and verified a RED target.
Page 4 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed CT: Operator Places CB 12AB to CLOSE.
CUE: (If asked) US acknowledges closing 12AB and plant announcement has been made.
Operator Verifies TR201AB is Energized on All Phases Operator Informs U1 that 12AB, U1 & U2 Reserve Power CB is Closed CUE: Acknowledge CB 12AB is closed Operator Verifies that Panel 219 Drops 71 & 91 are NOT LIT.
Page 5 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator Verifies that Panel 219 Drops 72 and 92 are NOT LIT.
CT: Operator Verifies breakers are OPEN with a GREEN target for Bus 2A & 2B equipment (NOTE: Place breakers to Trip to ensure GREEN Target)
{NOTE: When operator attempts to verify RCP 1 & 4 breakers OPEN with GREEN target, then}
CUE: The RO has verified RCP 1 & 4 are Open with a Green Target.
Page 6 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed CT: Operator Verifies breakers OPEN for Bus 2A & 2B equipment (NOTE: Ensure switches are taken to TRIP then placed in Neutral)
{NOTE: When the operator attempts to verify CW pumps tripped, then}
CUE: The BOP Operator has verified CW Pumps #22 & #23 are TRIPPED and Control Switches are in TRIP CT: Panel G Switch #2-3 is placed in OPEN.
CT: Panel G Switch #2-4 is placed in OPEN.
CT: Panel G Switch #5-3 is placed in OPEN.
CT: Panel G Switch #5-4 is placed in OPEN.
Page 7 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed CT: Operator places 2A5 Synch selector to MANUAL Operator verifies aux buses run volts on Reserve Feed Voltage Indicator CT: Operator places 2A5 Control switch in CLOSE Operator verifies WHITE light LIT for Synch Permissives Met.
Operator announces closing 2A5.
CUE: US Acknowledges closing 2A5 and plant announcement has been made CT: Operator places Synch Master switch to CLOSE Page 8 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator verifies 2A5 is closed Page 9 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator verifies all phases of Bus 2A are energized.
Operator places 2A5 Synch selector switch to OFF CUE: (If asked) US acknowledges 2A Bus energized.
CT: Operator places 2B5 Synch selector to MANUAL Operator verifies aux buses run volts on Reserve Feed Voltage indication.
CT: Operator places 2B5 Control switch in CLOSE Page 10 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator verifies SYNCH Permissives white light LIT Operator announces closing 2B5.
CUE: US Acknowledges closing 2B5 and plant announcement has been made CT: Operator places Synch Master switch to CLOSE Page 11 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator verifies 2B5 is closed Page 12 of 13 Revision 0
COURSE NUMBER NRC2006-SIM04 REVISION: 0 AND TITLE:
Re-energize RCP Bus from Reserve Feed Operator verifies all phases of Bus 2B are energized.
Operator places 2B5 Synch selector switch to OFF Operator places knife switches on Panel G in CLOSE CT: Panel G Switch #2-3 is placed in CLOSE.
CT: Panel G Switch #2-4 is placed in CLOSE.
CT: Panel G Switch #5-3 is placed in CLOSE.
CT: Panel G Switch #5-4 is placed in CLOSE.
Operator reports completion of SUP-002.
THIS JPM IS COMPLETE Page 13 of 13 Revision 0
NRC2006-SIM04 Task Briefing You are the Extra RO The unit is recovering from a loss of Offsite Power with RCP Buses 2A and 2B still de-energized.
The Unit Supervisor directs you to re-energize RCP buses 2A & 2B from Reserve Feed in accordance with Attachment A of 02-OHP-4023-SUP-002, Restoration of Reserve Power to 4KV Buses The Shift Manager has received word from Fort Wayne that the Reserve Transformers TR4 and TR5 are energized and available.
NRC2006-SIM04.doc Page 1 of 1
NRC2006 SIM05 TITLE Unit 2 CR Ventilation aligned for Unit 1 SI (ALT) REVISION 0 PROGRAM Initial Licensed Operator (ILT) TIME 15 Minutes SCOPE OF REVISION: New Issue (NRC2002-SIM)
DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 3 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
References 02-OHP-4021-028-014, Rev. 18 Operation of Control Room AC and Pressurization/Cleanup/Filter System 02-OHP-4024-201, Rev. 13 Annunciator #201 Response Plant Fire System Tasks Task: EOP0230501 Verify proper equipment response following Safety Injection actuation.
