Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000313/FIN-2018002-01 + (Failure to Implement Procedural Guidance to Close Spent Fuel Pool Cooler Outlet Crosstie Valve)
- 05000298/FIN-2009002-04 + (Failure to Implement Procedural Requirements for Tracking Control Room Deficiencies (Section 4OA2))
- 05000410/FIN-2013005-02 + (Failure to Implement Procedural Requirements for Evaluating Control Room Deficiencies as Operator Workarounds)
- 05000361/FIN-2008003-06 + (Failure to Implement Procedural Requirements for Planned Unit 2 Power Reduction)
- 05000368/FIN-2014004-03 + (Failure to Implement Procedural Requirements for Axial Shape Index during a Rapid Power Reduction)
- 05000285/FIN-2014004-01 + (Failure to Implement Procedural and alarm setpoint changes in support of an Operability Eval)
- 05000373/FIN-2012002-02 + (Failure to Implement Proceduralized Corrective Actions)
- 05000458/FIN-2011002-07 + (Failure to Implement Procedure AOP-0027, Fuel Handling Mishaps)
- 05000335/FIN-2012004-02 + (Failure to Implement Procedure EN-AA-205, Design Change Packages)
- 05000313/FIN-2011005-02 + (Failure to Implement Procedure Results in Lowering Spent Fuel Pool Level by 0.6 Feet)
- 05000282/FIN-2012002-05 + (Failure to Implement Procedure Use and Adherence Requirements While Draining Sodium Hypochlorite Draw Down Tank)
- 05000397/FIN-2013008-05 + (Failure to Implement Procedure for Age Management of Electrolytic Capacitors)
- 05000458/FIN-2018001-01 + (Failure to Implement Procedure for Storage of Material in the Pools)
- 05000219/FIN-2010005-03 + (Failure to Implement Procedures Resulting in Reactor Scram)
- 05000397/FIN-2014003-02 + (Failure to Implement Procedures That Ensure Operators Could Perform Time Critical Steps For Fire Events)
- 05000348/FIN-2009004-04 + (Failure to Implement Procedures Used to Prevent Seismic Interaction with Safety-Related Equipment)
- 05000272/FIN-2014005-02 + (Failure to Implement Procedures during Shutdown Results in ESF Actuation)
- 05000440/FIN-2017001-01 + (Failure to Implement Procedures for Combating a Loss of Shutdown Cooling)
- 05000250/FIN-2009003-01 + (Failure to Implement Procedures for Conducting a Valve Alignment Causes Spill of Reactor Coolant And Contamination Of a Plant Employee)
- 05000353/FIN-2016001-06 + (Failure to Implement Procedures for Control of Potentially Contaminated Clean Systems)
- 05000327/FIN-2012002-01 + (Failure to Implement Procedures for Tornado Watch/Warning)
- 05000317/FIN-2015004-01 + (Failure to Implement Procedures for the Control of Hazard Barriers During Maintenance)
- 05000397/FIN-2015003-04 + (Failure to Implement Procedures to Ensure Availability of Safe Shutdown Personnel)
- 05000482/FIN-2012007-06 + (Failure to Implement Procedures to Test SAFETY-RELATED Equipment)
- 05000382/FIN-2015011-01 + (Failure to Implement Proper Control of Fire Protection Impairments)
- 05000454/FIN-2015004-03 + (Failure to Implement Protective Tagging Procedure Requirements)
- 05000305/FIN-2000019-01a + (Failure to Implement QA Manual Requirements for Determining Significance)
- 05000305/FIN-2000019-01b + (Failure to Implement QA Manual Requirements for Trending)
- 05000335/FIN-2016010-02 + (Failure to Implement Qualification Procedures and Methods in Accordance with IEEE 323-1974)
- 05000361/FIN-2011005-02 + (Failure to Implement Required Compensatory Measures Resulted in Inoperable Condensate Storage Tank)
- 05000266/FIN-2017004-01 + (Failure to Implement Required Provisions of NFPA 805)
- 05000250/FIN-2009005-01 + (Failure to Implement Required TS Controls for a High Radiation Area with Dose Rates in Excess of 1000 mrem/hr)
- 05000220/LER-2009-001, Failure to Implement Required Technical Specification Actions Associated with Failed Surveillance Test + (Failure to Implement Required Technical Specification Actions Associated with Failed Surveillance Test)
- Information Notice 1994-14, Failure to Implement Requirements for Biennial Medical Examinations and Notification to the NRC of Changes in Licensed Operator Medical Conditions + (Failure to Implement Requirements for Biennial Medical Examinations and Notification to the NRC of Changes in Licensed Operator Medical Conditions)
- 05000461/FIN-2013005-02 + (Failure to Implement Requirements of Station Scaffold Installation Procedure)
- 05000259/FIN-2011011-01 + (Failure to Implement Requirements of the Inservice Testing Program)
- 05000285/FIN-2015001-02 + (Failure to Implement Risk Management Actions for Planned Maintenance Activities)
- 05000266/FIN-2012004-02 + (Failure to Implement Risk Management Actions During Various Emergent Work Activities)
- 05000298/FIN-2013005-02 + (Failure to Implement Risk Management Actions for Proposed Maintenance Activities)
- 05000387/FIN-2012004-03 + (Failure to Implement Risk Management Actions)
- 05000266/FIN-2013003-05 + (Failure to Implement Risk Management Actions During Bus D-40 Outage)
- 05000324/FIN-2013003-04 + (Failure to Implement Risk Management Actions During Elevated Risk)
- 05000324/FIN-2016003-01 + (Failure to Implement Risk Management Actions during Elevated Risk)
- 05000298/FIN-2014002-01 + (Failure to Implement Risk Management Actions for Maintenance Activities)
- 05000293/FIN-2009002-02 + (Failure to Implement Scaffolding Procedure Requirement)
- 05000244/FIN-2013004-02 + (Failure to Implement Scaffolding Procedure Requirements)
- 05000346/FIN-2009005-05 + (Failure to Implement Specified As-Found Diagnostic Testing of MOVs)
- 05000423/FIN-2014005-05 + (Failure to Implement Standing Order Restrictions into the EOPs and AOPs for the Unit 3 TDAFW Pump Flow Control Valve)
- 05000247/FIN-2016001-04 + (Failure to Implement Surveillance Requirement for Main Boiler Feed Pump Trip Function)
- 05000348/FIN-2009004-02 + (Failure to Implement Surveillance Test Instructions to Prevent Over-Speed of the TDAFW Pump)
- 05000272/FIN-2014005-03 + (Failure to Implement TS Locked High Radiation Area Controls)