Completion of Acceptance Review Regarding Measurement Uncertainty Recapture Uprate Application
ML051250129
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/12/2005
From: Gabe Taylor
NRC/NRR/DLPM/LPD4
To: Ridenoure R
Omaha Public Power District
Wang A, NRR/DLPM, 415-1445
References
TAC MC6656
Download: ML051250129 (3)


Text

May 12, 2005 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1 - COMPLETION OF ACCEPTANCE REVIEW REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE APPLICATION (TAC NO. MC6656)

Dear Mr. Ridenoure:

In a letter dated March 31, 2005, Omaha Public Power District (OPPD) submitted its application to increase the licensed thermal power level at Fort Calhoun Station, Unit 1 (FCS). The proposed amendment would increase the licensed core power level by 1.5 percent to 1522 MWt (megawatts thermal) with the installation of the CROSSFLOW TM feedwater flow measurement system.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application for FCS, which is based on the determination that sufficient information was provided to allow the NRC staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that OPPD has provided the necessary information for the staff to begin a detailed technical review. However, the NRC staff expects to issue a letter requesting additional information in June 2005, and will request that you respond within 30 days.

If you have any questions, please contact me at 301-415-1305.

Sincerely,

/RA/

Gabriel J. Taylor, General Engineer, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285 cc: See next page

May 12, 2005 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1 - COMPLETION OF ACCEPTANCE REVIEW REGARDING MEASUREMENT UNCERTAINTY RECAPTURE UPRATE APPLICATION (TAC NO. MC6656)

Dear Mr. Ridenoure:

In a letter dated March 31, 2005, Omaha Public Power District (OPPD) submitted its application to increase the licensed thermal power level at Fort Calhoun Station, Unit 1 (FCS). The proposed amendment would increase the licensed core power level by 1.5 percent to 1522 MWt (megawatts thermal) with the installation of the CROSSFLOW TM feedwater flow measurement system.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application for FCS, which is based on the determination that sufficient information was provided to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that OPPD has provided the necessary information for the staff to begin a detailed technical review. However, the NRC staff expects to issue a letter requesting additional information in June 2005, and will request that you respond within 30 days.

If you have any questions, please contact me at 301-415-1305.

Sincerely,

/RA/

Gabriel J. Taylor, General Engineer, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285 cc: See next page DISTRIBUTION:

PUBLIC RidsOgcRp PDIV-2 Reading RidsACRSACNWMailCenter RidsNrrDlpmPdiv(Hberkow) RidsRegion4MailCenter(MHay)

RidsNrrDlpmPdiv2(RGramm) GHill (2)

RidsNrrPMAWang RidsNrrLALFeizollahi ACCESSION NO.: ML051250129 NRR-106 OFFICE PDIV-1/GE PDIV-2/PM PDIII-1/PM PDIV-2/LA PDIV-2/SC NAME GTaylor:sp AWang JStang LFeizollahi RGramm DATE 5/10/05 5/10/05 5/10/05 5/10/05 5/12/05 DOCUMENT NAME: E:\Filenet\ML051250129.wpd OFFICIAL RECORD COPY

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 401 SW 7th Street, Suite D Des Moines, IA 50309 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Centential Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.