Letter Sequence Other |
|---|
|
Results
Other: ML23061A188, ML23299A293, ML23299A295, ML23299A296, ML24051A030, ML24051A031, ML24060A094, ML24183A064, ML24240A123, ML24261B950, ML24261B957, ML24323A111, ML24338A002, ML25211A204, ML25211A209
|
MONTHYEARML23073A0652023-03-21021 March 2023 E-mail - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23073A0692023-03-21021 March 2023 Form 897 - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23061A1892023-03-23023 March 2023 NRC Slides - March 23, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines Project stage: Meeting ML23061A1882023-04-20020 April 2023 Summary of Discussion Between the U.S. Nuclear Regulatory Commission and Electric Power Research Institute Regarding Submittal of BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines, Revision 2 Project stage: Other ML23298A0782023-10-25025 October 2023 EPRI, BWRVIP-138, Revision 2: BWR Vessel and Internals Project, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Project stage: Request ML23299A2952023-12-13013 December 2023 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 898, Completeness Review Project stage: Other ML23299A2932024-01-0303 January 2024 E-Mail - U. S. Nuclear Regulatory Commission Completion Determination Form 898 and Withholding Determination Form 897 for BWRVIP-138, Revision 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Other ML23299A2962024-01-0303 January 2024 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 897, Withholding Determination Project stage: Other ML24051A0312024-01-30030 January 2024 Terrapower - Audit Summary Report Letter - Principal Design Criteria Project stage: Other ML24051A0302024-01-30030 January 2024 Enclosure - Terrapower - Audit Summary Report - Principal Design Criteria Project stage: Other ML24023A6902024-02-29029 February 2024 Electric Power Research Institute Regulatory Audit in Support of Review of BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Approval ML24183A0642024-07-11011 July 2024 Nonproprietary- EPRI Report 3002023754, BWRVIP-138, BWR Vessel and Internals Project, Updated Jet Pump Bean Inspection and Flaw Evaluation Guidelines, Revision 2, Final RAIs Project stage: Other ML24183A0392024-07-11011 July 2024 E-mail - Final Request for Additional Information - BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: RAI ML24261B9502024-09-17017 September 2024 EPRI Informs the NRC Staff of a Delay in Submitting the RAI Responses from October 9, 2024, to November 15, 2024 Project stage: Other ML24261B9572024-09-20020 September 2024 Change in Estimated Review Schedule for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Other ML24240A1232024-10-0101 October 2024 Non-Proprietary - Enclosure 2 - Report Regarding March 4 -29, 2024, Regulatory Audit for EPRI Technical Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 (EPID L-2023-NTR-0007) - Non-Proprietary Project stage: Other ML24060A0942024-10-0101 October 2024 Report Regarding March 4-29, 2024, Regulatory Audit for Electric Power Research Institute Technical Report Boiling Water Reactor Vessel Internals Program (BWRVIP)-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revisio Project stage: Other ML24295A2122024-10-16016 October 2024 Transmittal of MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Barrel Weld Material for Information Only Project stage: Request ML24295A2142024-10-16016 October 2024 EPRI - Request for Withholding of the the Following Commercial Document: MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Weld Material, EPRI Id 30 Project stage: Request ML24323A1112024-11-15015 November 2024 BWRVIP-138 Revision 2 RAIs - Short Delay Project stage: Other ML24338A0022024-11-18018 November 2024 EPRIs Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: Other ML24338A0012024-11-18018 November 2024 NRC Staff Request Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: RAI ML25028A1032025-02-28028 February 2025 E-Mail: Draft Safety Evaluation Associated for EPRI Report BWRVIP 138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Revision 2 Project stage: Draft Approval PMNS20250708, Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 22025-06-0202 June 2025 Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval ML25157A0592025-06-0606 June 2025 NRC Response to Epri’S Request to Reconsider the Conditions in the Draft Safety Evaluation for EPRI Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval ML25160A0132025-06-0606 June 2025 EPRIs Acceptance of Changes in and Indication of No Meeting Needed for Safety Evaluation for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Meeting ML25211A2042026-01-12012 January 2026 E-Mail - Transmittal of the Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Other ML25211A2092026-01-12012 January 2026 NRC Form 896, -A Topical Report Verification for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Other 2024-11-15
[Table View] |
E-Mail - Transmittal of the Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2| ML25211A204 |
| Person / Time |
|---|
| Site: |
99902016 |
|---|
| Issue date: |
01/12/2026 |
|---|
| From: |
Lois James Licensing Processes Branch |
|---|
| To: |
Bonifanti M, Palm N Electric Power Research Institute |
|---|
| References |
|---|
| BWRVIP-138, EPID L-2023-TOP-0020 (Pre-app), EPID L-2023-TOP-0053 pre fee exem, EPID L-2023-NTR-0007 post fee exem |
| Download: ML25211A204 (0) |
|
Text
1 Lois James From:
Lois James Sent:
Monday, January 12, 2026 1:49 PM To:
'martin.bonifanti@constellation.com'; Palm, Nathan Cc:
RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Jennie Rankin; Angie Buford; John Wise; 'David.Rudland@nrc.gov'; John Tsao;
'wmcgruder@epri.com'; 'npalm@epri.com'; 'drouse@epri.com'; 'npalm@epri.com';
'mwalter@epri.com'
Subject:
Transmittal of the Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 (EPID L-2023-NTR-0007)
Attachments:
BWRVIP-138 Revision 2-A - NRC 896 -A Topical Report Verification 01-05 final with updated ML numbers.pdf Martin Bonifanti, Constellation, BWRVIP Chairman Nathan Palm, EPRI, BWRVIP Program Manager 1300 West W.T. Harris Blvd Charlotte, NC 28262-8550 Martin Bonifanand Nathan Palm:
Attached please "nd the completed U.S. Nuclear Regulatory Commission (NRC) Form 896, -A Topical Report Veri"cation, for the Electric Power Research Institutes (EPRIs) Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 If you have any questions, please feel free to contact me via email Lois.James@nrc.gov.
Sincerely, Lois M. James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Oice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Docket No. 99902016 ADAMS Accession Nos.: ML25211A191 (Pkg); ML25211A204 (E-mail); ML25211A209 (Form 896);
Concurrence (ML26012A339)