Finding | |
---|---|
Title | Failure to Implement Risk Management Actions During Various Emergent Work Activities |
Description | The inspectors identified a finding of very low safety significance and associated non-cited violation of 10 CFR 50.65(a)(4) because the licensee failed to properly manage and assess risk for various emergent work activities. Specifically, the licensee failed to manage the risk associated with the gas turbine generator (G-05) failure out-of-service duration, the G-05 unavailability when on the turning gear, and the Unit 1 turbine electrohydraulic control (EHC) system in manual. The issue was entered into the licensees corrective action program as action requests AR01808661 and AR01787706 for evaluation and development of corrective actions. The finding was determined to be more than minor in accordance with IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, dated September 7, 2012, because the failure to properly manage and assess risk, if left uncorrected, would have the potential to become a more significant safety concern. Specifically, the inspectors determined that the addition of a Unit 1 transient initiator and of G-05 modeled as out-of-service into the licensees safety monitor program for risk was more than minor because the licensees risk assessment was based on incorrect assumptions that changed the outcome of the assessment. The inspectors evaluated the finding using IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings, Tables 2 and 3, dated June 19, 2012, and Appendix K, Maintenance Risk Assessment And Risk Management Significance Determination Process, dated May 19, 2005. The inspectors determined that the finding was a mitigating systems contributor, evaluated the risk deficit for each instance, and found that the issue screened as having very low safety significance. This finding has a cross-cutting aspect in the area of human performance, work practices, because the licensee failed to define and effectively communicate expectations regarding procedural compliance and ensure personnel follow procedures. Specifically, in all instances the licensee failed to communicate expectations regarding compliance as required by station nuclear procedure (NP) 1.1.4, and ensure personnel followed implementing procedure NP 10.3.7, for risk management |
Site: | Point Beach ![]() |
---|---|
Report | IR 05000266/2012004 Section 1R13 |
Date counted | Sep 30, 2012 (2012Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | C Zoia J Jandovitz M Kunowski S Burton R Krsek V Meghani M Learn M Thorpe-Kavanaugh P Cardona-Morales K Carrington |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |