Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Const Completion Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NSD-NRC-97-5047, Consolidates Responses & Resolutions of Items Associated W/Ssar Chapter 7 for Application for AP600 Design Certification  + (Consolidates Responses & Resolutions of Items Associated W/Ssar Chapter 7 for Application for AP600 Design Certification)
  • NSD-NRC-97-5049, Consolidates Responses & Resolutions of Items Associated W/ SSAR Chapter 18 to Confirm Completion of Submittal of Final Documentation Re SSAR Chapter 18 of Application for AP600 Design Certification  + (Consolidates Responses & Resolutions of Items Associated W/ SSAR Chapter 18 to Confirm Completion of Submittal of Final Documentation Re SSAR Chapter 18 of Application for AP600 Design Certification)
  • ML20085H840  + (Consolidates Responses to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Svc Water Procedures & Training Program Reviews Will Be Completed within 6 Months of Completion of 1992 Refueling Outages)
  • ML20204D296  + (Consolidates for Discovery Purposes,Proc Re Subj Facils. Dates for Completion of Discovery & for Prehearing Conf Shall Apply to Both Proc.Lists Issues Adopted by the ASLB; Also Lists Discovery Procedures)
  • ML19327A587  + (Consolidation Proposal,Based on Intervenors Discussions. Addresses Emergency Planning,Psychological Stress,Hydrogen Control,Financial Issues,Inadequate Core Cooling & Class 9 Accidents)
  • ML19344A357  + (Consolidation Tests. Prepared for Bechtel Power Corp)
  • ML20070J284  + (Consolidation Theory and ITS Applicability to the Dewatering and Covering of Uranim Mill Tailings)
  • ML19338C386  + (Consolidation of Contentions Re Emergency Evacuation Plans. Alleges Failure of Environ Rept,Psar,Fes & SER to Comply W/ Regulations Re Evacuation During Class 9 Accidents. Designates Wj Schuessler as Lead Party)
  • NRC 2010-0135, Consolidation of License Renewal Regulatory Commitment 8 with Commitment 29 Reactor Vessel Lnternals Program Implementation  + (Consolidation of License Renewal Regulatory Commitment 8 with Commitment 29 Reactor Vessel Lnternals Program Implementation)
  • ML20082G114  + (Consolidation of Tailings)
  • ML19337A728  + (Const & Matl Verification Program, Final Rept)
  • ML20010B731  + (Const & Preoperational Terrestrial Ecological Monitoring Program, 1977-78 Annual Rept)
  • ML20010B740  + (Const & Preoperational Terrestrial Ecological Monitoring Program, Annual Rept 1978-79)
  • ML19220A718  + (Const Activities Involving Offsite Portions of Transmission Lines Should Be Suspended Pending Completion of NEPA Environ Review)
  • ML19206A815  + (Const Activities Involving Offsite Portions of Transmission Lines Should Be Suspended Pending Completion of NEPA Environ Review.Other Activities Need Not Be Suspended)
  • ML19326B076  + (Const Activities at Davis-Besse)
  • ML19199A478  + (Const Activities for Unit 2 Offsite Portions Should Be Suspended,But Onsite Portions Should Not.Forwards Pertinent Order to Show Cause & Discussion of Facts)
  • ML20134F787  + (Const Appraisal Team Insp Rept 50-461/85-30 on 850520-31 & 0610-21.Deficiencies Noted:Inadequate Control of Design Documents & Programs for Verification of Electrical Separation & Ineffective Control of Work Performed)
  • ML20151V035  + (Const Appraisal Team Insp Repts 50-498/85-21 & 50-499/85-19 on 851021-1101 & 12-22.Potential Enforcement Action Noted: Failure to Provide Adequate Interface Between Design Organizations (A/E) & NSSS)
  • ML20206Q989  + (Const Appraisal Team Insp Summary of Comanche Peak,Texas. Related Info Encl)
  • ML20092P210  + (Const Assessment Program)
  • ML20127D601  + (Const Assessment Program (Bcap) Independent Expert Overview Group (Ieog) First Interim Rept,Mar-Sept 1984)
  • ML20127D708  + (Const Assessment Program (Bcap) Independent Expert Overview Group (Ieog) Second Interim Rept,Oct-Dec 1984)
  • ML20115F178  + (Const Assessment Program Rept, Feb 1985)
  • ML20134Q089  + (Const Assessment Program,Independent Expert Overview Group, Fourth Interim rept,Apr-June 1985)
