Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A909 +
- ML17059A522 +
- ML17059A519 +
- Press Release-94-170, Visit by Indian Nuclear Regulators to Discuss Safety Issues +
- 05000260/LER-1994-009-01, :on 940420,missed TS Surveillance Before Reactor Startup as Result of Misunderstanding of Ts.Util Will Submit TS Change to Clarify Frequency for IRM & APRM Instrumentation Funtional Tests +
- ML18101A329 +
- ML18153B139 +
- ML20078K940 +
- ML20078H302 +
- ML20078G985 +
- ML20078G963 +
- ML20078F408 +
- ML20078E998 +
- ML20078E456 +
- ML20078E468 +
- ML20078E130 +
- ML20078E102 +
- ML20077B415 +
- ML20077A140 +
- ML20073M722 +
- ML20073M697 +
- ML20133G881 +
- ML20133G667 +
- ML20128Q076 +
- ML20149H085 +
- ML20149H080 +
- ML20149H067 +
- ML20149H063 +
- ML20149H057 +
- ML20149G986 +
- ML20149G953 +
- ML20203B494 +
- B15017, Responds to Providing NRC W/Calculations That Documented Technical Justification of Approach for Developing Realistic,Median Centered in-structure Response Spectra for Plant Auxiliary Bldg +
- TAC:M89195 +
- RC-94-0286, Responds to Violations Noted in Insp Rept 50-395/94-18. Corrective Actions:Qa Surveillance Was Performed to Evaluate Control of Safeguards Info +
- JPN-94-057, Requests 6 Month Extension to Original Schedule Commitment for Completion of GL 89-10 Program Re safety-related MOV Testing & Surveillance Program +
- 3F1194-02, Advises That Response to Request for Addl Info Will Be Provided by 941215 Re Fifth Tendon Surveillance +
- L-94-034, Forwards Revised Monthly Operating Repts for Sept 1994 for Point Beach Nuclear Plant +
- NRC-94-4118, Forwards Errata to Rev 1 to Westinghouse Electric AP600 Ssar +
- JPN-94-056, Forwards Two Requests for Relief from ASME Section XI Requirements to Perform Hydrostatic Tests of ISI Class 2 & 3 Sys +
- NG-94-3888, Requests Relief from ASME Code Section XI Requirements NDE-012,NDE-013,NDE-014 & NDE-015 +
- 0CAN119402, Responds to Violations Noted in Insp Repts 50-313/94-20 & 50-368/94-20.Corrective Actions:Procedures Revised to Control ECP Level +
- TAC:M89698 +
- BVY-94-104, Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue +
- ML20149H089 +
- ML20266J801 +
- ML20265A752 +
- ML20265A829 +
- 05000298/LER-1994-025, :on 940930,improper Installation & Calibr of Kaman Normal & High Range Gaseous Activity Detectors Noted. Caused by Personnel Error.Detectors Reinstalled & Recalibrated +
- 05000313/LER-1994-003-04, :on 941008,surveillance Testing of Some Engineered Safeguards Components Did Not Verify Operability as Required by Ts,Due to Procedural Deficiencies Resulting from Inadequate Definition of Testing Requirements +