Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23053A050 + (Cover Memo and Response to C-10 Questions Regarding 3Q2022 Inspection Report)
- ML19305A298 + (Cover Memo for Responses to Wma C NRC RAIs)
- ML22353A549 + (Cover Memo for the Pre-application Audit Summary Report for the Potential Clinch River Construction Permit)
- ML21039A575 + (Cover Memo for the Scoping Summary Report for the Review and Update of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437))
- ML13269A208 + (Cover Memo from B. Caldwell to M. Markley RAI for Arkansas Nuclear One (ANO) Revision 15 Security Plan Review)
- ML13275A310 + (Cover Memo from Robert Caldwell to Robert Pascarelli, RAI for V C Summer Revision 10 Security Plan Review)
- ML071200295 + (Cover Memo to Safety Evaluation by the Office of Nuclear Reactor Regulation - Direct Transfer of License from Nuclear Management Company, LLC & Wisconsin Electric Power Company to FPL Energy Point Beach, LLC (TAC MD4112 & TAC MD4113))
- ML051660147 + (Cover Memorandum, Staff Pilot Plant Audit Report, Crystal River Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution)
- ML032820042 + (Cover Page Abbreviated, Etc. - Safety Evaluation Report with Open Items Related to the License Renewal of the R.E. Ginna Nuclear Power Plant)
- ML20058F268 + (Cover Page for Containment Liner Test Channels at Beaver Valley Power Station - Unit 2)
- ML20199D751 + (Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal)
- ML20006E729 + (Cover Page of Final SALP Repts 50-295/89-01 & 50-304/89-01 for June 1988 - Sept 1989 & Summary of 900104 Meeting W/ Util)
- ML20070U362 + (Cover Page to Rev 1 to Issue 2 to Nuclear Security Training & Qualification Plan)
- ML20079M939 + (Cover Page to Southeastern Nearshore Lake Michigan,Impact of DC Cook Nuclear Plant)
- ML20265B857 + (Cover Plate Source Mount)
- ML20265B686 + (Cover Preamp)
- ML062220515 + (Cover Sheet - Warning - Investigative Material - St. Lucie Termination & Violation)
- ML062220530 + (Cover Sheet - Warning - Investigative Material - St. Lucie Accurate Response)
- ML030430032 + (Cover Sheet Application for Allowance & Payment of Interim Compensation & Reimbursement of Expenses for December 1 Through December 31, 2002)
- ML20199D545 + (Cover Sheet for Proposed Rule 10CFR40, U Mill Tailings: Groundwater Protection & Other Issues;Refs for Supplementary Info:Ix.B Costs & Benefits of Mods)
- ML19305A468 + (Cover Sheet of Transcript of 790517 Second Meeting of Presidents Commission on Accident at TMI in Middletown,Pa. Pp 1-42)
- ML20214K318 + (Cover Sheet to Resident Insp Rept 50-293/86-14 on 860419- 0602.Violations Noted:Failure to Take Prompt Corrective Action in Response to QA Findings & Failure to Control Calibr of Measuring & Test Equipment)
- ML20198B403 + (Cover Sheet to Rev 6 of MP 704.1, Control Rod Drive HCU Water - Nitrogen Accumulator Maintenance)
- ML20263Q133 + (Cover Sheet:General Notes,Symbols and Reference Drawings)
- ML20263F517 + (Cover Sheet:Notes and Details for Separation of Class IE Equipment and Circuits)
- ML20266D495 + (Cover Smoke Alarm First Used Ei 100SN.Sheet 1 of 1)
- ML20266D484 + (Cover Smoke Alarm.Sheet 1 of 5)
- ML20266D507 + (Cover Smoke Alarm.Sheet 1 of 5)
- ML20266D672 + (Cover Smoke Alarm.Sheet 2 of 5)
- ML20266D677 + (Cover Smoke Alarm.Sheet 3 of 5)
- ML20266D640 + (Cover Smoke Alarm.Sheet 3 of 5)
- ML20266D644 + (Cover Smoke Alarm.Sheet 4 of 5)
- ML20266D681 + (Cover Smoke Alarm.Sheet 4 of 5)
- ML20266D492 + (Cover Smoke Alarm.Sheet 5 of 5)
- ML20266D512 + (Cover Smoke Alarm.Sheet 5 of 5)
- ML20265B199 + (Cover Styline.Sheet 1 of 4)
- ML20265B154 + (Cover Styline.Sheet 2 of 4)
- ML20265B204 + (Cover Styline.Sheet 3 of 4)
- ML20265B208 + (Cover Styline.Sheet 4 of 4)
- ML20261M919 + (Cover for Waste Storage Bin M 4. Sheet 2 of 2.No Rev Date)
- ML22334A262 + (Cover letter- Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package)
- ML23024A177 + (Cover letter- Certificate of Compliance No. 9380, Rev. No. 2, for the Model No. Traveller Std & Xl Package)
- ML23349A181 + (Cover letter- Certificate of Compliance No.. 9374, Rev. No. 2, for the Model No. HI-STAR 80 Package)
- ML22131A321 + (Cover letter-Certificate of Compliance No. 9358, Revision No. 6 for the Model No. TN-LC Package)
- ML20343A189 + (Cover, Table of Contents and Introduction)
- ML20266D636 + (Cover,Smoke Alarm.Sheet 2 of 5)
- ML20265D309 + (Cover.Sheet 1 of 1)
- ML20035G139 + (Coversheet of MC&A Safeguards Insp Rept 70-1113/93-201 on 930322-26.Violations Noted.Major Areas Inspected:Mc&A Sys Mgt & Assessment,Internal Controls,Measurement Sys, Measurement Control & Records & Repts)
- ML20141L795 + (Covid 19 Preparedness Assessment NRC Letter Region III, 5.19.20)
- EPID:L-2020-LLE-0229 + (Covid 19 Preparedness Assessment NRC Letter Region III, 5.19.20)
- ML22116A124 + (Covid 19 Public Health Emergency Lessons Learned and Best Practices Meeting Summary)
- ML21139A116 + (Covid LL_Part2_May 2021_20210518)