Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12012A168 + (CAL 4-11-003, Draft Letter from NRC to David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District)
- ML042910002 + (CAL 4-30-001- Letter Informing of Plans to Conduct Additional Inspection Followup to Assess the Effectiveness of Action Taken in Response to the long-standing Performance Issues Addressed in Confirmatory Action Letter)
- ML18323A119 + (CAL 5 Document Request 2)
- ML063350059 + (CAL Closure Letter CAL 3-04-001, Revision 1)
- ML16084A001 + (CAL Closure Letter for Ohio State)
- ML070180564 + (CAL Closure Request Letter)
- ML061300121 + (CAL Followup - Notice of Upcoming Inspection and Request for Information)
- ML061370095 + (CAL Followup Inspection IP 95002 Action Item Effectiveness Review)
- ML053210197 + (CAL Followup Inspection Information Request Letter IP 95002 Action Item Review)
- ML060940465 + (CAL Inspection - IP 95002 Action Item Review; CAL 3-05-001)
- ML052490301 + (CAL Public Meeting Summary - August 25, 2005)
- ML052920167 + (CAL Public Meeting Summary 10-12-05 to Discuss the Confirmatory Action Letter and Plant Performance, Perry Nuclear Power Plant, Unit 1)
- ML053050486 + (CAL Update Letter - Third Quarter 2005)
- ML20126L473 + (CAL-92-01 Re Concerns W/Seismic Qualifications of Interior DG Bldg Walls.Lists Issues Util Agreed to Complete Prior to Restart of Facility)
- U-000002, CAL-DSU-NU-000002 Rev 00A, Limerick Unit 1 Radiochemical Assay Comparisons to SAS2H Calculations + (CAL-DSU-NU-000002 Rev 00A, Limerick Unit 1 Radiochemical Assay Comparisons to SAS2H Calculations)
- ML18122A066 + (CALC-3020462, Rev. 000, Brr Fuel Rod Segment Shielding Analysis)
- ML12334A009 + (CALC-ANO1-CS-12-00003, Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding, Attachment 1 to 1CAN111202)
- ML14139A380 + (CALC-ANO1-CS-12-00003, Revision 1, Flooding Walkdown Report for Resolution of Fukushima Near Term Task Force Recommendation 2.3, Attachment 1 to 0CAN051402)
- ML12334A007 + (CALC-ANO2-CS-12-00002, Rev. 0, Arkansas Nuclear One Unit 2 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding)
- ML14139A381 + (CALC-ANO2-CS-12-00002, Revision 1, Flooding Walkdown Report for Resolution of Fukushima Near Term Task Force Recommendation 2.3, Attachment 2 to 0CAN051402)
- ML20206D193 + (CAN First Set of Interrogatories & Requests to Produce Served Upon Yaec.* Incorporates & Republishes General Instructions in Necnp First Set of Interrogatories & Requests.With Certificate of Svc.Related Correspondence)
- ML20196F380 + (CAN Reply to Board Order of 990614.* Board Should Find Way to Satisfy Public Right to Know Answers to Questions CAN & Others Raised Re Yankee Rowe Site Contamination.Fees,Costs & Expenses Justified.With Certificate of Svc)
- ML042720191 + (CANs Reply to Yankee Atomic Electric Companys Answer)
- ML042790038 + (CANs Reply to the NRC Staff Answer)
- ML062610472 + (CAP Effectiveness Inspection Information Request)
- ML20266J023 + (CAP End)
- ML19319A310 + (CAP Final Report)
- ML19318G264 + (CAP Final Report)
- ML030760067 + (CAP001763, ISI Scoping of AF-117, AF-4035, Classification of AFW Recirc !Ines, Printed 09/10/2002)
- ML030760076 + (CAP001763, ISI Scoping of AF-117, AF-4035, Classification of AFW Recirc Lines, Printed 09/25/2002)
- ML030760078 + (CAP001804, Inadequate 50.59 Review of Procedure Changes Made to Address AFW Pump Cooling, Printed 11/04/2002)
- ML030730741 + (CAP002353, Weld Size for the New Vertical Air Tanks, T-21 2, Are in Question, Printed 09/10/2002)
- ML030760140 + (CAP004037, CST Inner Coating Degrading, Printed 10/31/2002)
- ML030760146 + (CAP017075, Questions and Concerns About the Use of Operator Action to Control AFW Flow, Printed 11/05/2002)
- ML030760584 + (CAP028472, Auxiliary Feedwater Testing Concerns, Printed 09/10/2002)
- ML030770338 + (CAP029261, Appendix R Classification Discrepancies in AFW Common Recirc Line)
- ML050840506 + (CAP055527 U1R28 Nozzle Dam Installation Supplied Breathing Air Problems)
- ML050840507 + (CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation)
- ML050840497 + (CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation)
- ML050840513 + (CAP055576 SG Manway Removal/Installation RMP Could Generate Cl Opening Without Hl Vent)
- ML050840517 + (CAP055585 Improvement to Hot Leg Vent Path Controls Required)
- ML050870312 + (CAP056236 Control Rod Contacted Top of Fuel Assembly During Rcca Changing)
- ML22004A231 + (CAP88 E-Plan Eval)
- ML22004A236 + (CAP88 E-Plan Evaluation Final)
- ML22004A246 + (CAP88 Report for MVF-th-232wprogeny.SYN)
- 05000254/FIN-2012007-01 + (CAPR Not Completed)
- ML030730742 + (CARB Review Addendum, Increased CDF in AFW Model)
- ML20263S694 + (CAS - Auxiliary Boilers Sampling Control Loop Diagram)
- ML20263S690 + (CAS - Condenser Hotwell Sampling Control Loop Diagram)
- ML20263S698 + (CAS - Feedwater Condensate Sampling Control Loop Diagram)
- ML20263S686 + (CAS - Main Steam & Condensate Sampling Control Loop Diagram)