  • ML20150B285  + (Const Deficiency Rept CD-369-370/78-08 Re Support Forgings Exhibiting Charpy v-notch Energies Below Min Required by Original Spec.No Flaws Found Larger than Calculated Critical Flaw Size)
  • ML19259C699  + (Const Deficiency Rept on 790724:Westinghouse Informed Licensee That Seven Barton Steam Generator Level Transmitters Were from Lot That Failed Accuracy Test)
  • ML19248D340  + (Const Deficiency Rept on 790802:chattering of Underfrequency Relay Contacts Caused Auxiliary Relay to Chatter,Delaying Reactor Trip & Cooling Pump Trip Signals.Relay & Design Changes Being Implemented)
  • B12480, Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize Encl  + (Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize Encl)
  • ML19305D684  + (Const Effects Monitoring Annual Rept 781019-791018)
  • ML20125B838  + (Const Effects Monitoring Program)
  • ML20069Q377  + (Const Employee Monitoring Errata Rept)
  • ML20084M024  + (Const Implementation Overview,Weekly Rept 46,840423-27)
  • ML20084F839  + (Const Implementation Overview,Weekly Rept Number 34, for 840130-0203)
  • ML20084F894  + (Const Implementation Overview,Weekly Rept Number 35, for 840206-10)
  • ML20084F926  + (Const Implementation Overview,Weekly Rept Number 36, for 840210-17)
  • ML20084F906  + (Const Implementation Overview,Weekly Rept Number 37, for 840220-24)
  • ML20080F870  + (Const Insp Planning for Concrete Replacement. Related Info Encl)
  • ML19308D889  + (Const Insp Rept 50-302/71-05 on 711207-10.Noncompliance Noted:Improper Matl & Fabrication Certifications of Decay Heat Pumps & Reactor Bldg Spray Pumps & Failure to Properly Investigate,Document & Correct Containment Concrete Defects)
  • IR 05000330/1977002  + (Const Insp Rept 50-330/77-02 on 770228-0301.Noncompliance Noted:Failure to Rept Bulge Deficiency Per 10CFR50.55(e)(z). Related Info Encl)
  • ML20134A623  + (Const Insp Rept 50-389/73-01 on 731029-30.No Deficiencies Noted.Major Areas Inspected:Qa Activities)
  • IR 05000389/1974001  + (Const Insp Rept 50-389/74-01 on 740205-06.No Deficiencies Noted.Major Areas Inspected:Activities Associated W/Cp Application)
  • ML20151N898  + (Const Insp Repts 50-445/85-13 & 50-446/85-09 on 850823-0930. Violations Noted:Failure to Provide Protection of Equipment Stored in Place & Failure to Establish Procedures Re Control of Deleterious Matl Around Stainless Steel Piping)
  • ML20141P072  + (Const Insp Repts 50-445/85-14 & 50-446/85-11 on 851001-31. Violations Noted:Failure to Establish Written Procedures for Control & Accountability of Shipment of Original Design Records to S&W & Failure to Document Pipe Violations)
  • ML20199K977  + (Const Insp Repts 50-445/85-16 & 50-446/85-13 on 851101-30.No Violation or Deviation Noted.Major Areas Inspected:Const Deficiencies,Ie Bulletins,Qa Records,Electrical Penetrations & Electrical Insp & Installation Test Procedures)
  • ML20212P801  + (Const Insp Repts 50-445/86-01 & 50-446/86-01 on 851101-860131.No Violations or Deviations Noted.Major Areas Inspected:Pipe Supports/Restraints & Previous Insp Findings)
  • ML20209A367  + (Const Insp Repts 50-445/86-08 & 50-446/86-06 on 860401-0531. Violations & Deviations Noted:Failure to Audit Asme/Qa Program & Document Audits & Failure to Verify Correction of Deficiency in Audit Rept)
  • IR 05000445/1986020  + (Const Insp Repts 50-445/86-20 & 50-446/86-17 on 860701-0831.Violations Noted:Failure to Specify Documents/ Revs,Describe Work Operations & Failure of Qa/Qc to Adequately Monitor/Assure Traveler Sys Implementation)
  • ML20205L966  + (Const Insp Repts 50-445/86-20 & 50-446/86-17 on 860701-0831.Violations Noted:Failure to Specify Documents/ Revs,Describe Work Operations & Failure of Qa/Qc to Adequately Monitor/Assure Traveler Sys Implementation)
  • IR 05000445/1986025  + (Const Insp Repts 50-445/86-25 & 50-446/86-21 on 860901-30. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp Findings,Posting of NRC Regulations,Safety Injection Pipe Welding & Fire Protection/Prevention)