0660560801 Respond to CR Pressurization Charcoal Filter fire K/A CROSS
REFERENCE:
APE 067AA1.05 Ability to operate and/or monitor the following as they apply to the Plant Fire on site for control room ventilation system 2.1.20 Ability to execute procedure steps K/A IMPORTANCE: RO 3.0 SRO 3.1 RO 4.3 SRO 4.2 Evaluation Setting Simulator Handouts Task Briefing Copy of 02-OHP-4021-028-014, Attachment 14 Copy of 02-OHP-4024-201 Drops 41 & 59 (Wait until Alarms are Lit)
Page 2 of 3 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
Simulator Setup Initialize at full power IC 980 (IC 28)
Silence the Fire Protection Siren by overiding the Fire Siren Test PB ZGISIRENTEST to BLANK Assign Event trigger file ECRCleanupdmpr2partialopen to Trigger 3 Verify/Assign Overides to trigger 3 IOV AN01(059) Crywolf and IOV AN01(041) Crywolf.
NOTE: Booth Operator should verify that after the operator partially opens a CR Pressurization Cleanup Intake damper (either 2-HV-ACR-DA-2 or 2A) the trigger initiates overrides for annunciator panel 201 drop 59 & 41, IOV AN01(059) Crywolf and IOV AN01(041) Crywolf.
These Alarms may be triggered with a 30 second delay from the Pressurization Fan start using:
Assign Event trigger file ECRCleanupdmpr2partialopen to Trigger 3 ECRCleanupdmpr2partialopen file contains:
ZLO101ACRDA2[3] == -1 ll ZLO101ACRDA2A[3] == -1 Task Objectives/Standards Align the Unit 2 CR AC and Pressurization system for a Unit 1 SI signal, observing procedure steps and precautions and limitations of 02-OHP-4021-028-014.
In addition, due to a subsequent fire condition in the charcoal bed, the operator should respond and mitigate the conditions by implementing the actions of the Alarm Response Procedure, 02-OHP-4024-201, Drop 59.
Task Briefing You are the Extra RO A Safety Injection (SI) has occurred on Unit 1.
The US directs you to verify that the Unit 2 Control Room Ventilation system is aligned for the Unit 1 SI signal by performing Attachment 14 of 02-OHP-4021-028-014.
Page 3 of 3 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
Evaulator Information NOTE: the Unit 1 SI signal did not result in the expected realignment of the Unit 2 CR AC and Pressurization system.
The Operator will place all Unit 2 equipment in the required condition.
Shortly after the intake dampers are manually opened, a fire occurs in the control room pressurization charcoal filter bed.
CT: Operator starts only 1 pressurization fan CT: Operator closes both intake dampers.
CT: Operator selects 1 damper to partial open Note: The other damper remains closed NOTE: Trigger 3 initiates override for annunciator panel 201 drop 59 and 41 IOR AN01(059) ON and IOR AN01(041) ON Page 1 of 5 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
The Operator Identifies that the fire alarms have annunciated.
CUE: The US directs you to respond to the fire Alarms.
NOTE: Supply the Operator with the Annunciator Response pages for Drops 41 & 59.
These Steps may be NA Operator verifies damper open Operator verifies hatch closed by Panel 201 Drop 69 alarm clear OR simulates verifying hatch closed in back of Control Room Page 2 of 5 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
Operator reviews probable causes Operator reviews automatic actions
{NOTE: 12-ZMO-10 and 12-ZMO-20 do NOT open}
Operator may OPEN these valves at this time.
Page 3 of 5 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
Operator directs AEO to 650 of Aux Building Operator directs another AEO to CR Ventilation Equipment Room CUE: AEO reports that the amber PREALARM and red SYSTEM OPERATING lamps are lit CT: Operator directs AEOs to open 2-FP-283, 2-DR-174, and 2-DR-198 CUE: AEO reports that smoke is observed in the CR ventilation filter housing.
CT: Operator places both CR pressurization fans in stop CT: Operator opens 12-ZMO-10 (20) with control switch (or verify Open)
Operator directs AEO to verify 2-ZRV-24 opens CUE: AEOs report that 2-ZRV-24 is open and the filter housing is draining properly.
