Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1993-42, Failure of Anti-Rotation Keys in Motor-Operated Valves Manufactured by Yelan +
- ML20045F333 +
- ML20045D235 +
- ML20045D228 +
- ML20045C474 +
- ML20045C102 +
- ML20045B578 +
- ML20045B574 +
- ML20045B533 +
- ML20045B401 +
- ML20045B383 +
- ML20045B295 +
- ML20045B293 +
- ML20045B264 +
- ML20045B255 +
- ML20045B238 +
- ML20045B237 +
- ML20045B138 +
- ML20045B085 +
- ML20045A998 +
- ML20045A997 +
- ML20057B072 +
- ML20056G639 +
- ML20056F313 +
- ML20056F261 +
- ML20056F255 +
- ML20056C918 +
- ML20056C573 +
- ML20056C452 +
- ML20045E324 +
- ML20045C659 +
- ML20045B321 +
- 05000289/LER-1993-005, :on 930510,discovered That Surveillance Procedure Sp 1301-8.1, Reactor Bldg Annual Insp Not Performed by Required Completion Date of 930402.Caused by Lack of Mgt Oversight.Tracking Mechanism Developed +
- 05000354/LER-1993-003-02, :on 930513,plant Transient Initiated When 13.8 Kv Pothead Failed,Inducing Voltage Drop & Phase Differential Relay Actuation Due to Loss of Offsite Power on 2 of 4 Vital Buses.Failed Pothead Replaced +
- 05000361/LER-1992-013, :on 921209,identified Deficiency Involving Check Valve Test Methodology.Applicable Check Valve Procedure Modified.Applicable SONGS Units 2 & 3 IST Implementing Procedures Will Be Evaluated +
- ML20045B300 +
- B14485, Responds to NRC Re Violations Noted in Insp Rept 50-213/93-04.C/As:licensee Will Ensure That If Future Inservice Insp Program Reviews Indicate That an ASME Code Test Cannot Be Met (Safety or Nonsafety) +
- ML20045A831 +
- IR 05000317/1993013 +
- DCL-93-153, Responds to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Affirms That Bulletin Does Not Apply to Hbpp,Unit 3 & Determined That No Action Required in Response to Bulletin for Diablo Canyon,Units 1 & 2 +
- 05000364/LER-1992-011, Informs That Recent Review of LERs Submitted in 1992 Revealed That LER 92-011 Not Submitted & Will Not Be Used for Docket 50-364.Number Originally Assigned for Event Which Was Determined Not to Be Reportable +
- 05000263/LER-1993-006, :on 930323,RPM Actuation Occurred from High Pressure Caused by Inadequate Procedure.Turbine Stop & Control Valve Tightness Test Procedures & Plant Simulator Revised +
- U-602141, Responds to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Only Fibrous Matls Used within Containment or Drywell,Not Located within Separate Room, Consists of Rigid Fiberglass Insulation Matl +
- TAC:L30553 +
- ML20045A910 +
- ML20045B317 +
- ML20045A952 +
- ML20045A813 +
- ML20045B500 +
- IR 07200001/1993002 +