ML20006E729

From kanterella
Jump to navigation Jump to search
Cover Page of Final SALP Repts 50-295/89-01 & 50-304/89-01 for June 1988 - Sept 1989 & Summary of 900104 Meeting W/ Util
ML20006E729
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/09/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20006E715 List:
References
50-295-89-01-01, 50-295-89-1-1, 50-304-89-01, 50-304-89-1, NUDOCS 9002260283
Download: ML20006E729 (2)


See also: IR 05000295/1989001

Text

-

-

g

.

.; . , * -

. ;s :

,

^i

.

- i'

,

41

Enclosure 1.

SALP 8

-j

FINAL SALP REPORT-

i

'

)-

.

..

U. S. NUCLEAR REGULATORY COMMISSION

'

REGION III

'

,

SYSTEMATIC ASSESSMENT'0F LICENSEE PERFORMANCE

F

s

50-295/89001; 50-304/89001

Inspection Report Nos.

t

. Commonwealth Edison Compay

Name of Licensee

Zion Station, Units 1 and 2

.

Name of. Facility

June 1, 1988 through September 30, 1989

Assessment Period

.

t

--

i

9002260283 900209,3

pa

aoOcx 030002

'

PNU

  • a

i

.

.

. ..

-

,

.

.

_.

.

.

_ . _ _ _ _ . -_

__

_,

.

,

,

... .

.r

l

.er

I,

Enclosure 1

]

Zion Units 1 and 2

A.

Sussnary of Meetug with Commonwealth Edison Company on January 4.1990

The findings and conclusions of.the SALP Board are documented in

Report No. 50-295/89001; 50-304/89001 and were discussed with the

1

licensee on' January 4,1990, at Zion, Illinois..

While the meeting was primarily a discussion between the licensee

,

'

and NRC, it was open to members of the public as observers.

e

,

The following licensee and NRC personnel were in attendance.

- 1

1

Commonwealth Edison Company

l

t:

.

1:

B. Thomas, President-

.

C. Reed, Senior Vice President, Nuclear Operations

1

-T. J. Maiman, Vice President, PWR Operations

'

K. L. Graesser, General Manager, PWR Operations

l

T. Joyce, Plant Manager, Zion

Nuclear Regulatory ' Commission

1'

.

.

=

.A. B. Davis,-Regional Administrator, RIII

,

,

E._G. Greenman, Director, Division of Reactor Projects, RIII

L

W. D. Shafer, Chief, Branch 1, Division of Reactor-Projects, RIII

J..M. Hinds, Chief, Section 2A, Division of Reactor Projects, RIII

'

,

J. W. Craig, Director, Project Directorate III-1, NRR

J. D.-Smith, Senior Resident Inspector, Zion

R. J..Leemon, Resident Inspector, Zion

A. M. Bongiovanni, Resident Inspector, Zion

B.

Comments Received from Licensee

Commonwealth Edison Company's January 25, 1990 response to the Zion

i

Initial SALP 8 Report included several comments that have resulted in

a minor revision to the Initial SALP Report. This change is listed

in Enclosure (2), Revision sheet, and the revised page is included as

Enclosure (3).

Replace the page in error listed in Enclosure 2 Revision Sheet, with the .

,

corrected page attached in Enclosure 3 into your copy of the Initial SALP

,

Report. When corrected pages are included, the Initial SALP Report should

be considered the Final SALP Report.

C.

Regional Administrator's Conclusions Based on Consideration of Licensee

Comments

I have concluded that the overall ratings in the affected areas have not

changed.

=

-

-

-

- - -