Page 4 of 5 Revision 0
COURSE NUMBER NRC2006-SIM05 REVISION: 0 AND TITLE:
Unit 2 CR Ventilation aligned for Unit 1 SI (ALT)
[NOTE: Simulate sounding Fire Alarm and PA announcement}
Operator sounds the Fire Siren by depressing Emergency Fire System Test P/B CUE: If Emergency Fire System Test P/B is pressed, A Chirping Siren is Heard.
CUE: If Fire Siren Enable is placed to Enable, No Alarm Sounds are heard.
Operator notifies the fire brigade by calling ext. 1411.
CUE: Fire Brigade has been notified.
Operator simulates PA announcement CUE: SRO / Fire Brigade reports the fire is out THIS JPM IS COMPLETE.
Page 5 of 5 Revision 0
NRC2006-SIM05 Task Briefing You are the Extra RO A Safety Injection (SI) has occurred on Unit 1.
The US directs you to verify that the Unit 2 Control Room Ventilation system is aligned for the Unit 1 SI signal by performing Attachment 14 of 02-OHP-4021-028-014.
NRC2006-SIM05.doc Page 1 of 1 Revision 0
NRC2006 SIM06 TITLE Perform Turbine Driven AFW Pump Trip & Throttle REVISION 0 Valve Operability Surveillance PROGRAM Initial Licensed Operator (ILT) TIME 20 Minutes SCOPE OF REVISION: New Issue DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 3 Revision 0
COURSE NUMBER NRC2006-SIM06 Perform Turbine Driven AFW Pump Trip & Throttle REVISION: 0 AND TITLE:
Valve Operability Surveillance References 02-OHP-4030-STP-017TV,Rev 10, Turbine Driven AFW Pump Trip & Throttle Valve Operability Test Task: 0560190201: Perform Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance K/A CROSS
REFERENCE:
SYS 061 K4.07 Knowledge of AFW design features and/or interlocks which provide for Turbine Trip, including overspeed.
2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.
K/A IMPORTANCE: RO 3.1 SRO 3.3 RO 3.9 SRO 4.0 Evaluation Setting Simulator Handouts Task Briefing Copy of 02-OHP-4030-STP-017TV Stop Watch with Calibration Sticker Attachments None Simulator Setup Initialize at full power IC 980 (IC28)
Verify prerequisites of controlling procedure are met.
Simulator Booth Operator Action:
MRF FWR037 to 100% - to OPEN 2-FRV-256 MRV FWR037 to 0% - to CLOSE 2-FRV-256 Page 2 of 3 Revision 0
COURSE NUMBER NRC2006-SIM06 Perform Turbine Driven AFW Pump Trip & Throttle REVISION: 0 AND TITLE:
Valve Operability Surveillance Task Objectives/Standards Performs TDAFW Trip & Throttle Valve Surveillance, observing all applicable precautions and limitations and procedure steps.
Task Briefing Your are the Extra RO The US directs you to Perform 02-OHP-4030-STP-017TV, Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance.
The TDAFP has been declared inoperable and LCO 3.7.5 has been entered for this Surveillance. An AEO has been briefed. The AEO has verified the TDAFP is ready for Start and is standing by.
There is No Identified Primary to Secondary leakage.
Page 3 of 3 Revision 0
COURSE NUMBER NRC2006-SIM06 REVISION: 0 AND TITLE: Perform Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance NOTE: Provide an annotated copy of 02-OHP-4030-STP-017TV.
CUE: (If Asked) Both the East & West AFW pumps are operable and the US has Entered LCO 3.7.5 for the TDAFW CUE: Chemistry Lab has been notified of the TDAFP run CUE: (If Asked) The Starting team is ready for the TDAFP start.
Operator verifies that Panel 213 Drop 50 & Panel 214 Drop 10 are NOT LIT CT: Operator Holds CS in CLOSE and verifies CLOSED for:
2-FMO-211 Annunciator Panel 213 Drop 29 is LIT 2-FMO-221 Annunciator Panel 213 Drop 39 is LIT Alarms 2-FMO-231 Annunciator Panel 214 Drop 19 is LIT NOT 2-FMO-241 Annunciator Panel 214 Drop 29 is LIT Critical Operator Verifies 2-FRV-258 is in AUTO & OPEN Operator Verifies 2-FRV-256 White Light is LIT CUE: AEO reports TDAFP Test Valve 2-FRV-256 White Light is LIT locally.
CUE: AEO reports 2-CA-6530, 50 PSI Control Air to 2-XSO-256 is OPEN CT: Operator Directs AEO to OPEN 2-FW-263 TDAFP Test Valve Outlet Shutoff CUE: AEO reports 2-FW-263 TDAFP Test Valve Outlet Shutoff is OPEN CT: Operator places CS for 2-FRV-256 to TEST.
Page 1 of 3 Revision 0
COURSE NUMBER NRC2006-SIM06 REVISION: 0 AND TITLE: Perform Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance CT: Operator Directs AEO to Open 2-FRV-256.
CUE: (Simulator Booth Operator = MRF FWR037 to 100%)
AEO reports that 2-FRV-256 is Open and the TDAFP ready for Starting CT: Operator starts TDAFP (Place 2-QT-506 to OPEN) and times opening with Stop Watch
{NOTE: US Acknowledges TDAFP start and annunciator clear.}
CT: Operator Records IST times 13.0 min. , 17.4 Max Operator Records Start Time and verifies it is Acceptable.
CT: After the TDAFP speed has stabilized, Operator Depresses the TDAFP TRIP PUSHBUTTON CT: Operator runs TDAFP Trip & Throttle Valve CLOSED after 30 seconds. (Place 2-QT-506 to CLOSED)
Operator Directs AEO to CLOSE 2-FW-263, 2-FRV-256 & 2-CA-6530.
CUE: AEO reports 2-FW-263 TDAFP Test Valve Outlet Shutoff is CLOSED CUE: (Simulator Booth Operator = MRF FWR037 to 0%)
AEO reports that 2-FRV-256 is CLOSED CUE: AEO reports 2-CA-6530, 50 PSI Control Air to 2-XSO-256 is CLOSED and has been Independently verified Closed.
Operator places CS for 2-FRV-256 to NORMAL.
Page 2 of 3 Revision 0
COURSE NUMBER NRC2006-SIM06 REVISION: 0 AND TITLE: Perform Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance
{NOTE: Provide CUE that second verification is complete when asked.]
CT: Operator holds CS for 2-FMO-211 to OPEN and verifies OPEN CT: Operator holds CS for 2-FMO-221 to OPEN and verifies OPEN CT: Operator holds CS for 2-FMO-231 to OPEN and verifies OPEN CT: Operator holds CS for 2-FMO-241 to OPEN and verifies OPEN Operator verifies that Panel 213 Drop 50 & Panel 214 Drop 10 are NOT LIT THIS JPM IS COMPLETE Page 3 of 3 Revision 0
NRC2006-SIM06 Task Briefing Your are the Extra RO The US directs you to Perform 02-OHP-4030-STP-017TV, Turbine Driven AFW Pump Trip & Throttle Valve Operability Surveillance.
The TDAFP has been declared inoperable and LCO 3.7.5 has been entered for this Surveillance. An AEO has been briefed. The AEO has verified the TDAFP is ready for Start and is standing by.
There is No Identified Primary to Secondary leakage.
NRC2006-SIM06.doc Page 1 of 1 Revision 0
NRC2006-SIM07 TITLE Start a Reactor Coolant Pump (ALT) REVISION 0 PROGRAM Initial Licensed Operator (ILT) TIME 15 Minutes SCOPE OF REVISION:
Modified RO-O-A030 by changing fault from RCP Seal Injection to CCW restoration.
DATE:
AUTHOR Name: Max Bailey Signature:
FACILITY Name:
REVIEWER Signature:
Facility Supervisor / Manager Page 1 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
REFERENCES 02-OHP-4023-SUP-007, Rev 1a Restoration of RCP Cooling 02-OHP-4023-SUP-010, Rev 3 Starting Reactor Coolant Pumps TASK: 0020030501 Restore RCP Support Systems following Containment Isolation 0020040501 Start an RCP KA
REFERENCE:
SYS 003 A4.08 (3.2/2.9)
EVALUATION SETTINGS1
- 1. Simulator HANDOUTS
- 1. Task Briefing
- 2. Copy of 02-OHP-4023-SUP-010
- 3. Copy of 02-OHP-4023-SUP-007 ATTACHMENTS
- 1. NONE SIMULATOR SETUP2
- 1. Initialize simulator to any at power IC 982. [IC-28]
- 2. Insert malfunctions to remove reserve power (ED03A and ED03B)
- 3. Manually trip the reactor
- 4. Close valves 2-CCM-458 and 2-CCM-451
- 5. Perform actions in accordance with E-0 and ES-0.1
Reset TR201AB and TR201CD 86 Relays
- 7. Restore Normal [N] lighting transformer to restore chart power. [MRF EDR34 to TRIP then RESET]
- 8. Ensure all SG NR levels above 27%.
