ML030730741

From kanterella
Jump to navigation Jump to search
CAP002353, Weld Size for the New Vertical Air Tanks, T-21 2, Are in Question, Printed 09/10/2002
ML030730741
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/10/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
CAP002353, FOIA/PA-2003-0094
Download: ML030730741 (3)


Text

S Nuclear Management Company Aýe Page 1 of 3 STATE CHANGE HISTORY Initiate A

bh Submit to Screening AAR Screening ue Complete & Close A Do.

AR Pre-Screen Team 2/28/2002 11:08"43 2/28/2002 11:06 09 AM 3/2812002 11:30:16 AM O

SO AM by JEFF Owner (None)

Owner SCOTT by MARYBETH Owner (None)

POLACEK I1 pr by RUSS WALESH V

PFAFF ARNOLD T

SECTION 1 Activity Request Id:

Activity Type:

CAP002353 CAP Submit Date:

2/28/2002 11:06.09 AM 0 One Line

Description:

Weld size for the new vertical air tanks, T-212, are in question O Detailed

Description:

Initiator:

2/28/2002 11:06AM - JEFF POLACEK:

The 2 vertical air tanks fabricated by Phillips Getschow for modification request MR 02-001 had welds on nozzles that were of questionable size based on the information provided on fabrication drawing #2029011 Revision 2.and supporting calculations. When examined independently by Nuclear Oversight and then by a NDE technician, the weld size acceptability could not be readily determined based on information provided. Since these tanks are not yet installed, this is not an operability issue. AR being submitted jointly with NDE.

POLACEK, JEFF f 1]

Initiator Department:

NP PB QA PB Z

Date/Time of Discovery: 2/28/2002 11:00:18 AM Identified By:

Equipment # (1st):

Equipment # (2nd):

Equipment # (3rd):

Site/Unit:

Why did this occur?:

OA/Nuclear Oversight (None)

(None)

(None)

Date/Time of Occurrence:

System:

Equipment Type (1st):

Equipment Type (2nd):

Equipment Type (3rd):

2/28/2002 11:00:18 AM AF PB (None)

(None)

(None)

Point Beach - None 2/28/2002 11:06AM - JEFF POLACEK:

Unknown Immediate Action Taken: 2/28/2002 11:06AM - JEFF POLACEK:

Spoke to Design/Mod Engineer Recommendations:

0 Notify Me During Eval?:

2/2812002 11:06AM - JEFF POLACEK:

Responsible engineer should review the calcs and based on the weld size, determine if the existing welds are acceptable prior to installation.

Phillips Getschow, Oconto Falls Wisconsin office shall be routed a copy of this CAP in order that they can initiate a Nonconformance report in accordance with their shop Quality control Manual Section 6 "Nonconformance's'.

Y 0 SRO Review Required?:

N SECTION 2 Operability Status:

NA 0 Compensatory Actions:

N Basis for Operability:

2/28/2002 11:08AM - RUSS WALESH:

The equipment is not installed, therefore not an operability issue.

0 Unplanned TSAC Entry:

N G External Notification:

N SECTION 3 httn'l//nmc ttrackonl ine.corm/tmtrack/tmtrack.dII?IssuePa-ge&TableTd= I 000&Recordld= 12'... 9/10/2002

Nuclear Management Company Screened?:

Y INPO OE Reqd?:

N 0 QA/Nuclear Oversight?:

N Good Catch/Well Doc'd?: NA o Significance Level:

Potential MRFF?:

0 Licensing Review?:

SECTION 4 Inappropriate Action:

Process:

(None)

Activity:

(None)

Human Error Type:

(None)

Human Perf Fail Mode:

(None)

Equip Failure Mode:

(None)

Process Fail Mode:

(None)

Org/Mgt Failure Mode:

(None) 0 Group Causing Prob:

(None)

Hot Buttons:

(None)

SECTION 5 CAP Admin:

0 Project:

O State:

O Submitter:

AR Type:

O Last Modifier:

O Last State Changer:

SCOTT PFAFF 6ý Corrective Action Process (CAP)

Done JEFF POLACEK 1*

Parent MARYBETH ARNOLD MARYBETH ARNOLD Prescreener:

O Active/Inactive:

O Owner:

  • Last Modified Date:

O Last State Change Date:

O Close Date:

(None)

Inactive (None) 3/28/2002 11:30:16 AM 3/28/2002 11:30:16 AM 3/28/2002 11:30:16 AM NUTRK ID:

  1. of Children:

References:

Update:

Prescreen Comments:

Import Memo Field:

OPR Completed?:

OLDACTIONNUM:

subtsid:

originalissueid:

Site:

Cartridge and Frame:

N original_project-id:

0 002353 Point Beach ATTACHMENTS AND PARENT/CHILD LINKS C

N N

0 32 Page 2 of 3 I'll 0 / I n In rinn

  • Nuclear Management Company Page 3 of 3 S Linked To CE000265 CHANGE HISTORY 3/512002 10:11:57 AM by JULIE KREIL Last Modified Date Changed From 3/5/2002 10 09:46 AM To 3/5/2002 10.11:57 AM Attachment Added: Unked To CE000265 3/28/2002 11:30:16 AM by MARYBETH ARNOLD State Changed From AR Screening Que To Done Via Transition: Complete & Close Active/Inactive Changed From Active To Inactive Owner Changed From SCOTT PFAFF To (None)

Last Modified Date Changed From 3/5/2002 10:11:57 AM To 3/28/2002 11:30:16 AM Last Modifier Changed From JULIE KREIL To MARYBETH ARNOLD Last State Change Date Changed From 2/28/2002 11:08 43 AM To 3/2812002 11:30:16 AM Last State Changer Changed From RUSS WALESH To MARYBETH ARNOLD Close Date Changed From Unassigned To 3128/2002 11:30:16 AM httt,,.-- I.nm ttre-.-nn p