| Title | Failure to Implement Procedures during Shutdown Results in ESF Actuation |
| Description | The inspectors identified a Green NCV of TS 6.8.1, Procedures and Programs, when PSEG operators did not implement the procedure steps to trip the main turbine, and manually initiate auxiliary feedwater (AFW), during shutdown for a refueling outage on October 19, 2014. Consequently, operator response to degrading equipment conditions resulted in an unplanned manual reactor trip and coincident AFW actuation. PSEGs immediate corrective actions included conducting crew performance reviews documented as part of the post-trip review by the sites Plant Operations Review Committee (PORC), and subsequent coaching of operator performance. The inspectors determined PSEGs failure to trip the main turbine and establish AFW flow on October 19, in accordance with (IAW) abnormal and shutdown procedures, constituted a performance deficiency. The finding was more than minor because it was associated with the Human Performance attribute of the Initiating Event cornerstone, and adversely affected its objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, not following procedures in response to the 1B main power transformer (MPT) challenges resulted in an unplanned manual reactor trip and coincident Engineered Safety Features (ESF) AFW system actuation. In accordance with IMC 0609, Attachment 4, and Exhibit 1 of Appendix A, the inspectors determined that this finding is of very low safety significance, or Green, because the finding did not cause both a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition. The inspectors determined that this finding had a cross-cutting aspect in the area of Human Performance, Procedure Adherence, because PSEG operators did not follow procedures in response to degrading 1B MPT conditions during shutdown for a refueling outage on October 19. |
| Site: | Salem |
|---|---|
| Report | IR 05000272/2014005 Section 1R20 |
| Date counted | Dec 31, 2014 (2014Q4) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.2 |
| Inspectors (proximate) | A Defrancisco A Ziedonis C Cahill D Silk E Burket G Dentel H Gray M Draxton P Finney R Barkley T O'Hara |
| Violation of: | Technical Specification - Procedures Technical Specification |
| CCA | H.8, Procedure Adherence |
| INPO aspect | WP.4 |
| ' | |