- 9. FREEZE the simulator.
1 Evaluation settings are listed in the preferred order.
2 Simulator setup can be stored in a temporary IC to expedite the evaluation process.
Page 2 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
TASK OBJECTIVES/STANDARDS Start RCP #23 as directed per 02-OHP-4023-SUP-010 after restoring CCW Cooling per 02-OHP-4023-SUP-007 while observing all applicable precautions and limitations and procedure steps.
EVALUATOR INSTRUCTIONS You are the Extra RO 20 minutes ago, an external Fault caused a reactor trip. Reserve power was lost after the trip, but has since been restored.
The crew has performed E-0, Reactor Trip or Safety Injection, and entered ES-0.1. Power has been restored to RCP Buses 2C & 2D The US directs you to start RCP #23 using 02-OHP-4023-SUP-010, Starting Reactor Coolant Pump(s).
Page 3 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
CUE: RCP bus 2D energized CT: Determines that RCP CCW Flow is NOT NORMAL & Enters RNO action go to SUP-007.
NOTE : Supply Operator with copy of 02-OHP-4023-SUP-007.
Page 4 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
CUE: All RCP alarms currently standing are the only ones that have been in alarm.
Operator verifies Panel 207 Drop 74 NOT LIT Operator verifies 2-QTI-230 is less than 225ºF Page 5 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Operator verifies Panel 207 Drop 68 NOT LIT CT: Operator places 2-CCM-458 CS to OPEN Operator verifies 2-CCM-458 & 2-CCM-459 are OPEN with red light lit Operator verifies 2-CCM-453 & 2-CCM-454 are OPEN with red light lit CT: Operator places 2-CCM-451 CS to OPEN Operator verifies 2-CCM-451 & 2-CCM-452 are OPEN (red light lit)
Page 6 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Checks East CCP pump running Verifies RCP Seal Injection to 6-12 gpm Returns to 02-OHP-4023-SUP-010 Step 2.
Page 7 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Verifies RCP #23 CCW flows are Acceptable.
Page 8 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Operator verifies RCP Seal Injection to 6-12 gpm Operator verifies Panel 207 Drop 67 is NOT LIT for RCP #23.
Operator verifies No. 1 Seal DP for RCP #23 is greater than 200.
Page 9 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Operator verifies RCP #23 seal leakoff flow above minimum value.
Operator verifies RVLIS Upper Plenum greater than 92%.
Page 10 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
CT: Operator places the #23 RCP Bearing Lift Pump CS to RUN (Evaluator may time compress once 2 minute run time is mentioned).
Operator verifies SI NOT actuated.
Page 11 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Operator verifies All SG levels above 27%.
Page 12 of 14
COURSE NUMBER NRC2006-SIM07 AND TITLE: REVISION: 0 Start a Reactor Coolant Pump (ALT)
Operator verifies both PZR Spray valves are CLOSED CT: Operator places the RCP #23 CS to RUN.
Operator verifies UV alarms Panel 221 Drop 67 & 68 are NOT LIT.
CUE: Panel 221 Drops 67 & 68 are NOT LIT Operator places the #23 RCP Bearing Lift Pump CS to STOP Operator reports the No 23 RCP is running.
THIS JPM is COMPLETE Page 13 of 14
NRC2006-SIM07 Task Briefing You are the Extra RO 20 minutes ago, an external Fault caused a reactor trip. Reserve power was lost after the trip, but has since been restored.
The crew has performed E-0, Reactor Trip or Safety Injection, and entered ES-0.1.
Power has been restored to RCP Buses 2C & 2D The US directs you to start RCP #23 using 02-OHP-4023-SUP-010, Starting Reactor Coolant Pump(s).
NRC2006-SIM07.doc Page 14 of 14