Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-80-260, Completes Review & Evaluation of IE Bulletin 80-19,Revision 1.Station Has Not Utilized mercury-wetted Relays in Logic Matrix of Reactor Protection Sys.No Further Action Required. Approx 20 Manhours Expended on Bulletin + (Completes Review & Evaluation of IE Bulletin 80-19,Revision 1.Station Has Not Utilized mercury-wetted Relays in Logic Matrix of Reactor Protection Sys.No Further Action Required. Approx 20 Manhours Expended on Bulletin)
- ML20059C815 + (Completes Review of 931130 Radiological & Engineering Assessment for Cameo Power Plant,Vicinity Property GJ-15609-CS.Finds DOE Supplemental Standards Appropriate)
- ML20062J755 + (Completes Review of Listed Repts Re Decontamination & Decommissioning of Multiple Failure,Waste Disposal & Plutonium Facility Bldgs,Nuclear Lake Site,Pawling, New York)
- ML20062J779 + (Completes Review of Listed Repts on Decontamination & Decommissioning of Multiple Failure,Plutonium Facility & Waste Disposal Bldgs.Based on Rept Data,Residual Contamination in Plutonium Facility Below NRC Guidelines)
- ML20035H575 + (Completes Review of Rev 5.2 to SONGS Emergency Plan Submitted 921214.Review Indicates Plan Meets Standards in 10CFR50.47(b) & 10CFR50,App E)
- ML19257C139 + (Completes Svc of State of Or,Exhibit M-7,received Into Record at 791228 Hearing on Motions.Forwards President Carter Executive Order & or Public Util Commissioner 781106 Order 78-23)
- ML20002E007 + (Completes Util 700911 Response to AEC Re Sensitized Stainless Steel Components within Primary Coolant Sys.Submits Max Stress Levels for components.C-E 710112 Rept 6460-A Re Stress Levels & Design Practices Encl)
- ML19220D055 + (Completion & Filing of High Energy Line Analyses Will Be Delayed Until July 1973)
- ML20023B666 + (Completion & Results of Phase I of NSCR Post-Damage Pulse Test Program for Full Flip Triga Core)
- ML20076E948 + (Completion & Results of Phase I of Nuclear Science Ctr Reactor Post-Damage Pulse Test Program for Full Flip Triga Core)
- ML022470289 + (Completion Information Provided for Order for Interim Safeguards & Security Compensatory Measures)
- ML031050425 + (Completion Information Provided for Order for Compensatory Measures Related to Access Authorization Dated January 7, 2003)
- ML031050423 + (Completion Information Provided for Order for Compensatory Measures Related to Access Authorization Dated, January 7, 2003)
- B19011, Completion Information Provided for the Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel Dated April 29, 2003 + (Completion Information Provided for the Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel Dated April 29, 2003)
- B18873, Completion Information Provided for the Order for Compensatory Measures Related to Access Authorization Dated January 7, 2003 + (Completion Information Provided for the Order for Compensatory Measures Related to Access Authorization Dated January 7, 2003)
- ML022470294 + (Completion Information for Order for Interim Safeguards & Security Compensatory Measures)
- ML010510164 + (Completion Letter)
- ML20324A618 + (Completion Letter - Documentation of the Completion of Required Action Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident)
- ML100550542 + (Completion List for NEI)
- ML20136C124 + (Completion Notice for Field Change Request 2329.1,Revision 1.Supporting Info Encl)
- ML18194A713 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.lll.c (Index Number 805))
- ML18194A711 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.ii.c (Index Number 802))
- ML18194A699 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.b (Index Number 807))
- ML18194A714 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.c (Index Number 808))
- ND-18-0814, Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b (Index Number 810) + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b (Index Number 810))
- ND-18-0817, Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.c (Index Number 811) + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.c (Index Number 811))
- ML18194A698 + (Completion Plan for Uncompleted ITAAC 3.3.00.07d.iii.b (Index Number 804))
- ML18038B859 + (Completion Rept for USI A-46, for Mar 1997)
- ML20151B713 + (Completion Rept of 1980 Wolf Park Mine Workings Well at Cotter Mill Site Area. Related Info Encl)
- ML032110454 + (Completion Response to Generic Letter 96-06 Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, San Onofre Nuclear Generating Station, Units 2 and 3)
- ML20247K894 + (Completion Review Rept for Remedial Action at Grand Junction,Co,Disposal Site (Cheney Reservoir Disposal Site))
- ML20237D458 + (Completion Review Rept for Remedial Action at Slick Rock,Co Umtra Project Sites)
- ML20140B973 + (Completion Review Rept for Remedial Action at Grand Junction,Co U Processing Site)
- ML20198K845 + (Completion Review Rept for Remedial Action at Rifle,Co U Mill Tailings Site)
- ML20211C407 + (Completion Review Rept for Remedial Action at Salt Lake City,Ut Vitro Processing Site U Mill Tailings Remedial Action Project Site)
- ML20211A171 + (Completion Review Rept for Remedial Action at Mexican Hat/ Monument Valley U Mill Tailings Remedial Action Project Site)
- ML081890193 + (Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01)
- ULNRC-05737, Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions, TAC No. ME2822 (LDCN 09-0039 Supplement) + (Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions, TAC No. ME2822 (LDCN 09-0039 Supplement))
- ULNRC-05731, Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions (LDCN 09-0039 Supplement) + (Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions (LDCN 09-0039 Supplement))
- TSTF-207 + (Completion Time for Restoration of Various Excessive Leakage Rates)
- ML24198A054 + (Completion Transfer Letter - Inficon 101 - Ssd 24-20)
- ML24198A042 + (Completion Transfer Letter - Inficon 102 & 103)
- ML24204A205 + (Completion Transfer Letter - Nrd 107, 108, 109- Ssd 24-29, 24-30, 24-31)
- ML24204A148 + (Completion Transfer Letter - Nrd 110, 111, and 112 - Ssd 24-34, 24-32, 24-33)
- ML24239A838 + (Completion Transfer Letter - Nrd LLC -106- Ssd 24-28)
- ML24236A698 + (Completion Transfer Letter - Nrd LLC -101, 102, 103, 104- Ssd 24-24, 24-25, 24-26, and 24-27)
- ML24204A163 + (Completion Transfer Letter - mb-microtec -101 - Ssd 24-23)
- ML18204A212 + (Completion Verification Reports for Mixed Oxide Fuel Fabrication Facility Under Construction in Aiken, South Carolina (Docket Number 70-3098))
- ML18352A926 + (Completion of 2018 Reactor Oversight Process Baseline Inspection Procedure Assessments and Review)
- ML041190326 + (Completion of Acceptance Review Regarding Stretch Power Uprate Application,)
- ML051250129 + (Completion of Acceptance Review Regarding Measurement Uncertainty Recapture Uprate Application)