p>* *
- coq
/s.
A
- i)*
E UNITED STATES 0;(;
- j NUCLEAR REGULATORY COMMISSION g
w, f
wasmnotou, o.c. ms-METROPOLITAN EDIS0N COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY EfNNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR CORPORATION DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 174 License No. DPR-50 1.
The Nuclear Regulatory Comission (the Comission) has ivund that:
A.
The application for amendment by GPU Nuclear Corporation, et al.
(the licensee) dated October 28, 1992, as supplemented May 12, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public7~and (ii) that such activities will be conducted in compliance with the Comission's regulations; i
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
9306170104 930609 PDR ADOCK 05000289 P
F
?
, i 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No.
DPR-50 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.174, are hereby incorporated in the license.
GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULA SRY COMMISSION C
,Y
\\N/
oh F. Stolz, Director Pr ject Directorate I-4 vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 9, 1993 1
i i
I ATTACHMENT TO LICENSE AMENDMENT NO.174 1
FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page is identified by an amendment number and contains vertical lines ~ indicating the area of change.
Remove Insert 3-22 3-22 i
V i
I l
a e.
Core flood tank (CFT) vent' valves CF-V3A and CF-V3B shall i
be closed and the breakers to the CFT vent valve motor..
operators shall be tagged open, except when adjusting core flood tank level and/or pressure.
Specification 3.0.1-applies.
3.3.1.3 Reactor Buildino Soray System and Reactor Buildina Emeraency Coolina System The following components must be OPERABLE:
a.
Two reactor building spray pumps and their associated spray i
nozzles headers and two reactor building emergency cooling -
fans and associated cooling units (one in each train).
Specification 3.0.1_ applies.
b.
The sodium hydroxide (NaOH) tank shall be maintained at 8 ft. 6 inches lower than the BWST level as measured by the BWST/NaOH tank differential pressure indicator. The Na0H tank concentration shall be 10.0
.5 weight percent (%).
p' c.
All manual valves in the discharge lines of the sodium hydroxide tank shall be locked open.
3.3.1.4 Coolina Water Systems - Specification 3.0.1 applies.
a.
Two nuclear service closed cycle cooling water pumps must be OPERABLE.
b.
Two nuclear service river water pumps must be OPERABLE.
c.
Two decay heat closed cycle cooling water pumps must be OPERABLE.
d.
Two decay heat river water pumps must be OPERABLE.
e.
Two reactor building emergency cooling river water pumps must be OPERABLE.
3.3.1.5 Engineered Safeguards Valves and Interlocks Associated with the Systems in Specifications 3.3.1.1, 3.3.1.2, 3.3.1.3, 3.3.1.4 are OPERABLE. Specification 3.0.1 applies.
3 3.2 Maintenance shall be allowed during reactor operation on any l
component (s) in the makeup and purification, decay heat, RB emergency cooling water, RB spray, CFT pressure instrumentation, CFT level instrumentation, BWST level instrumentation, or cooling water systems which will not remove more than one train of each system from service. Components shall not be removed from service so that the affected system train is inoperable for more than 72 consecutive hours.
If the system is not restored to meet tha requirements of Specification 3.3.1 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the reactor shall be placed in a HOT SHUTDOWN condition within six hours.
3-22 Amendment No. 7), SP, pp,137,174