Completion of Acceptance Review Regarding Stretch Power Uprate Application,
ML041190326
Person / Time
Site: Indian Point 
(DPR-026)
Issue date: 04/28/2004
From: Milano P
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Milano, P , NRR/DLPM, 415-1457
References
TAC MC1865
Download: ML041190326 (6)


Text

April 28, 2004 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

COMPLETION OF ACCEPTANCE REVIEW REGARDING STRETCH POWER UPRATE APPLICATION, INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 (TAC NO. MC1865)

Dear Mr. Kansler:

In letter dated January 29, 2004, as supplemented on April 12, 2004, Entergy Nuclear Operations, Inc. (ENO) submitted its application to increase the licensed thermal power level at Indian Point Nuclear Generating Unit No. 2 (IP2). The proposed amendment would allow the maximum authorized power level to be increased by 3.26% (stretch power uprate), from 3114.4 megawatts thermal (MWt) to 3216 MWt.

On March 9, 2004, the Nuclear Regulatory Commission (NRC) staff held a meeting with representatives from ENO to discuss the basic content and supporting information for the January 29 application. In response to the discussions in this meeting, ENO supplemented its application by a letter dated April 12, 2004.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of the application for IP2, which is based on the determination that sufficient information was provided to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that ENO has provided the necessary information for the staff to begin a detailed technical review. In the April 12 submittal, ENO provided additional clarifying and supporting information for balance of plant and reactor systems impacted by the power uprate to assist the staff with its detailed review. The NRC staff expects to complete the detailed review by your requested date of October 2004.

If you have any questions, please contact me at 301-415-1457.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247 cc: See next page

April 28, 2004 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

COMPLETION OF ACCEPTANCE REVIEW REGARDING STRETCH POWER UPRATE APPLICATION, INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 (TAC NO. MC1865)

Dear Mr. Kansler:

In letter dated January 29, 2004, as supplemented on April 12, 2004, Entergy Nuclear Operations, Inc. (ENO) submitted its application to increase the licensed thermal power level at Indian Point Nuclear Generating Unit No. 2 (IP2). The proposed amendment would allow the maximum authorized power level to be increased by 3.26% (stretch power uprate), from 3114.4 megawatts thermal (MWt) to 3216 MWt.

On March 9, 2004, the Nuclear Regulatory Commission (NRC) staff held a meeting with representatives from ENO to discuss the basic content and supporting information for the January 29 application. In response to the discussions in this meeting, ENO supplemented its application by a letter dated April 12, 2004.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of the application for IP2, which is based on the determination that sufficient information was provided to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that ENO has provided the necessary information for the staff to begin a detailed technical review. In the April 12 submittal, ENO provided additional clarifying and supporting information for balance of plant and reactor systems impacted by the power uprate to assist the staff with its detailed review. The NRC staff expects to complete the detailed review by your requested date of October 2004.

If you have any questions, please contact me at 301-415-1457.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247 cc: See next page Accession No.:ML041190326 OFFICE PDI-1/PM PDI-1/LA PDIII-1/LPM PDI-1/SC NAME PMilano SLittle TMcMurtray RLaufer DATE 04/23/04 04/21/04 04/23/04 04/23/04 OFFICIAL RECORD COPY

DISTRIBUTION:

PUBLIC PDI-1 Reading B. Sheron T. Marsh E. Leeds A. Howe J. Wermeil J. Hannon J. Calvo E. Imbro W. Bateman R. Laufer J. Uhle S. Coffin T. Chan L. Lund D. Solorio L. Raghavan E. Marinos R. Jenkins J. Tappert K. Manoly S. Weerakody R. Dennig D. Trimble P. Milano S. Little M. Barillas L. Lois F. Orr A. McMurtray J. Tatum H. Li G. Georgiev J. Cushing J. Quichocho J.Terrell J. Cai M. Hart N. Trehan R. Gallucci R. Lobel T. Mensah C-I. Wu J. Jolicoeur, OEDO B. McDermott, R-I C. Bixler, R-I OGC OPA ACRS

Indian Point Nuclear Generating Unit No. 2 cc:

Mr. Gary Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Fred Dacimo Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Christopher Schwarz General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Dan Pace Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Randall Edington Vice President Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P. O. Box 249 Buchanan, NY 10511-0249 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Indian Point Nuclear Generating Unit No. 2 cc:

Senior Resident Inspector, Indian Point 2 U. S. Nuclear Regulatory Commission 295 Broadway, Suite 1 P.O. Box 38 Buchanan, NY 10511-0038 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Dan C. Poole PWR SRC Consultant 20 Captains Cove Road Inglis, FL 34449 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Alex Matthiessen Executive Director Riverkeeper, Inc.

25 Wing & Wing Garrison, NY 10524 Mr. Paul Leventhal The Nuclear Control Institute 1000 Connecticut Avenue NW Suite 410 Washington, DC, 20036 Mr. Karl Coplan Pace Environmental Litigation Clinic 78 No. Broadway White Plains, NY 10603 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Robert D. Snook Assistant Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120

Indian Point Nuclear Generating Unit No. 2 cc:

Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006