October 18, 2005 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE OCTOBER 12, 2005, PUBLIC MEETING TO DISCUSS THE CONFIRMATORY ACTION LETTER AND PLANT PERFORMANCE On October 12, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Renaissance Quail Hollow Resort in Painesville, Ohio. The meeting was between the NRC and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the Confirmatory Action Letter (CAL) that was issued on September 28, 2005, regarding commitments to achieve performance improvements at the Perry facility. The meeting notice and NRC presentation slides can be found in ADAMS as ML052710324 and ML052870516, respectively. A list of principal NRC and licensee meeting participants as well as the licensee presentation slides can be found in the attached enclosures.

The NRC began the meeting with an overview of Perrys performance history. This was followed by a discussion of the CAL as well as an overview of upcoming inspection activities at Perry.

The licensees presentation included a description of their revised Performance Improvement Initiative and the implementation status.

At the conclusion of the meeting, time was allotted for public comments and questions.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosures:

As Stated See Attached Distribution

DOCUMENT NAME:E:\Filenet\ML052920167.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DJones:dtp EDuncan DATE 10/18/05 10/18/05 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: G. Leidich, President - FENOC J. Hagan, Chief Operating Officer, FENOC D. Pace, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs M. Wayland, Director, Maintenance Department Manager, Regulatory Compliance T. Lentz, Director, Performance Improvement J. Shaw, Director, Nuclear Engineering Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

FirstEnergy Nuclear Operating Company ADAMS Distribution:

GYS WAM1 RidsNrrDipmIipb GEG KGO RJP DRPIII DRSIII PLB1 JRK1 WDL (IRs only)

Enclosure 1 Principal Meeting Participants NRC W. Macon, Perry Project Manager, NRR M. Satorius, Division Director, DRP, RIII E. Duncan, Branch Chief, DRP, RIII G. Wright, Project Engineer, DRP, RIII R. Powell, Senior Resident Inspector, Perry FirstEnergy Nuclear Operating Company R. Anderson, Vice President, Perry F. von Ahn, Plant Manager, Perry T. Lentz, Director, Performance Improvement, Perry J. Lausberg, Manager, Regulatory Compliance, Perry F. Cayia, Director, Performance Improvement, Perry J. Messina, Manager, Operations, Perry