MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
December 5, 2006 Mr. William R. Brian Vice President of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - RE: FINAL ACCIDENT SEQUENCE PRECURSOR ANALYSIS OF APRIL 2003 OPERATIONAL EVENT, LER 416/03-002
Dear Mr. Brian:
Enclosed are the final results of the Accident Sequence Precursor (ASP) analyses of an event which occurred at Grand Gulf Nuclear Station, Unit 1 (GGNS), as documented in Licensee Event Report (LER) 416/03-002. The subject event occurred on April 14, 2003, during which GGNS experienced an automatic reactor scram due to loss of offsite power with the condenser vacuum pump inoperable and subsequent failure of instrument air, and was reported in LER 416/03-002. The ASP analysis (Agencywide Documents Access and Management System (ADAMS) Accession No. ML062710045) calculated a mean conditional core damage probability of 1.3 x 10-6. The final ASP analyses were previously sent to the licensee and the Office of Nuclear Reactor Regulation (NRR) staff for review. NRR and licensee comments have been addressed in the enclosed analyses.
The Nuclear Regulatory Commission (NRC) established the ASP Program in 1979 in response to the Risk Assessment Review Group report (see NUREG/CR-0400, dated September 1978).
The ASP Program systematically evaluates U.S. nuclear power plant operating experience to identify, document, and rank the operating events that were most likely to have led to inadequate core cooling and severe core damage (precursors), accounting for the likelihood of additional failures.
The ASP Program has the following objectives:
- Provide a measure for trending nuclear power plant core damage risk.
- Provide feedback to regulatory activities.
- Evaluate the adequacy of NRC programs.
The NRC also uses the ASP Program to monitor performance against the safety goal established in the agency's Strategic Plan (See NUREG-1100, Vol. 21, dated February 2005).
W. Brian For more information about the ASP Program, see the annual ASP Program Report at http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2005/secy2005-0192/2005-01 92scy.pdf.
The enclosure is provided for your information and no response is requested.
If you have any questions, please contact me at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Final ASP Analysis cc w/encl: See next page
Pkg ML063210035 (Letter ML063200384, Enclosure ML062710045)
OFFICE NRR/LPLIV/PM NRR/LPLIV/LA RES/DRASP/D NRR/LPLIV/BC NAME BVaidya LFeizollahi FEltawila DTerao DATE 11/28/06 11/27/06 11/1/06 11/30/06 Grand Gulf Nuclear Station cc:
Executive Vice President Office of the Governor
& Chief Operating Officer State of Mississippi Entergy Operations, Inc. Jackson, MS 39201 P.O. Box 31995 Jackson, MS 39286-1995 Attorney General Asst. Attorney General Chief State of Mississippi Energy and Transportation Branch P.O. Box 22947 Environmental Compliance and Jackson, MS 39225-2947 Enforcement Division Mississippi Department of Environmental Vice President, Operations Support Quality Entergy Operations, Inc.
P.O. Box 10385 P.O. Box 31995 Jackson, MS 39289-0385 Jackson, MS 39286-1995 President Director Claiborne County Nuclear Safety Assurance Board of Supervisors Entergy Operations, Inc.
P.O. Box 339 P.O. Box 756 Port Gibson, MS 39150 Port Gibson, MS 39150 Regional Administrator, Region IV Director U.S. Nuclear Regulatory Commission Nuclear Safety & Licensing 611 Ryan Plaza Drive, Suite 400 Entergy Operations, Inc.
Arlington, TX 76011-8064 1340 Echelon Parkway Jackson, MS 39213-8298 Senior Resident Inspector U.S. Nuclear Regulatory Commission Manager, Licensing P.O. Box 399 Entergy Operations, Inc.
Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 General Plant Manager Operations Richard Penrod, Senior Environmental Entergy Operations, Inc. Scientist/State Liaison Officer P.O. Box 756 Office of Environmental Services Port Gibson, MS 39150 Northwestern State University Russsell Hall, Room 201 Attorney General Natchitoches, LA 71497 Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 State Health Officer State Board of Health P.O. Box 139 Jackson, MS 39205 November 2006