Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2000-17, Crack in Weld Area of Reactor Coolant System Hot Leg Piping at V.C. Summer + (Crack in Weld Area of Reactor Coolant System Hot Leg Piping at V.C. Summer)
- Information Notice 2010-21, Crack-Like Indication in the U-bend Region of a Thermally Treated Alloy 600 Steam Generator Tube + (Crack-Like Indication in the U-bend Region of a Thermally Treated Alloy 600 Steam Generator Tube)
- Information Notice 2013-11, Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes + (Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes)
- ML20128E263 + (Cracked Disc Retaining Nuts in Target Rock Corp Manual & Motor Operated Valves)
- Information Notice 1996-52, Cracked Insertion Rods on Troxler Model 3400 Series Portable Moisture Density Gauges + (Cracked Insertion Rods on Troxler Model 3400 Series Portable Moisture Density Gauges)
- Information Notice 1992-63, Cracked Insulators in Asl Dry Type Transformers Manufactured by Westinghouse Electric Corporation + (Cracked Insulators in Asl Dry Type Transformers Manufactured by Westinghouse Electric Corporation)
- ML19321B306 + (Cracking & Relocation of U Dioxide Fuel During Initial Nuclear Operation)
- ML23354A246 + (Cracking Assessment for Framatome RSG Channel Head Assembly)
- Information Notice 2008-07, Cracking Indications In Thermally Treated Alloy 600 Steam Generator Tubes And Tube-To-Tubesheet Welds + (Cracking Indications In Thermally Treated Alloy 600 Steam Generator Tubes And Tube-To-Tubesheet Welds)
- ML060590290 + (Cracking Indications in Core Shroud Tie Rods)
- Information Notice 2008-07, Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds + (Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds)
- Information Notice 1980-38, Cracking in Charging Pump Casing Cladding + (Cracking in Charging Pump Casing Cladding)
- Information Notice 1991-28, Cracking in Feedwater System Piping + (Cracking in Feedwater System Piping)
- ML14006A005 + (Cracking in KCR-13 Standby Battery Jars)
- Information Notice 1979-37, Cracking in Low Pressure Turbine Discs + (Cracking in Low Pressure Turbine Discs)
- Information Notice 2004-11, Cracking in Pressurizer Safety and Relief Nozzles and in Surge Line Nozzle + (Cracking in Pressurizer Safety and Relief Nozzles and in Surge Line Nozzle)
- Information Notice 1994-42, Cracking in the Lower Region of the Core Shroud in Boiling-Water Reactors + (Cracking in the Lower Region of the Core Shroud in Boiling-Water Reactors)
- Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head + (Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head)
- Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines + (Cracking of Flywheels on Cummins Fire Pump Diesel Engines)
- Information Notice 1998-11, Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants + (Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants)
- Information Notice 1987-30, Cracking of Surge Ring Brackets in Large General Electric Company Electric Motors + (Cracking of Surge Ring Brackets in Large General Electric Company Electric Motors)
- Information Notice 1992-50, Cracking of Valves in the Condensate Return Lines of a BWR Emergency Condenser System + (Cracking of Valves in the Condensate Return Lines of a BWR Emergency Condenser System)
- Information Notice 1997-17, Cracking of Vertical Welds in the Core Shroud and Degraded Repair + (Cracking of Vertical Welds in the Core Shroud and Degraded Repair)
- Information Notice 1990-04, Cracking of the Upper Shell-to-Transition Cone Girth Welds in Steam Generators, + (Cracking of the Upper Shell-to-Transition Cone Girth Welds in Steam Generators,)
- 05000373/LER-1983-006-01, Cracks Discovered in MSIV 1B21-F028A Drain Line Weld.Caused by Improper Weld Application.Weld Repaired.New Weld Ground Down to Eliminate Notches Between Passes & Magnetic Particle Tested + (Cracks Discovered in MSIV 1B21-F028A Drain Line Weld.Caused by Improper Weld Application.Weld Repaired.New Weld Ground Down to Eliminate Notches Between Passes & Magnetic Particle Tested)
- Information Notice 1997-02, Cracks Found in Jet Pump Riser Assembly Elbows at Boiling Water Reactors + (Cracks Found in Jet Pump Riser Assembly Elbows at Boiling Water Reactors)
- Information Notice 1988-03, Cracks in Shroud Support Access Hole Cover Welds + (Cracks in Shroud Support Access Hole Cover Welds)
- Information Notice 1987-26, Cracks in Stiffening Rings on 48-Inch-Diameter UF6 Cylinders + (Cracks in Stiffening Rings on 48-Inch-Diameter UF6 Cylinders)
- Information Notice 1987-26, Cracks in Stiffening Rings on 48-Inch-Diameter Uf6 Cylinders + (Cracks in Stiffening Rings on 48-Inch-Diameter Uf6 Cylinders)
- ENS 41090 + (Cracks/Fissures in Power Air Purifying Respirators (Papr) Motor/Blower Assembly Casings)
- ML20209A669 + (Cracuk Model Description (Apps to CRAC2 Model Description))
- ML16343B068 + (Craft Combined Reply to DTE and NRC)
- ML14261A256 + (Craft Confirmation of Consultation with Parties Regarding Extension Request)
- ML14307A793 + (Craft Motion to Regroup Contentions for Oral Arguments)
- ML15091A780 + (Craft Request for Change of Venue)
- ML14259A196 + (Craft Request for Extension of Time to Reply to NRC Staff and DTE Responses to Its Petition to Intervene and Request for Hearing)
- ML20034G128 + (Craft2-RELAP5/MOD2 Comparison for Small Break LOCA Analysis)
- ML15181A242 + (Crafts Initial Disclosures)
- ML15054A589 + (Crafts Notice of Intent to Participate as a Party)
- ML053070307 + (Crait Issues)
- ML13207A244 + (Crane Amendment Safety Evaluation, Units 1 and 2)
- ML25077A097 + (Crane Clean Energy Center - Environmental Presentation - 3-20-25)
- ML25077A302 + (Crane Clean Energy Center - Environmental Presentation - 3-20-25 Updated)
- ML25227A244 + (Crane Clean Energy Center - Final RAI for Request to Use Subsequent Edition of ASME BPV Code for NDE and R&R Activities)
- ML25148A129 + (Crane Clean Energy Center - Presentation for New Fuel Receipt Pre-submittal Meeting)
- ML25178C663 + (Crane Clean Energy Center - Presentation for Pre-submittal Meeting on Planned LAR to Restore Operating License and TS)
- ML25210A355 + (Crane Clean Energy Center - Presentation for July 31, 2025, Public Outreach Meeting)
- ML25279A004 + (Crane Clean Energy Center - Presentation for October 9, 2025, Pre-submittal Meeting on Planned Emergency Plan Restoration License Amendment Request)
- ML25142A032 + (Crane Clean Energy Center PM Change Letter)
- ML25114A121 + (Crane Clean Energy Center/Three Mile Island Unit 1 Restart Inspection Plan)
- ML20054G419 + (Crane Design Evaluation for Crystal River Unit 3: Comparison to NUREG-0612)