Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "E-Mail Acceptance Review for License Amendment Request". Since there have been only a few results, also nearby values are displayed.

⧼showingresults⧽

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML110630535  + (E-Mail - Quad Cities Notification of Inspection and Request for Information)
  • ML25317A527  + (E-Mail - Regulatory Audit Report in Support of Review of Topical Report SSP-14-P01/028 (NRC Project No. 0816), Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors)
  • ML25107A070  + (E-Mail - Regulatory Audit in Support of NRC Staff’S Review of EPRI Report 3002028673, LOCA-Induced Fuel Fragmentation, Relocation and Dispersal (FFRD) with Leak-Before-Break (LBB) Credit - Alternative Licensing Strategy (Als))
  • ML102370210  + (E-Mail - Request for Additional Information Regarding 2009 Steam Generator Tube Inspections)
  • ML20035F145  + (E-Mail - Request for Supporting Information for the Dresden Seismic Probabilistic Risk Assessment Audit Review)
  • ML20202A501  + (E-Mail - Topical Report Development for Use of On-Line Monitoring for Transmitter Calibration Extensions)
  • ML090560030  + (E-Mail - Transmittal of Draft RAIs D. C. Cook Unit 1, Relief Request (ISIR-28) Associated with Weld Inlays as an Alternate Repair Technique (MD9997))
  • ML25234A191  + (E-Mail - Transmittal of Final Safety Evaluation for Electric Power Research Institute Report 3002028939, Risk-informed High-Energy Line Break Evaluation Requirements)
  • ML25129A069  + (E-Mail - Transmittal of Safety Evaluation for EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements for Proprietary Review)
  • ML24197A006  + (E-Mail - Transmittal of the Completed NRC Form 896, -A Topical Report Verification, for EPRIs BWRVIP-315, Reactor Internals Aging Management Evaluation for Extended Operations)
  • ML25211A204  + (E-Mail - Transmittal of the Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2)
  • ML25317A017  + (E-Mail - Transmittal: U.S. Nuclear Regulatory Commission Form 896, -A Topical Report Verification, for EPRI Report 3002033918, Risk-informed High Energy Line Break Evaluation Requirements)
  • ML23299A293  + (E-Mail - U. S. Nuclear Regulatory Commission Completion Determination Form 898 and Withholding Determination Form 897 for BWRVIP-138, Revision 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines,)
  • ML103280472  + (E-Mail - from Bruce L., RES to Jazel P., RES - Subject: FW Email Messages Related to DG1242/RG 1.54 Rev. 2)
  • ML20262H047  + (E-Mail - to Arenner from Jmazza - Draft RAIs - Oklo Mca Heat Transfer and SSC Classification)
  • ML13002A159  + (E-Mail 01-02-2013 - Response to Supplement to Oyster Creek 2 206 Petition)
  • ML19178A202  + (E-Mail 43 Documents That Were Not Released)
  • ML050830382  + (E-Mail A. Keim, NRR, to H Chernoff, NRR, Relaxation Request)
  • ML050830414  + (E-Mail A. Keim, NRR, to H. Chernoff, NRR, Relaxation Request Revision 1)
  • ML050830325  + (E-Mail A. Keim, NRR, to H. Chernoff, NRR, Point Beach Requested Order Relaxation)
  • ML051940081  + (E-Mail Abdullahi, NRR, to Ennis, NRR, Et, Al. VY EPU Conference Call)
  • ML051640046  + (E-Mail Abdullahi, NRR, to Ennis, NRR, VY EPU - Srxb RAIs)
  • ML082700424  + (E-Mail Acceptance Review)
  • ML081780016  + (E-Mail Acceptance Review for Columbia License Amendment Request)
  • ML083110454  + (E-Mail Acceptance Review for Columbia Relief Request)
  • ML090230023  + (E-Mail Acceptance Review for License Amendment Request, Revise Control Rod Notch Testing Frequency in Accordance with TSTF-475 Using Consolidated Line Item Improvement Process)
  • ML090980026  + (E-Mail Acceptance Review for License Amendment Request)
  • ML090060046  + (E-Mail Acceptance Review for License Amendment Request)
  • ML083010038  + (E-Mail Acceptance Review for License Amendment Request)
  • ML083400037  + (E-Mail Acceptance Review for License Amendment Request)
  • ML11102A016  + (E-Mail Acceptance Review for TSTF-361-A RHR Lop Testing (TAC ME5853/ME5854))
  • ML082120168  + (E-Mail Acceptance Review of 7-10-2008 Application to Revise Technical Specification 5.5.6)
  • ML082170768  + (E-Mail Acceptance Review of License Amendment Request Lic 08-0078, Administrative Revisions to Technical Specifications to Correct Typographical Errors and Provide Clarification)
  • ML22164A792  + (E-Mail Acceptance for Formal Review of DCS Iato and PTS Iato Request)
  • ML21172A270  + (E-Mail Acceptance of Application - Risk Informed Completion Times in Accordance with TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b,)
  • ML082310090  + (E-Mail Acceptance of Relief Request 2RR07)
  • ML19009A419  + (E-Mail Acknowledgement of Receipt of Cimarron Dp)
  • ML19261B564  + (E-Mail Acknowledgement of Receipt of Comment from Jennifer Shang on Peach Bottom Subsequent License Renewal Draft Supplemental EIS, NUREG-1437, Supplement 10, Second Renewal, Draft)
  • ML16312A345  + (E-Mail Aerotest Operations, Inc. and Nuclear Labyrinth LLC, Providing Clarification on Non-Proprietary Treatment of Certain Financial Information, and a Correction to License Transfer Proposed Technical Specifications)
  • ML052060227  + (E-Mail Akstulewicz, NRR, to Ennis, NRR, VY EPU RAIs)
  • ML050840104  + (E-Mail Allegations@Nrc.Gov to Individual Sensitive Allegation Material)
  • ML18037B071  + (E-Mail Approval for Credit for Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours)
  • ML20364A049  + (E-Mail Approving Centrus/Aco Request to Modify Escort Ratio for the Piketon Facility)
  • ML21097A041  + (E-Mail Attachment - Copy of Federal Register Notice Vol. 82, No. 20 2-2-2021, Page 7885)
  • ML090560022  + (E-Mail Attachment - Draft RAIs D. C. Cook Unit 1 Relief Request (ISIR-28) Associated with Weld Inlays as an Alternate Repair Technique (MD9997))
  • ML19074A256  + (E-Mail Attachment: Scan of Wd Letter to NRC (2/29/2019, E-Mail from M. Conroy/Dot to N. Garcia-Santos/NRC Withdrawal of Russian Certificate of Approval for Model No. TK-C69 (Docket No. 71-3093)))
  • ML050830350  + (E-Mail B. Kemp, NMC, to H. Chernoff, NRR, May 11 Rev 2. Ppt W/Att Slides Conference Call, May 11, 2004)
  • ML051730318  + (E-Mail Backlogged follow-up RAIs for the Aging Management of Auxiliary Systems for NMP1 and NMP2 LRA)
  • ML050830309  + (E-Mail C. Haefke, NMC, to R. Anderson, NMC, Et Al., Pbnp Outage Status Report for Sunday, April 4)
  • ML082690556  + (E-Mail Change in Regulatory Commitment)
  • ML19361A163  + (E-Mail Closeout LTR-19-0390)
  • ML040560618  + (E-Mail Comments on TIA 2003-05)
  • ML053410007  + (E-Mail Concerning Ward Center for Nuclear Studies at Cornell University Decommissioning Plan Appendix B)