ML050830309

From kanterella
Jump to navigation Jump to search
E-Mail C. Haefke, NMC, to R. Anderson, NMC, Et Al., Pbnp Outage Status Report for Sunday, April 4
ML050830309
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/04/2004
From: Haefke C
Nuclear Management Co
To: Richard Anderson, Morris M, Spaulding D
Office of Nuclear Reactor Regulation, Nuclear Management Co
References
FOIA/PA-2004-0282
Download: ML050830309 (4)


Text

Deirdre Spaulding - PBNP Outage Status Report for Sunday, April 4 Paqe 11 I

From:

"Haefke, Cindy" <Cindy.Haefke@nmcco.com>

To:

"Anderson, Rob " <Rob.Anderson~nmcco.com>, "Bohn, Lyle H."

<Lyle.Bohn~nmcco.com>, "Breene, Thomas" <Thomas.Breene~nmcco.com>, *Cooper, Douglas E."

<DOUGLAS.COOPER@nmcco.com>, "CY Planner" <CY-Planner~we-energies.com>, "Deirdre Spaulding" <DWS~nrc.gov>, "Graham, Richard S." <Richard.GrahamOl @nmcco.com>, "Harden, Paul A." <PAUL.HARDEN2@nrmcco.com>, "Hennessy, Felicia" <Felicia.Hennessy nmcco.com>, "Malone, Daniel J." <DANIEL.MALONE2@nnmcco.com>, "McCarthy, James" <James.McCarthy~nmcco.com>,

"Mike Morris" <rmm3@nrc.gov>, "NRC3" <pgkl @nrc.gov>, "Palmisano, Thomas J."

<Thomas.Palmisano nmcco.com>, "Pelnar, Anne" <Anne.Pelnarnmcco.com>, "Rathsack, Kathy"

<Kathy.Rathsack@nmcco.com>, "Schoon, Duane" <Duane.Schoon @ nmcco.com>, "Sellman, Michael B."

<Michael.Sellman nmcco.com>, "Shaw, Jim D." <Jim.Shaw nmcco.com>, "Solymossy, Joseph M."

<Joseph.Solymossy© nmcco.com>, "Sorensen, Joel P." <Joel.Sorensen @ nmcco.com>,

"VanMiddlesworth, Gary " <Gary.VanMiddlesworth@nmcco.com>, "Vitcenda, Mary E.'

<Mary.Vitcenda @ nmcco.com>, "Weaver, Dave" <Dave.Weaver@we-energies.com>, "Weinkam, Edward J." <Edward.Weinkam nmcco.com>, "Werner, Michael D." <Michael.Werner nmcco.com>, "Wilson, David L." <David.Wilson@rnmcco.com>

Date:

4/4/04 6:09AM

Subject:

PBNP Outage Status Report for Sunday, April 4

lDideSpaulding - Outage Daily Status Report 04-04-1.doc e

S n Page 1 l I

NMC Co.'mmirted to Almwkv Extent Daily Outage Status Report Plant/Unit Point Beach / Unit 1 Outage Start Date 4/03/04 Day 1

of Type:

Planned Refueling Today's Date / Time 4/04/04 0400 28 of Outage Number U1R28 Forced I Safety Status (include summary level cause, assessment, and associated actions)

I Industrial OSHA Recordables in 0

last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Total for this outage 0

First Aid cases in 0

last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Significant near 0

misses Summary:

None Radiological Dose outage to date 1.875 Difference 0.076 Projected to date 1.951 Outage Goal Number of PCEs

  • 75 R 0

Summary.

Dose reported at 1800 on 4/03/04 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

None Plant Status 1

Mode 5-Cold Shutdown RCS Temperature 165 Pressure 290 Time to Boil:

N/A Minutes/Hours Time to core uncover:

Overall site safe shutdown color:

Green Reactivity Green Core Cooling Green Inventory Green Containment Green Protected Equipment Train No Protected Equipment due to SSA N/A RX Vessel Level N/A Hours Power Availability Green Fuel Pool Cooling Green Revised April 3, 2004 Page 1 of 3

l Deirdre Spauldigg - Outage Daily Status Report 04-04-1.doc

_Paqe 2 1 Outage Status Overall status of outage schedule:

Behind Ahead 10 Hours Summary of hours gained or lost and summary of last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Boration dificulties (leakage to C HUT) - 1.5 Hour Loss IT-240 Si Accumulator Valve Test - 1 Hour Gain Cooldown of Pressurizer - 1 Hour Loss Letdown Gas Stripper -7.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Loss (estimated)

Critical Path/Major Activities Major Work Activities completed in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RCS System Walkdowns RCS Cooldown to 370 IT-240 Si Accumulator Valves Isolated SI Accumulators Cooldown RCS to 340 Established LTOP Placed RHR Inservice RCS Solid & Prz Cooldown ROS Cooldown to Mode 5 Secured Last MFP Major Work Activities NOT completed or delayed as planned Retest of 1 Sl-845A SI System Check Valve Replacement RCS Degassing Upcoming Major Work Activities RCS Degassing Cooldown RCS to 100 H202 - Crud Burst Initiation Containment Hatch Interlock Defeated H202 Crud Burst Cleanup Secure Last RCP Start Containment Purge Establish RHR Letdown Vent A Accumulator to Containment

  • A S/G Safety Valve Header Machining Depressurize the RCS Start A RCP Motor Work Drain Pressurizer to 25%
  • B Train EFSAS Test I Major Milestones/Outage Projects l

Critical Rev 0 Current Original Current Action to be Change in Path/Near Schedule Schedule Float Float taken Last 24 Critical Path Date/Time Date/Time Hours Revised April 3, 2004 Page 2 of 3

Deirdre Spaulding -. Outage Daily Status Report 04-04-1.doc PaQe3,I I Deirdre §paulding -,Putage Daily Status Report 04-04-1.doc Page 3 I J

H202 Crud 04/04/04 0800 04/04/04 1800 0

-10 None

-8 Burst Cleanup ORT 3B 4/04/04 4/04104 0

-10 Preps

-8 ESFAS 1900 0500 working In Parallel ORT 3A 4105/04 4105104 0

-10 Preps Follow

-8 ESFAS 1900 0500 B ESFAS Recovery ESFAS 4/06/04 4/06/04 0

-10 None

-8 TESTING 0700 1900 COM PLETE Emergent Issues in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Issue Impact Recovery Assigned Expected Resolution Date Efforts to S/G Blowdown Tank Maintenance Resources Package Krentz 4/05/04 Leak Prep Letdown Gas Stripper Delay RCS Cooldown Degas RCS Garot 4/04/04 l Action/Commitments/Follow-Up (Remove when resolved/completed)

Date Action/issue Plan to Resolve Assigned to Due Date Fleet Issued Assist Needed?

4/02/04 Incorporate Lessons Revise XL-10 J.A. Schroeder 4/06/04 No Learned on Initial Lighting Panel Down 1800 down power of XL-10 Power procedure prior to restoration Revised April 3, 2004 Page 3 of 3