Drew Holland - CR 2-2003-1882 Page 1 From:

-SCHEIDE, RICHARD H" <RSCHEID @entergy.com>

To:

"'Drew Holland (dghl @nrc.gov)"' <dghl @nrc.gov>

Date:

5/27/04 2:28PM

Subject:

CR 2-2003-1882

Drew, The attached e-mail was an attachment to the referenced CR and was the only action taken. If you want the Cr, call me and let me know your fax number and I will forward it.

Dick

I C\\WbNOWS\\TEMP\\GW}00001 i.TMP C:\\W

.W T:1a I

Mail Envelope Properties (40B63335.CD4: 2: 48340)

Subject:

Creation Date:

From:

CR 2-2003-1882 5/27/04 2:23PM "SCHEIDE, RICHARD H" <RSCHEID@enteryv.com>

Created By:

RSCHEID@entergy.com Recipients nrc.gov owf4_po.OWFNDO DGH1 (Drew Holland)

Post Office owf4_po.0WFN_DO Route nrc.gov Files MESSAGE Part.001 MessageFrom.doc Mime.822 Options Expiration Date:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

Size 191 889 41472 59558 Date & Time 05/27/04 02:23PM None Standard No None No Standard e1bv

-A'-T

Date: May 28, 2004 NOTE TO FILE ON DOCKET 50-368 LICENSEE RESPONSES TO QUESTIONS FROM NRR TO ANO-2 MANAGEMENT REGARDING TIA-2004-01 REQUIREMENTS INTENDED TO CONTROL THE DEGRADATION OF CLASS 1 E BATTERIES DURING MAY 2004, Management at ANO-2 responded to a number of questions that Project Manager, Drew Holland asked the licensee on behalf of Matthew McConnell and Saba Saba of EEIB in the Division of Engineering. A partial response to the questions by the licensee is provided by the attachment to this note to file.

The questions asked were as follows:

1) When did the initial equalizing charge take place for the cell that replaced cell 41 in2D11?
2) When did the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> float charge begin?
3) Provide a copy of the procedure used for discharge testing.
4) Does the procedure of 3) above cover pre-installation discharge testing?
5) Provide a copy of CR-ANO-2-2003-1882.
6) How were the four cells selected from 2D12 ? What was the acceptance criteria for the four cells?
7) Why were replacement cells not taken from the spare cell bank?

Docket No. 50-368

MessageFrom: HOFFPAUIR, JAMES G Sent: Thursday, December 18, 2003 12:43 PM To: SMITH, J LARRY

Subject:

FW: 2D-11 Cell 25 voltage below maintenance limit


Original Message-----

From: COLCLOUGH, RICHARD J Sent: Monday, December 15, 2003 9:42 AM To: MARTIN, RANDAL K; GRAY, MICHAEL R; BEAIRD, ROBERT K; HARTMAN, ANGELA M; VESS, KENNETH L; HOFFPAUIR, JAMES G Cc: WEBSTER, CARL R; TALBERT, KEVIN R; VAUGHN, RANDY D; BROWN, TIMOTHY E; MCFARLAND, RUSSELL M

Subject:

RE: 2D-11 Cell 25 voltage below maintenance limit

All, The reading on 2D-11 cell 25 was 2.180 VDC as of 9:00 am Monday morning.

We will further monitor it as we perform the Weekly Test on Tuesday per Michael Gray.

Rick Colclough


Original Message-----

From: MARTIN, RANDAL K Sent: Saturday, December 13, 2003 6:03 PM To: GRAY, MICHAEL R; BEAIRD, ROBERT K; HARTMAN, ANGELA M; VESS, KENNETH LI HOFFPAUIR, JAMES G Cc: WEBSTER, CARL R; TALBERT, KEVIN R; VAUGHN, RANDY D; BROWN, TIMOTHY E; COLCLOUGH, RICHARD J

Subject:

2D-11 Cell 25 voltage below maintenance limit

Folks, We were performing the quarterly surveillance on 2D-11 this last Friday and found cell 25 below the maintenance limit of 2.17 VDC.

I do not the history of this cell yet, but we will follow-up Monday.

We performed the 2D-11 quarterly to satisfy a concern by the NRC on whether we had taken specific gravities on the cells since the last equalize charge after cell 41 was replaced coming up out of 2R16.

CR 2-2003-1882

During the performance of proc. 2403.024 ( 2D-11 Quarterly Surveillance ) W/O # 50571451-01, voltage on Cell # 25 was found to be at 2.166 VDC which is below the maintenance limit of 2.17 VDC. This condition report was initiated at the request of Jeff Rudder U-2 OPS for trending.

Thanks, Randal Martin Office:

479-858-4075 Pager:

479-890-0999