Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML103080101 + (E-mail Browns Ferry Nuclear Plant Units 1, 2, and 3-Acceptance of Requested Licensing Action-Modification of TS 3.7.3., Control Room Emergency Ventilation System)
- ML051680095 + (E-mail Brunswick Cooling Tower Information)
- ML18115A008 + (E-mail Brunswick Hs Request for Information)
- ML12132A267 + (E-mail Brunswick Sea Turtle Logbook Entry for 5/7/2012)
- ML12132A269 + (E-mail Brunswick Sea Turtle Logbook Entry for 5/8/2012)
- ML051220424 + (E-mail Brunswick Site Audit Follow-Up Item 8)
- ML051220567 + (E-mail Brunswick Site Audit Right-of-Way Specifications)
- ML090260791 + (E-mail Brunswick Steam Electric Plant, Units 1 and 2 - LIC-109 Acceptance Review for ME0168 and ME0169 Adoption of TSTF-478 (CLIIP) to Implement Revised Rule for Combustible Gas Control for Brunswick)
- ML051220182 + (E-mail Brunswick Transmission Lines)
- ML100600914 + (E-mail Byron 1 & 2 - RAI for One -Time Extension of ESW Train Completion Time (ME2293-94))
- ML100630792 + (E-mail Byron 1 & 2 - Request for Additional Information for One-Time Extension of ESW Train Completion Time (ME2293-94))
- ML110610795 + (E-mail Byron Station Unit 1 Supplemental Information Request to Support Baseline ISI Inspection Procedure)
- ML032461422 + (E-mail C. Konzman, NRR, to N. Dudley, NRR, Fwd License Renewal Application)
- ML032460328 + (E-mail C. Konzman, NRR, to NRR Inforeview, Fwd Turkey Point SEIS W/Att 01/23/02 e-mail C. Konzman, NRR, to Nrcweb)
- ML050450560 + (E-mail CR 2-2003-1882)
- ML15198A105 + (E-mail Capture - 2.206 Petition Request on Current Licensing Basis for Flooding at Pilgrim Nuclear Power Station -Teleconference)
- ML11165A185 + (E-mail Capture - Indian Point - Remaining Questions)
- ML12068A420 + (E-mail Capture - ME7110 Record of Clarification Conference Call for ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Aadb Request for Additional Information (RAI))
- ML15292A234 + (E-mail Capture - Millstone Power Station, Unit 2 - Verbal Authorization by the NRC Staff - Revision to Alternative Request RR-04-20)
- ML15321A499 + (E-mail Capture - Millstone, Unit 2, Acceptance Review Determination - Revision to Alternative Request RR-04-20 (MF6982))
- ML15258A219 + (E-mail Capture - Pilgrim Nuclear Power Station Acceptance Review - PRR-50 and PRR-51 (Proposed Alternative to Nozzle-to-Weld Weld Examination (Code Case N-702) MF6362 and RPV Shell Circumferential Weld Examination (BWRVIP-05) MF6361)
- ML16217A174 + (E-mail Capture - R.Guzman to W.Craft Opportunity to Review and Comment on an NRC Information Collection (Docket NRC-2016-0016))
- ML12118A045 + (E-mail Capture - Request for Additional Information License Amendment Request Dated November 22, 2011)
- ML22024A111 + (E-mail Capture- Catawba POV Inspection Information Request (1))
- ML102940413 + (E-mail Catawba 1 and 2 - RAI Regarding License Amendment Request Dated 3/31/2010 to Relocate Specific Surveillance Frequency Requirements to a Licensee-Controlled Program Using a Risk-Informed Justification)
- ML21123A038 + (E-mail Chain Re Requested Updates)
- ML18096B446 + (E-mail Clarification Relief Request 1-TYP-4-BN-01)
- ML13101A106 + (E-mail Close TAC J00365 - Dairyland Power Coop/Lacrosse - LACBWR ICM Clarif. Req)
- ML051460285 + (E-mail Coalition Asks for Explanation of Millstone Reactor Shutdown Fyi)
- ML103280572 + (E-mail Columbia - Letter from State Historic Preservation Officer to Energy Northwest Transmission Lines)
- ML110180439 + (E-mail Comanche Peak, Unit 1 - Acceptance Review Email for Relief Request (RR) B-11 for Piping Welds and RR B-10 for Safety Injection Piping (TAC Me, Second 10-Year Inservice Inspection Interval)
- ML12206A332 + (E-mail Combined Request for Additional Information for Several Branches of NRR for the Submittal on Palisades re-sack LAR)
- ML13128A269 + (E-mail Comment Received on Petition for Rulemaking, PRM-72-7)
- ML090840664 + (E-mail Comment from G. Halnon, Firstenergy, Regarding TMI-1 Draft GEIS)
- ML090840665 + (E-mail Comment from L. Spears Regarding TMI-1 Draft SEIS)
- ML17222A219 + (E-mail Comments from Pennsylvania State Environmental Protection Regarding Emergency Plan Emergency Action Level Scheme to Adopt the NEI-99-01 Eals, Revision 6, for Beaver Valley Power Station, Units 1 and 2)
- ML11199A026 + (E-mail Comments on June 8 Follow Up Meeting)
- ML092120576 + (E-mail Comments to 7/20/09 Letter on TSTF Traveler-400)
- ML18044A843 + (E-mail Communication with Daniel Ragle, Choctaw Nation of Oklahoma, Regarding NRC Environmental Audit Summary Report (February 9, 2018))
- ML110890084 + (E-mail Communications Regarding Exemption Request (Magnastor AMD2), Dated March 29, 2011)
- ML20329A373 + (E-mail Completeness Determination Holtec Spent Fuel Pool Heat Up Calculation Methodology Topical Report)
- ML12102A257 + (E-mail Concerning FW: 2:00-3:00 Executive Brief on Seabrook ASR)
- ML003720367 + (E-mail Concerning Industry Working Hour Practices)
- ML12102A249 + (E-mail Concerning Seabrook ASR Discussion - Internal to NRC Staff)
- ML110200608 + (E-mail Conference Call with Licensee to Clarify RAIs (Exelon))
- ML060820421 + (E-mail Confirmation of Temporary Verbal Reliefs)
- ML19063B253 + (E-mail Conversation with R. Augi/Ge Power Action: Review Telecon Summaries)
- ML091390012 + (E-mail Cooper Nuclear Station - Change in Regulatory Commitment)
- ML102420138 + (E-mail Cooper Nuclear Station - Decommissioning Fund Spot Check)
- ML18190A142 + (E-mail Correspondence - License Application XCOM1312 Questions from the Applicant)
- ML14209B063 + (E-mail Correspondence - Shine Preliminary Safety Analysis Report, Revised Draft Request for Additional Information)