Text
-
-
g
.
.; . , * -
. ;s :
,
^i
.
- - i'
,
41
Enclosure 1.
SALP 8
-j
FINAL SALP REPORT-
i
'
)-
.
..
U. S. NUCLEAR REGULATORY COMMISSION
'
REGION III
'
,
SYSTEMATIC ASSESSMENT'0F LICENSEE PERFORMANCE
F
s
50-295/89001; 50-304/89001
Inspection Report Nos.
t
. Commonwealth Edison Compay
Name of Licensee
Zion Station, Units 1 and 2
.
Name of. Facility
June 1, 1988 through September 30, 1989
Assessment Period
.
t
--
i
9002260283 900209,3
pa
aoOcx 030002
'
PNU
- a
i
.
.
. ..
-
,
.
.
_.
.
.
_ . _ _ _ _ . -_
__
_,
.
,
,
... .
.r
l
.er
- I,
Enclosure 1
]
Zion Units 1 and 2
A.
Sussnary of Meetug with Commonwealth Edison Company on January 4.1990
The findings and conclusions of.the SALP Board are documented in
Report No. 50-295/89001; 50-304/89001 and were discussed with the
1
licensee on' January 4,1990, at Zion, Illinois..
While the meeting was primarily a discussion between the licensee
,
'
and NRC, it was open to members of the public as observers.
e
,
The following licensee and NRC personnel were in attendance.
- 1
1
Commonwealth Edison Company
l
t:
.
1:
B. Thomas, President-
.
C. Reed, Senior Vice President, Nuclear Operations
1
-T. J. Maiman, Vice President, PWR Operations
'
K. L. Graesser, General Manager, PWR Operations
l
T. Joyce, Plant Manager, Zion
Nuclear Regulatory ' Commission
1'
.
.
=
.A. B. Davis,-Regional Administrator, RIII
,
,
E._G. Greenman, Director, Division of Reactor Projects, RIII
L
W. D. Shafer, Chief, Branch 1, Division of Reactor-Projects, RIII
J..M. Hinds, Chief, Section 2A, Division of Reactor Projects, RIII
'
,
J. W. Craig, Director, Project Directorate III-1, NRR
J. D.-Smith, Senior Resident Inspector, Zion
R. J..Leemon, Resident Inspector, Zion
A. M. Bongiovanni, Resident Inspector, Zion
B.
Comments Received from Licensee
Commonwealth Edison Company's January 25, 1990 response to the Zion
i
Initial SALP 8 Report included several comments that have resulted in
a minor revision to the Initial SALP Report. This change is listed
in Enclosure (2), Revision sheet, and the revised page is included as
Enclosure (3).
Replace the page in error listed in Enclosure 2 Revision Sheet, with the .
,
corrected page attached in Enclosure 3 into your copy of the Initial SALP
,
Report. When corrected pages are included, the Initial SALP Report should
be considered the Final SALP Report.
C.
Regional Administrator's Conclusions Based on Consideration of Licensee
Comments
I have concluded that the overall ratings in the affected areas have not
changed.
=
-
-
-
- - -