The inspectors identified a Green finding The inspectors identified a Green finding (FIN) for CENG staffs failure to properly classify operator workarounds, operator burdens, or control room deficiencies in accordance with CNG-OP-1.01-2010, Operator Workaround/Challenge Control, Revision 0. Specifically, the failure to properly classify operator workarouonds resulted in an operator error when control room operators did not recognize a meter was degraded, used that meter during the performance of a surveillance test, and overexcited the Division II emergency diesel generator (EDG) on July 30, 2013. CENG staff entered this inspector identified issue into the corrective action program (CAP) as condition report (CR)-2013-009004. Corrective actions included reviewing, classifying, and adding the inspector identified operator burdens to each of the respective Units shift turnover checklist. This finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to properly classify the Unit 2 Division II EDG degraded volt amperes reactive (VAR) meter as an operator burden resulted in an operator using the degraded meter during a surveillance test and inadvertently overexciting the diesel generator for 1.5 hours. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 2 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, issued June 19, 2012, the inspectors determined that this finding is of very low safety significance (Green) because the performance deficiency was not a design or qualification deficiency, did not involve an actual loss of safety function, did not represent actual loss of a safety function of a single train for greater than its technical specification (TS) allowed outage time, and did not screen as potentially risk-significant due to a seismic, flooding, or severe weather initiating event. This finding has a cross-cutting aspect in the area of Problem Identification and Resolution, Corrective Action Program, in that CENG staff did not ensure control room deficiencies were evaluated properly in accordance with CNG-OP-1.01-2010. Specifically, CENG staff failed to classify the known degraded Unit 2 Division II EDG VARs meter as an operator burden; which resulted in the EDG being overloaded during a surveillance test.ing overloaded during a surveillance test.  
23:59:59, 31 December 2013  +
05000410  +
23:59:59, 31 December 2013  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
5.787037e-5 d (0.00139 hours, 8.267196e-6 weeks, 1.9025e-6 months)  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
03:48:10, 28 September 2017  +
23:59:59, 31 December 2013  +
Failure to Implement Procedural Requirements for Evaluating Control Room Deficiencies as Operator Workarounds  +